Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • 1 Site Presentation & Welfare<br>1.1 Public/Third party Safety <br>1.2 Signage in work areas suitable and relevant<br>1.3 Site Housekeeping<br>1.4 Washing / Toilet Conditions<br>1.5 Drinking Water Available<br>1.6 First Aid Facilities<br>1.7 Personnel Inducted to H&S arrangements<br>1.8 Are all lone working assessments being carried out and saved in appendix 17? <br>

  • 2 Personal Protective Equipment <br>and Training<br>2.1 Hard Hats<br>2.2 Safety Footwear<br>2.3 Eye Protection<br>2.4 Gloves<br>2.5 Coveralls are flame retardant type<br>2.6 Ear Protection used where required<br>2.7 Face Masks used where required<br>2.8 Are all personnel currently working in the workshop / yard trained in the activity that they are completing? <br>

  • 3 Air & Hydraulic Equipment<br>3.1 Whip checks in place on all external hoses<br>3.2 Power packs in well ventilated areas<br>3.3 PUWER checklists supplied<br>3.4 Proper Access to controls, particularly emergency stops<br>3.5 All hoses and control lines secured and covered to prevent trip hazards<br>3.6 COSHH assessments available for hydraulic fluids<br>

  • 4 Working Areas<br>4.1 Work Area Access & Walkways adequate<br>4.2 Barriers / Warning Signs etc<br>4.3 Openings Securely Guarded (e.g. moon-pools)<br>4.4 Adequate Lighting<br>4.5 Housekeeping / Material Storage<br>4.6 Walkways clear of trip hazards including pipes, hoses, cables Obstruction clearly identified and marked (e.g. hazard chevrons)<br>4.7 Are shelves overloaded? <br>4.8 Have weekly Media inspections been completed on shelving for material condition and signed for?<br>

  • 5 Placement of Equipment & Tools<br>5.1 Equipment adequately stored <br>5.2 Proper Access / Egress to control cabs & containers, particularly emergency exits<br>5.3 Electrical & other services to equipment correctly connected and secured<br>

  • 6 LADDERS<br>6.1 Condition / Length /Angle<br>6.2 Tied / Footed<br>6.3 Have all ladders been inspected as per requirements are adequate records in appendix 15?<br>

  • 7 Plant Maintenance and Plant Hire<br>7.1 Are all plant maintenance records up to date and scanned in?<br>7.2 Have hire plant checklists been completed for all plant that was hired in over the period? <br>7.3 Have all subcontractors/plant operators that have been on site been inducted to the workshop / yard induction? <br><br>

  • 8 Lifting Operations & Appliances<br>8.1 Relevant Certs Submitted<br>8.2 Slings / Shackles – General Condition<br>8.3 S.W.L marked<br>8.4 Banksmen employed<br>8.5 Are all lift plans saved on the system relevant to the period? <br>

  • 9 Power tools / Electricity<br>9.1 Power Tools – General Condition<br>9.2 Power Tools – Guards Adequate<br>9.3 Leads – General Condition<br>9.4 All tools 110v or less <br>9.5 Distribution Boards protected<br>9.6 Are all portable electrical appliances in date and tagged with a unique LDD ID no. and safe working colour? <br>

  • 10 Hazardous Substances<br>10.1 Hazardous Substances Identified<br>10.2 Storage Adequate<br>10.3 Are there any substances that are without a COSHH assessment?<br>10.4 Are all of the COSHH assessments in date? <br>

  • 11 Fire & Emergency Procedures<br>11.1 Flammable material storage<br>11.2 Cylinders upright & secure<br>11.3 Welding Screens / Blankets / Extinguishers<br>11.4 Adequate Fire Extinguishers<br>11.5 Emergency Numbers Posted<br>11.6 Emergency / Evacuation Plans<br>11.7 First Aiders Available<br>11.8 Have emergency drills been conducted as per required schedule? <br>11.9 Have the first aid kit checks been completed and stored within the relevant appendices. <br>

  • 12 Documentation <br>12.1 Safety Policy Displayed<br>12.2 Subcontractor Risk Assessments submitted & followed<br>12.3 Have all incident reports and RISK cards been forwarded to the QHSE department? <br>12.4 Have TBTs been completed for all days when activities have been carried out in the workshop / yard? Have they been saved on the server? <br>12.5 Have all weekly reports been completed for the reference period?<br>12.6 Are all risk assessments up to date within the plan? <br>

  • Other Comments:

  • Add drawing

  • Add media

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.