Client and Tenure
- Owner Occupier
- Exeter City Council
- Shal Housing
- Rooftop
- Alliance Homes
- Abri
- Magna
- Celtic Horizons
- Live West
- Other
- Privately Rented
-
Survey Type
- LCX Combined Measure Survey F253
-
First Line of Address
-
Front Elevation Photo
-
GPS
Resident and Occupancy Details
Customer Details
-
Resident Name
-
Resident Contact Number
-
Resident Email
-
Best Days for Installation / Days to Avoid
-
Current Energy Supplier
- Utilita
- British Gas
- EON
- EDF
- Octopus
- OVO
- nPower
- Scottish Power
- SSE
- Other
- Unknown
-
Which Supplier?
-
Is More Detailed Occupancy Information Required?
-
Is the occupancy considered typical for the property?
-
Over or Under Occupied?
-
How many people live in the property?
-
Is there a thermostat?
-
Is the thermostat maintained at a typical temperature?
-
Is this due to the thermostat temperature being considered higher or lower than typical?
-
Is the heating pattern considered typical for the property?
-
Is this due to the heating pattern being considered higher or lower than typical?
-
Does the customer utilise all heat emitters within each room that contains them?
-
Has the customer been made aware of the process of gathering personal data and relevant Data Protection policies?
-
Can you identify any existing Energy Efficiency Measures that have been installed?
-
Current Energy Efficiency Measures
-
Do you believe that all current Energy Efficiency Measures are being used correctly?
Basic Property Details
Basic Property Details
-
Property Type
-
What Type
-
Attachment
- Semi
- Detached
- Linked
- Mid Terraced
- End Terraced
- Ground Floor
- Top Floor
- Mid Floor
- Other
-
Building Finish
- Brick
- Painted Render
- Brick/Render
- Pebble Dash
- Recon Stone
- Spar
- Limestone/Sandstone
- Granite/Whinstone
- Faced brick in a high exposure area not suitable for cavity wall insulation
-
Construction Type
- Cavity Wall
- Solid Brick
- System Built
- Metal Frame
- Other
-
Structural Condition of Wall
-
Structural Issues/Remedial Works Required
-
Details of remedial works and photos
-
Photo of remedial works required
-
Age Band
- A - Pre 1900
- B - 1900 - 1929
- C - 1930 - 1949
- D - 1950 - 1966
- E - 1967 - 1975
- F - 1976 - 1982
- G - 1983 - 1990
- H - 1991 - 1995
- I - 1996 - 2002
- J -2003 - 2006
- K - 2007 - 2011
- L - 2012 onwards
-
Listed Building / Conservation Area
-
Has the Council Website Been Checked at Point of Survey?
-
Should the planning department be notified?
-
Number of Storeys
- 1
- 2
- 3
- 4
- 5
- 6
-
Floor Construction Type
- Solid
- Suspended Timber
- Suspended, Not Timber
- Unknown
-
Structural Condition of Floor
-
Structural Condition of Roof
-
Internal Inspection of Building Completed
-
What Condition is the Inside
- No Internal Issues Visible
- Damage to Ceiling
- Water Stain on Ceiling
- Low Level Damp Near Skirting Boards
- Black Mould in the Corners of the Rooms
- Black Mould on the Ceiling and Walls
- Condensation on the Windows and External Walls
-
Photographic Evidence
-
Number of Bedrooms
- 1
- 2
- 3
- 4
- 5
- 6
-
Number of Bathrooms
- 1
- 2
- 3
- 4
- 5
- 6
-
Main Heating Type?
- Mains Gas
- Oil
- Solid Fuel
- Electric
- Renewable Energy
- LPG
- Heating not working at the time of survey
-
Photographic Evidence
-
Secondary Heat source?
- Gas Fire with Flue
- Gas Fire with chimney
- Gas Fire Flush Fitted
- Open Fire with internal chimney
- Open Fire with external chimney
- Wood Burner
- Electric Effect Fire
- No other heating present
-
Photographic Evidence
-
Safety Monitors Present
- Smoke Alarm
- CO2 Alarm
- Fire Alarm
-
At the time of attending the property did you witness any protected animals/did the resident make you aware of any protected animals?
-
Give Details
-
On Site Parking
-
Where?
-
Any Access Issues
-
What Issues are Present
Loft Insulation Survey
Loft Insulation Survey
-
Is Loft Insulation a Proposed Measure?
-
Is the Loft Accessible?
-
Is loft to be insulated.
- Yes loft requires topping up
- No Loft has sufficient insulation
- Unable to check due to the amount of tenants belongings.
-
Photo of loft and access point
-
Loft Hatch Size?
-
Area to be insulated.
-
Existing Depth.
- 0mm
- 12mm
- 25mm
- 50mm
- 70mm
- 80mm
- 100mm
- 125mm
- 150mm
- 170mm
- 200mm
- 250mm
- 270mm
- 300mm plus
-
Photo of existing depth.
-
Depth to be added.
- Existing over 250mm
- 100mm
- 150mm
- 170mm
- 200mm
- 250mm
- 270mm
- 300mm
-
Pipes and Tanks Present
-
Details of Pipes and Tanks to be insulated
-
Down lights present in ceiling?
-
Details of down lights, how many and there current location
-
Do they have halogen bulbs fitted.
-
Can you see the IP rating on the casing?
-
Please take a photo of the down light IP rating.
-
Are there any existing down light covers fitted?
-
If YES are they fire rated covers?
-
Electrical wiring free from visual defects?
-
Are there any high voltage cable's in the loft space.
-
If YES please select the type of cable in the loft space.
- Cooker cable
- Shower cable
- Immersion cable
- PV cable
-
In your opinion should loft be Rolled or Blown?
-
Loft Height at Centre
- 0.80 metres
- 0.90 metres
- 1.00 metres
- 1.20 metres
- 1.40 metres
- 1.50 metres
- 1.60 metres
- 1.80 metres and above.
-
Does a steel combustion flue pass through the loft space?
-
Relay of Insulation Required?
-
Loft hatch needing D/P
-
Loft vents required
-
Areas to be omitted
-
What Areas?
-
Does the loft have any boarding?
-
If YES can we insulate at lease 2/3 of the loft space?
-
Has the boarded area got insulation under it?
-
If not insulated under, are the joist tunnels tightly sealed with insulation at the ends?
-
Walkway required
-
Details of walkway
-
Loft clearance
-
Details of loft clearance
-
Additional notes
-
Why?
- No Hatch
- Hatch Blocked
- Hatch Over Stairs (Cannot Access Safely)
- Resident Refused Access
- Other
-
What?
Cavity Wall Insulation Survey
Cavity Wall Survey
-
Is Cavity Wall Insulation a Proposed Measure?
-
Required material.
-
Total area to be insulated.
-
Any Omitted Areas
-
Total area to be omitted.
-
Photos of omitted areas.
-
Material to be Extracted
- Yellow/White Fibre
- Foam
- Rockwool
- Loose Polystyrene Bead
- Debris / Rubble
- Over Bonded Bead
-
Average Cavity Depth
- 40mm
- 45mm
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
- 75mm
- 80mm
- 85mm
- 90mm
- 95mm
- 100mm
- 105mm
- 110mm
- 115mm
- 120mm
- 125mm
- 130mm
- 135mm
- 140mm
- 145mm
- 150mm
- 155mm
- 160mm
- 165mm
- 170mm
- 175mm
- 180mm
- 185mm
- 190mm
- 195mm
- 200mm
-
Please take a photo of the overall cavity width across a door or window reveal.
-
Please select the type of ventilation present, including extraction ventilation and trickle vents.
- Bedroom ventilation
- Combustion ventilation
- Bathroom ventilation or extraction fan
- Kitchen ventilation or extraction fan
- Pantry vents
- Underfloor vents
- Trickle vents
- None
-
Please take a photo of all vents and extraction fans fitted within the property including at least 2 photos of window trickle vents.
-
Do any of the air vents require sleeving or sealing up before installing the cavities.
-
If yes please select the air vents that require sleeving or sealing up.
- Bedroom ventilation
- Combustion ventilation
- Bathroom ventilation or extraction fan
- Kitchen ventilation or extraction fan
- Pantry vents
- Underfloor vents
- Trickle vents
- None
-
Adjoining properties insulated ?
-
Number of Cavity brushes required.
-
Location of Flue
- Front
- Rear
- Left from front
- Right from front
- Garage and/or outbuilding
- Other elevations
- N/A
-
Combustion core vent required.
-
Number of combustion vents required.
Front Elevation.
-
Cavity Depth.
- 40mm
- 45mm
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
- 75mm
- 80mm
- 85mm
- 90mm
- 95mm
- 100mm
- 105mm
- 110mm
- 115mm
- 120mm
- 125mm
- 130mm
- 135mm
- 140mm
- 145mm
- 150mm
- 155mm
- 160mm
- 165mm
- 170mm
- 175mm
- 180mm
- 185mm
- 190mm
- 195mm
- 200mm
-
Photo of the elevation inc Boroscope hole marked with an S.
-
Borescope Photos
-
Photo of DPC showing a tape measure
-
Is a French Drain Required?
-
Is the DPC bridged at any point on this elevation?
-
Photos of tape measure in the cavity.
-
Comments
Rear Elevation
-
Cavity Depth
- 40mm
- 45mm
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
- 75mm
- 80mm
- 85mm
- 90mm
- 95mm
- 100mm
- 105mm
- 110mm
- 115mm
- 120mm
- 125mm
- 130mm
- 135mm
- 140mm
- 145mm
- 150mm
- 155mm
- 160mm
- 165mm
- 170mm
- 175mm
- 180mm
- 185mm
- 190mm
- 195mm
- 200mm
-
Photo of the elevation inc Boroscope hole marked with an S.
-
Borescope Photos
-
Photo of DPC showing a tape measure
-
Is a French Drain Required?
-
Is the DPC bridged at any point on this elevation?
-
Photos of tape measure in the cavity.
-
Comments
Right hand elevation
-
Is there a right hand elevation on this property
-
Cavity Depth
- 40mm
- 45mm
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
- 75mm
- 80mm
- 85mm
- 90mm
- 95mm
- 100mm
- 105mm
- 110mm
- 115mm
- 120mm
- 125mm
- 130mm
- 135mm
- 140mm
- 145mm
- 150mm
- 155mm
- 160mm
- 165mm
- 170mm
- 175mm
- 180mm
- 185mm
- 190mm
- 195mm
- 200mm
-
Photo of the elevation inc Boroscope hole marked with an S.
-
Borescope Photos
-
Photo of DPC showing a tape measure
-
Is a French Drain Required?
-
Is the DPC bridged at any point on this elevation?
-
Photos of tape measure in the cavity.
-
Comments
Left hand elevation
-
Is there a left hand elevation on this property
-
Cavity Depth
- 40mm
- 45mm
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
- 75mm
- 80mm
- 85mm
- 90mm
- 95mm
- 100mm
- 105mm
- 110mm
- 115mm
- 120mm
- 125mm
- 130mm
- 135mm
- 140mm
- 145mm
- 150mm
- 155mm
- 160mm
- 165mm
- 170mm
- 175mm
- 180mm
- 185mm
- 190mm
- 195mm
- 200mm
-
Photo of the elevation inc Boroscope hole marked with an S.
-
Borescope Photos
-
Photo of DPC showing a tape measure
-
Is a French Drain Required?
-
Is the DPC bridged at any point on this elevation?
-
Photos of tape measure in the cavity.
-
Comments
Building extensions
-
Is there an extension on this property
-
Cavity Depth
- Yes please see post extraction report above.
- No, debris needs removing and wall ties cleaning and still a small amount of existing insulation to be removed.
- No, remedial works required before cavities refilled
- No, old insulation still present.
- Having scoped the cavities I'm unable to detect any issues with the existing cavity wall insulation.
-
Photo of the elevation inc Boroscope hole marked with an S.
-
Borescope Photos
-
Photo of DPC showing a tape measure
-
Is a French Drain Required?
-
Is the DPC bridged at any point on this elevation?
-
Photos of tape measure in the cavity on each elevation.
-
Comments
Additional Ventilation Questions if Funding is Available
Funding Questions
-
Is Funding Available?
-
Does the property meet the minimum acceptable ventilation requirements set out in PAS 2035?
-
Does the cooker have a hood which ventilates to the outside?
-
Is there an airing cupboard or drying room that is ventilated to the outside?
-
Is there a tumble dryer which is vented to the outside of the property?
-
Do all wet rooms have as a minimum some from of passive or purge ventilation? (opening windows, air bricks or trickle vents)
-
Do all wet rooms have closing doors?
-
Is there a passive ventilation system?
-
Is there a mechanical ventilation system? (Continuous mechanical extract ventilation, Continuous mechanical ventilation with heat recovery)
-
Is there evidence of intermittent heating to parts of the property ?e.g TRV's being turned down too low to unused areas.
-
Are there appropriate controls in place to regulate the heating in the property?(thermostat, programmer etc)
-
Is the thermostat set to a minimum of 10 Celsius in all parts of the property that are heated?
-
Is there evidence of clothes being dried in the property?
-
Are there more bedrooms than occupants?
-
Is there single glazing at the property?
-
Has the importance of behaviour to moisture and condensation been explained to the occupants and left behind?
-
Is there a condensation calculation required? If so what elements?
External Wall Insulation Survey
External Wall Insulation Survey
-
Is an external wall insulation survey required?
-
Number of elevations to be treated
- 1
- 2
- 3
- 4
- 5
- 6
-
Does the wall have cavity insulation?
-
If no, has the cavity been sealed at the perimeter?
-
Need for fire separation of the compartments/Boundaries defined:
-
EEM Design: Accounts for the Building Regulation requirements for fire:
EEM DESIGN:
-
Design accounts for building exposure:
-
Design accounts for loading in service e.g Impact:
-
Comments
-
Design eliminates thermal bridging:
-
Design minimises thermal bridging
Existing Finishes: External/Internal
-
Agrees with Retro fit Assessment and Design
-
External Finishes
- Stone
- Brick
- Sand & Cement Render
- Mass Concrete
- Dry dash
- Wet Dash
- Concrete Block
- Wood paint
- Tile Hanging
- Other
-
Please state other type of finish.
-
Internal: Colours & Textures
- Plaster skim
- Plaster board
- Sand and Cement
- Insulated Plaster Board
- Timber
- Other
-
Other internal finishes please specify:
- Wallpaper
- Paint
- Tiles
-
Comments:
Through Wall Construction
-
Internal to external surface layers
-
Overall Wall Thickness
-
Photo of wall thickness
-
Layer 1
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 2
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 3
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 4
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 5
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 6
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 7
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Has a second through wall construction been identified ?
-
Overall Wall Thickness
-
Photo of wall thickness
-
Layer 1
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 2
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 3
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 4
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 5
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 6
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 7
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Has a third through wall construction been identified ?
-
Overall Wall Thickness
-
Photo of wall thickness
-
Layer 1
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 2
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 3
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 4
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 5
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 6
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 7
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
Property Elevation Photos
-
Which Elevations exist on this property
- Front
- Rear
- Left from front
- Right from front
- Garage and/or outbuilding
- Other elevations
- N/A
-
Photos
Property Measurements:
-
Property Sketch Photos with Measures
Enabling
-
Satellite Dish works (qty)
-
TV Ariel (qty)
-
External Lights (qty)
-
Alarms (qty)
-
CCTV (qty)
-
Electric Cables (description and lm)
-
Satellite Cables (lm)
-
Electric Box (Type and qty)
-
BT Box (qty)
-
Gas Box (Type and qty)
-
Gas Flue (position and qty)
-
Gas Pipework (lm)
-
Condense Pipework (lm)
-
PRV (qty)
-
Overflow (qty)
-
External Tap (qty)
-
Downpipes (Number of downpipes and lm)
-
Soil and Vent Pipe (connections and lm)
-
Vent Pipe (lm)
-
Through soffit (Y/N)
-
Gates (Material and qty)
-
Fence panels (material and qty)
-
Fence posts (material and qty)
-
Walls (construction type and description)
-
Canopy/Porch (material and qty)
-
Vegetation (day work estimation)
-
Handrail (material and lm/brackets)
-
Grab rails (material and qty)
-
Scaffolding Bridge (qty)
-
Window Cills (over or under)
-
Insulated Plinth Detail (lm)
STRUCTURAL DEFECTS (E.g. Cracking, subsidence,weak or cored components):
-
Is there any evidence of structural defects ?
-
What are the Details?
-
Requires Competent Person e.g. Structural Engineer
-
Photos of Structural Defects
-
EEM Design:
-
Structural repairs included in the design before works start
-
Structural repair to be carried out by others before works start
-
Site pull-out tests undertaken for mechanical fixings
-
System fixing design calculated for all loading conditions ( wind,system weight etc.)
-
Design eliminates thermal bridging
-
Design minimises thermal bridging
-
Interface design details( weather seals etc.) comply with requirements of PAS 2030 2019
EXISTING RENDER:
-
Comments:
- No evidence of defects
- Defects apparent
-
Comments on apparent defects
-
Agrees with Retrofit Assessment/Design
-
Photo(s)
-
EEM Design:
-
Requires removal, partial removal, repair
-
Render repair included in the design
-
Render repair measure to be carried out by others prior to works.
PRESENCE OF DAMP (RISING, PENETRATING OR CONDENSATION):
-
Comments
-
Comments on damp
-
Photo(s)
-
EEM Design:
-
Damp treatment included in the design
-
Damp treatment measure to be carried out by others prior to works starting.
FROST DAMAGE:
-
Comments
- No evidence of weathering damage
- Evidence of weathering damage
-
Photo(s)
-
EEM Design:
-
Frost repair included in the design
-
Frost repair measure to be carried out before
DETAIL/LOCATION OF MOVEMENT JOINTS:
-
Are there Movement Joints
- No movement joints in existing or required by EEM
- Movement joints in existing
- New movement joints required
-
Comments of movement joints
-
Photo(s)
-
EEM Design:
-
Included in the design
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Interface design details (weather seals etc.) comply with the requirements of PAS 2030 2019
MOSS/LICHEN/MOULD/IVY or EFFLORESCENCE
-
Is MOSS/LICHEN/MOULD/IVY or EFFLORESCENCE present
-
Comments of growth
-
Photo(s)
-
EEM Design:
-
Remediation included in the design
-
Design eliminates cold bridging
-
Design minimises cold bridging
-
Interface design details (weather seals etc.) comply with requirements of PAS 2030 2017
WINDOWS/DOOR MATERIAL:(Timber/PVC/Other):
-
Photo(s):
-
Window material type
- UPVC
- Timber
- Metal
- Composite
-
Window Renewal
-
Door material type
- UPVC
- Timber
- Metal
- Composite
-
External Door Renewal
-
EEM Design:
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Interface design details (weather seals around cill, window frame etc.) comply with requirements of PAS 2030/2019
-
Comments:
EXTERNAL SERVICES/ATTACHMENTS TO THE WALLS e.g (Satellite dish, lights):
-
Photo(s)
-
EEM Design:
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Interface design details (weather seals around cill, window frame etc) comply with requirements of PAS 2030/2019
-
Comments:
EXTERNAL ELECTRICAL CABLES/EQUIPMENT:
-
Photo(s)
-
EEM Design:
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Design details (Penetration,fixings, weather seals etc.) comply with requirements of PAS 2030 2019
-
Comments:
EWI ABUTMENT TO EAVES & ROOFS:
-
Photo(s)
-
EEM Design:
-
Design eliminates Thermal bridging (full continuity between wall and the roof insulation)
-
Design minimises Thermal bridging (partial continuity between wall and roof insulation)
-
Interface design details (weather seals etc.) comply with the requirements of PAS 2030/2019
-
Comments:
EWI ABUTMENT TO OTHER STRUCTURES (Conservatories extensions, garden walls, gate posts etc):
-
Photo(s)
-
EEM Design:
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Interface design details (weather seals etc.) comply with requirements of PAS 2030/2019
-
Comments:
RAIN WATER AND DRAINAGE PIPES:
-
Photo(s):
-
EEM Design:
-
Can existing Pipework be moved ?
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Design details (Penetrations, fixings, weather seals, mounting blocks etc.) comply with the requirements of PAS 2030/2019
-
Comments:
DAMP PROOF COURSE(DPC) PROVISION AND LOCATION:
-
Photo(s) of DPC (Each Elevation)
-
EEM Design:
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Design details (E.g Insulated plinth below DPC) complies with requirements of PAS 2030/2019
-
Comments (including any insulated plinth detail and location)
ARCHITECTURAL FEATURES (e.g. protruding stone work, tile sills, soldier courses):
-
Photo(s)
-
EEM Design:
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Design details (Penetrations, fixings, weather seals,etc.) comply with requirements of PAS 2030 2019
-
Comments:
Ventilation Survey
Ventilation Survey
-
Is a Ventilation Survey Required?
-
Living Room?
-
Has Required Door Undercuts
-
Door Requires Trimming
-
Has Purge Ventilation
-
Has Trickle Vents / Background Ventilation
-
Photos
-
Dining Room?
-
Has Required Door Undercuts
-
Door Requires Trimming
-
Has Purge Ventilation
-
Has Trickle Vents / Background Ventilation
-
Photos
-
Bedroom 1?
-
Has Required Door Undercuts
-
Door Requires Trimming
-
Has Purge Ventilation
-
Has Trickle Vents / Background Ventilation
-
Photos
-
Bedroom 2?
-
Has Required Door Undercuts
-
Door Requires Trimming
-
Has Purge Ventilation
-
Has Trickle Vents / Background Ventilation
-
Photos
-
Bedroom 3?
-
Has Required Door Undercuts
-
Door Requires Trimming
-
Has Purge Ventilation
-
Has Trickle Vents / Background Ventilation
-
Photos
-
Bedroom 4?
-
Has Required Door Undercuts
-
Door Requires Trimming
-
Has Purge Ventilation
-
Has Trickle Vents / Background Ventilation
-
Photos
-
Bedroom 5?
-
Has Required Door Undercuts
-
Door Requires Trimming
-
Has Purge Ventilation
-
Has Trickle Vents / Background Ventilation
-
Photos
-
Study?
-
Has Required Door Undercuts
-
Door Requires Trimming
-
Has Purge Ventilation
-
Has Trickle Vents / Background Ventilation
-
Photos
-
Other Specify?
-
What Room
-
Has Required Door Undercuts
-
Door Requires Trimming
-
Has Purge Ventilation
-
Has Trickle Vents / Background Ventilation
-
Photos
-
Kitchen?
-
Has Extractor Fan
-
Is the Extractor Fan Working
-
Extractor Fan Flow Rate
-
Does it Require Replacement?
-
Does it Require Replacement
-
New Extractor to be Installed in Kitchen
-
Has Required Door Undercuts
-
Door Requires Trimming
-
Has Purge Ventilation
-
Has Trickle Vents / Background Ventilation
-
Photos
-
Bathroom?
-
Has Extractor Fan
-
Is the Extractor Fan Working
-
Extractor Fan Flow Rate
-
Does it Require Replacement?
-
Does it Require Replacement
-
New Extractor to be Installed in Bathroom
-
Has Required Door Undercuts
-
Door Requires Trimming
-
Has Purge Ventilation
-
Has Trickle Vents / Background Ventilation
-
Photos
-
W/C?
-
Has Extractor Fan
-
Is the Extractor Fan Working
-
Extractor Fan Flow Rate
-
Does it Require Replacement?
-
Does it Require Replacement
-
New Extractor to be Installed in W/C
-
Has Required Door Undercuts
-
Door Requires Trimming
-
Has Purge Ventilation
-
Has Trickle Vents / Background Ventilation
-
Photos
PV Survey
PV Survey
-
Is a PV Survey Required
Roof Type
-
Roof Style
- Gable Roof
- Hipped Roof
- Gambrel Roof (barn style)
- Flat Roof
- Mansard Roof
- Shed Roof
-
Tile Type
- Plain tiles / Slates (solar limpets)
- Low profile Interlocking tiles / Redland Tiles (220 wide)
- Profiled Tiles (Standard)
- Flat Roof
-
Tile Description (clay or concrete, interlocking or lapped)
- Clay
- Concrete
- Slate
- Interlocking
- Lapped
- Unknown
Roofing and Scaffold
-
Scaffold Location
- Front
- Back
- Left Side
- Right Side
-
Height of Eaves?
-
Required Access to rear?
-
Location of rear access
-
Where?
-
Length (along gutter) Metres
-
Height (up roof slope) Metres
-
Pitch ° degrees
-
Height of Roof Above Eaves?
-
Orientation from South (south = 0º East = West =+) degrees
-
Is the Loft Accessible?
-
Roof type
-
Size of Purlin
-
Number of Purlin supports
-
Maximum Unsupported Rafter Length
-
Size of Rafters/Top Chord of Truss
-
Number of Trusses/Rafters
-
Rafter/Truss Centres
-
Timber Condtion
-
Felt Condition
-
Observations (e.g holes in felt around gas flue)
-
Loft Condition
- Clear
- Cluttered
- Tenant Agreed to clear loft
- Area Around Hatch Blocking Access
-
Any Issues With Loft access
-
Loft Headroom Meters
- 0.80 metres
- 0.90 metres
- 1.00 metres
- 1.20 metres
- 1.40 metres
- 1.50 metres
- 1.60 metres
- 1.80 metres and above.
-
Temporary Loft Light Required
-
Temporary Loft Walkway Required
-
Why?
- No Hatch
- Hatch Blocked
- Hatch Over Stairs (Cannot Access Safely)
- Resident Refused Access
- Other
-
Notes
Electrics
-
Consumer Unit Make and Model (e.g. Crabtree, Starbreaker)
- Crabtree
- Starbreaker
- Hager
- Lewden
- MK
- Schneider
- Other
- Unable to Access
-
What Brand?
-
Breaker Type
-
Location
- Under Stairs
- Front Hallway
- Cupboard
- Other
- Under Sink
- Unknown
-
Where?
-
Distribution Board Upgrade Required
-
Spare Way for PV
-
Additional Garage DB Required for PV
-
Earthing to Gas Meter
-
Gas Meter Location
- Under Stairs
- Front Hallway
- Cupboard
- Other
- Under Sink
- Unknown
-
Where?
-
Earthing to Water Main
-
Water Main Location
- Under Stairs
- Front Hallway
- Cupboard
- Other
- Under Sink
- Unknown
-
Where?
-
Earthing Type
Import Meter Type
-
Meter Type
-
Does Meter require changing?
-
Make and Model of Meter
-
Meter Serial Number
-
Is the MPAN Number Present
-
What is the MPAN Number
-
Is there room for the 4 pole isolation switch next to the existing meter
-
Import Meter Location
-
Where is it?
-
Generation Meter Location (Proposed)
-
Where shoud it be located?
Photovoltaic System Proposed
-
Proposed Inverter Location
-
Where should is be located?
-
Can a 600 x 780 board fit on wall and through internal roof access
-
Approx AC cable run length from Consumer Unit to Inverter
-
Cellular Networks Checked with Good Signal?
- O2
- Vodaphone
- BT EE
- 3
- Other
Photo Checklist
-
Property Elevations, Front Door & Scaffold Access
-
Suitable Roof Elevation Close Up including gutter
-
Proposed Inverter Location
-
Roof Void if relevant including TV ariel
-
Consumer Unit and Close up of Breakers
-
Electricity Meter & Mains Fuse / Earth in Meter Box
-
Water main bond
-
Gas Main bond (if applicable)
-
Satellite dish (if any) including closeup of bracket
Shading
-
Has SunEye Survey been completed
-
Why?
-
Notes
-
Notes
Air Source Heat Pump Survey
-
Is an Air Source Heat Pump Survey Required
-
Water Pressure
-
BBU Removal Required
-
Photographic Evidence
-
Fireplace Removal/Block up Required
-
Photographic Evidence
-
Window Material Type
-
Loft Water Tank Removal
-
Electricity Cost per kWh
-
Fuse Board and Main Fuse Cut Out Rating
-
Main Fuse Cut Out Rating
-
Is the mains service looped? (2 cables, 1 coming out to neighbours propoerty)
-
Photographic Evidence
-
Smart Meter Installed?
-
Electric Meter Photographic Evidence
Cylinder Cupboard
-
Door Size
-
Cupboard Depth, Width & Height
-
Photographic Evidence of Cylinder Cupboard
-
What Size of Cylinder Will Fit
-
How will the Dischage Pipe Route to Outside be done
-
Existing Cylinder Type
Proposed Heat Pump
-
Bracket Type
-
Proposed Location
-
Proposed Location Photo
-
ASHP Soak Away Required
-
Recommendation
-
Pipework Upgrade to 28mm Required? (Daikin Requires 28mm). State length.
-
Trunking Requirements
-
Can the External Unit be Installed 1m from Boundary
-
Recommended Solution
-
How Many Reflective Surfaces
-
Distance to Nearest Habitable Room
-
From Assessment Area What Barrier is in Place
Thermostat
-
Current Thermostat Position
-
Photo of Current Location
-
Proposed Thermostat Position
-
Photo of Proposed Location
Existing Heating
-
How Many Storage Heaters/Radiators Need to be Removed?
-
Storage Heater Serial Number (For Asbestos Purposes)
Room Details
-
Floor Construction Type
-
Floorplan Showing Individual Room Sizes and Ceiling Height
-
Living Room
-
Window Sizes
-
Number of Outside Walls
-
Internal Wall Type
-
Max Space Available for Radiator (Length, Height)
-
Existing Radiator Size
-
Photo
-
Hallway
-
Window Sizes
-
Number of Outside Walls
-
Internal Wall Type
-
Max Space Available for Radiator (Length, Height)
-
Existing Radiator Size
-
Photo
-
Dining Room
-
Window Sizes
-
Number of Outside Walls
-
Internal Wall Type
-
Max Space Available for Radiator (Length, Height)
-
Existing Radiator Size
-
Photo
-
Upper Floor Hallway/Landing
-
Window Sizes
-
Number of Outside Walls
-
Internal Wall Type
-
Max Space Available for Radiator (Length, Height)
-
Existing Radiator Size
-
Photo
-
Bedroom 1
-
Window Sizes
-
Number of Outside Walls
-
Internal Wall Type
-
Max Space Available for Radiator (Length, Height)
-
Existing Radiator Size
-
Photo
-
Bedroom 2
-
Window Sizes
-
Number of Outside Walls
-
Internal Wall Type
-
Max Space Available for Radiator (Length, Height)
-
Existing Radiator Size
-
Photo
-
Bedroom 3
-
Window Sizes
-
Number of Outside Walls
-
Internal Wall Type
-
Max Space Available for Radiator (Length, Height)
-
Existing Radiator Size
-
Photo
-
Bedroom 4
-
Window Sizes
-
Number of Outside Walls
-
Internal Wall Type
-
Max Space Available for Radiator (Length, Height)
-
Existing Radiator Size
-
Photo
-
Bedroom 5
-
Window Sizes
-
Number of Outside Walls
-
Internal Wall Type
-
Max Space Available for Radiator (Length, Height)
-
Existing Radiator Size
-
Photo
-
Study
-
Window Sizes
-
Number of Outside Walls
-
Internal Wall Type
-
Max Space Available for Radiator (Length, Height)
-
Existing Radiator Size
-
Photo
-
Kitchen
-
Window Sizes
-
Number of Outside Walls
-
Internal Wall Type
-
Max Space Available for Radiator (Length, Height)
-
Existing Radiator Size
-
Photo
-
Bathroom
-
Window Sizes
-
Number of Outside Walls
-
Internal Wall Type
-
Max Space Available for Radiator (Length, Height)
-
Existing Radiator Size
-
Photo
-
W/C
-
Window Sizes
-
Number of Outside Walls
-
Internal Wall Type
-
Max Space Available for Radiator (Length, Height)
-
Existing Radiator Size
-
Photo
-
Other Specify
-
What Room
-
Window Sizes
-
Number of Outside Walls
-
Internal Wall Type
-
Max Space Available for Radiator (Length, Height)
-
Existing Radiator Size
-
Photo
-
Job Requirements
Declarations
Customer Informed
-
LCX Not Responsible for Decorating
-
LCX Not responsible for Carpets
-
LCX Not Responsible for Laminate Flooring and Customer must Remove Prior to Works
-
LCX Not Responsible for Loose Ornaments, Mirrors, Pictures etc. Customer must Remove Prior to Works
-
Customer Informed if Shower is NOT Compatible with ASHP
-
LCX Not Responsible for Shower
Customer Declaration
-
DECLARATION: I understand what what is due to be carried out and I agree to the positions of the pipe-work, radiators, cylinder, external unit and room thermostat.
-
I agree to the use of the welfare facilities in my property
-
Customer Signature
Risk Assessment and Sign Off
Access Assessment
-
Does the main power cable to the property need sheathing before scaffold erected?
-
Photographic Evidence
-
Are there any restrictions to the property i.e. Low bridge, neighbours access required?
-
Comments
-
Photographic Evidence
-
Are there any conservatories or out buildings that require a scaffold bridge for this job?
-
Is the property location a main pedestrian route and/or a public walkway?
-
Comments
-
Photographic evidence
-
Is parking available, adequate for the size of vehicle and close to the property?
-
Comments
-
Photographic evidence
-
Do parking restrictions exist i.e. Residents parking?
-
Comments
-
Photographic evidence
-
Will the proposed works affect neighbouring properties?
-
Comments
-
Photographic evidence
-
Has the neighbouring property been notified of the imminent works?
-
Date of notification given
Asbestos Assessment
-
Are we in receipt of or have access to the asbestos survey or register for this property ?
-
Comments
-
Has asbestos been identified ?
-
Comments
-
Photographic evidence
Assessment Sign off
-
Surveyors Signature and Full name