Title Page
-
Site
-
Conducted on
-
Manager completing risk focus verification
Team members supporting manager
-
Add name of team member
Risk methodology
-
This Risk Focus is for your site to apply and confirm that risk controls are in place for defined hazards for our operations. Work through the checklist and confirm risk controls are in place.
If risk is not applicable to your operations, just select Not Applicable (N/A)
If NOT in place, use the Actions icon to:
Generate an iAuditor action to control the hazard
Close out the action under the Actions tab in iAuditor
Use the Note icon to:
Describe any further relevant details about the hazard
Use the Photos icon to: Capture an relevant photos about the hazard -
For each Hazard the following process has been applied to identify hazard, outline risk value and outline existing controls for verification.
Step 1. Identify Hazard and outline detail.
e.g. Risk of collapse of structure, crushing customer on sales floor.
Step 2. Assign Risk Level based upon Risk Value with controls in place.
Severity – What is the most likely consequence/outcome that would result from the hazard?
Step 3. Outline existing controls in place or already instigated
e.g. Redesign: Structure has been engineering and tested to hold minimum 250kg. -
Risk Matrix
-
Risk Severity descriptors
-
Risk Likelihood descriptors
Risk Controls for Noise (RA08-01)
Risk Controls for Noise
-
Confirm all controls listed are in place. If control not in place, generate "Action" and close out
Step / Topic - Noise Exposure
Hazard (including outcome): Exposure to sound levels above those set out in the National Standard for Occupational Noise resulting in permanent hearing loss: 4x1=4 Low
-
Is there any instances where you have to shout to be heard at arm’s length in the workplace. This indicates that a sound level of approximately 85 dB (A) is present. If Yes.
-
Do team members wear hearing protection within these areas or performing noisy tasks.
-
Team members have been trained to use hearing protection when within these areas or performing tasks that require hearing protection.
Hazard (including outcome): Fatigue and increased error rates due to high background noise levels: 4x1=4 Low
-
Is there any sources of excess background noise (e.g. Locate telephones to minimise potential background noise levels, locate noisy equipment (e.g. printers and photocopiers) away from workstations). If Yes.
-
Has site identified and put in controls to minimise annoyance noise levels.
Additional hazards
-
Is there any other associated hazards not addressed (if applicable)
-
Outline the hazard identified.
-
List controls to address hazard.
-
Does this hazard need to be escalated to the management team.
-
Please escalate to the management team.
Extreme Conditions (RA08-03)
Risk Controls for Extreme Conditions
-
Confirm all controls listed are in place. If control not in place, generate "Action" and close out
Step / Topic - Working in Extreme Hot / Cold Conditions
Hazard (including outcome): Working in hot / cold environment for extended periods of time causing musculoskeletal injury, dehydration, fatigue and/or sunburn: 2x2=4 Low
-
Team members are provided with appropriate PPE, wide brimmed hats and sunscreen SPF 30, reflective vest/jacket etc if needing to work in hot / cold conditions.
-
Team members apply sunscreen if working outside when applicable.
-
Outdoor tasks are rotated to reduce exposure to working outdoors.
-
Team members have access to adequate drinking water for fluid re-hydration.
Additional hazards
-
Is there any other associated hazards not addressed (if applicable)
-
Outline the hazard identified.
-
List controls to address hazard.
-
Does this hazard need to be escalated to the management team.
-
Please escalate to the management team.
Working Alone or in Isolation (RA08-04)
Step / Topic - Working in Isolation
Hazard (including outcome): Severity and likelihood of undesirable outcomes increased because of working alone or in isolation. Extended working hours: 3x2=6 Moderate
-
Rosters and workload are arranged to avoid working in isolation and working alone.
-
Team members are not to access hazardous areas without direct supervision or consistent monitoring. Only managers assigned for these tasks.
-
Team members have regular meal/drink/toilet breaks as per roster.
Step / Topic - Contractor Management
Hazard (including outcome): Additional hazards when managing contractors in remote sites or isolated areas, e.g. roof spaces: 3x2=6 Moderate
-
Site ensures Permit to Work is issued for contractors performing High Risk Work (e.g. Work at Height).
-
Restricted access is maintained for contractors in designated restricted areas.
Additional hazards
-
Is there any other associated hazards not addressed (if applicable)
-
Outline the hazard identified.
-
List controls to address hazard.
-
Does this hazard need to be escalated to the management team.
-
Please escalate to the management team.
Psychosocial hazards (RA08-05)
Step / Topic - Low task control
Hazard (including outcome): Lack of control over and involvement in decisions that could be reasonably expected in a job or role resulting psychological damage: 2x2=6 Moderate
-
Employee Assistance Program is available and promoted to team members.
Step / Topic - Low rewards and recognition
Hazard (including outcome): Lack of acknowledgement provided to workers resulting in poor motivation and rapport: 2x2=4 Low
-
Employees are rewarded and recognised for quality and safe work performed.
-
Team member performance appraisals provide opportunity for performance feedback and recognition.
Step / Topic - High or low job demands
Hazard (including outcome): Various demands placed on employees in their roles exceed capabilities and capacity: 2x2=4 Low
-
Workload is planned and allocated around volume planning to ensure adequate workforce is in place to manage workloads.
-
Tasks are allocated to team members account for their level of training and experience.
-
Suitable levels of supervision in place for team members considering their level of experience and tasks performed.
Additional hazards
-
Is there any other associated hazards not addressed (if applicable)
-
Outline the hazard identified.
-
List controls to address hazard.
-
Does this hazard need to be escalated to the management team.
-
Please escalate to the management team.
Sign off
Sign off
-
Sign off who is completing risk focus verification
-
Team member involved with consultation
Any other team member sign off involved with consultation
-
Team member involved with consultation