Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site Information
-
Site Name and Address
-
Activity/Operation
-
Given Site Contact
-
Actual Site Contact
-
Phone Number / Email
-
Other site information
Survey Information
-
Name of Auditor
-
Date of Audit
-
Accompanied By
-
Areas Inspected
-
Documents Viewed
-
Other Survey Information
Building Compliance Risk Audit Findings
Hazard Area
Safety Management Procedures
-
Responsibilities clearly set down and understood.
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Responsible manager is appropriately H&S trained and has the competence necessary to fulfill their responsibilities
-
Asbestos Awareness
-
Legionella Awareness
-
BIFM
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Appropriate routine property compliance audits carried out
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Appropriate H&S information available to staff and others
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Proper arrangements in place for implementing safety control actions
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Emergency plans in place and tested ( fire, pollution, flood etc.)
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Other (specify)
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Log Books & Documentation / Statutory Engineering
-
Property compliance audit reports complete and up-to-date
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Site log book is accurate, complete and correct, notably:
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Fixed electrical wiring inspection records correct
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Portable Appliance testing records correct
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Gas safety inspection &testing records correct
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Other log book records correct (specify)
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Insurance inspections for lifting plant in place and correct
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Other statutory plant inspections in place and correct
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Pressure system scheme in place and correct
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Other (specify)
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Asbestos
-
Asbestos survey in place and management plan up-to-date
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Asbestos register / risk assessment up-to-date
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Identified asbestos materials under proper control
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
No evidence of uncontrolled asbestos in property
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Fire Safety
-
Fire life safety arrangements correct
-
Fire risk assessment in date.
-
Action plan being followed.
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Fire safety asset protection arrangements correct
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
No uncontrolled sources of fuel / ignition
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Fire management log book(s) correct and complete
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Weekly fire alarm tests undertaken and recorded.
-
Emergency lighting tests undertaken and recorded.
-
Fire extinguishers within service date
-
Fire extinguishers suitably located.
-
Other (specify)
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Water Hygiene
-
Legionella sensitive water systems under proper control
-
Water risk assessment available to view
-
Remedial works completed.
-
Tap temperatures correct and being recorded
-
Boiler/Calorifier flow and return temperatures correct and being recorded.
-
Works orders raised to rectify any temperature variations from L8.
-
Water hygiene sampling being undertaken.
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Other (specify)
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Contractor Safety Performance & Management
-
Only approved contractors permitted to work on site
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Proper liaison between contractors and site manager
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Sample of contractor RAMS audited & appear appropriate to the task and work areas
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
PPM tasks affecting compliance carried out in a timely and competent manner to a good standard & recorded correctly
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Sample of contractor COSHH assessments audited & correct
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Contractor Permit-to-Work procedures appropriate and correct
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Contractor Performance standards, safety controls & housekeeping meets standards where observed
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Statutory engineering tasks undertaken in a timely and competent manner & recorded correctly
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
-
Other (specify)
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Plant and Equipment Issues
Passenger Lifts
-
Passenger lifts appear in good condition and properly maintained, with lift room securely locked and machinery guarded
-
Records of maintenance available
-
Records of thorough inspection and testing available.
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Goods Lifts
-
Goods Lifts appear in good condition and properly maintained, with lift room securely locked and machinery guarded
-
Records of maintenance available
-
Records of thorough inspection and testing available.
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Other Lifting Equipment
-
Other lifting equipment appear in good condition and properly maintained, securely locked against unauthorised use and machinery guarded
-
Records of maintenance available
-
Records of thorough inspection and testing available.
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Access Equipment
-
Access equipment appears in good condition and properly maintained, securely locked against unauthorised use and machinery guarded
-
Records of maintenance available
-
Records of thorough inspection and testing available.
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Fall Arrest Equipment
-
Fall arrest equipment appears in good condition and properly maintained, securely locked against unauthorised use and machinery guarded
-
Records of maintenance available
-
Records of thorough inspection and testing available.
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Fixed Ladders
-
Fixed ladders appear in good condition and properly maintained, securely locked against unauthorised use and machinery guarded
-
Records of thorough inspection and testing available.
-
Records of maintenance available
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Boiler Plant
-
Boiler plant appears in good condition and properly maintained
-
Records of maintenance available
-
Annual service certificate available.
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Air Handling Plant
-
Air handling plant appears in good condition and properly maintained
-
Records of maintenance available
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Powered Gates
-
Powered gates appear in good condition and properly maintained
-
Records of maintenance available
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Roller Shutters
-
Roller shutters appear in good condition and properly maintained
-
Records of maintenance available
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Lightening Protection
-
Lightening protection appears in good condition and properly maintained.
-
Records of maintenance available
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Car Park Barriers
-
Car park barriers appear in good condition and properly maintained
-
Records of maintenance available
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Other Plant
-
Other plant (specify ) appears in good condition and properly maintained, securely locked against unauthorised use/access, and machinery is guarded.
-
Records of maintenance available
-
Records of thorough inspection and testing available.
-
Action to reduce risk to tolerable level / Comments
-
Action Priority
Other General Observations / Notes
-
Auditor
-
Site Contact