Title Page
-
Daily before 0900am each day starting from 04/02/2023
-
Personnel
Daily am Site Check
-
All surfaces should be free of mud, leaves, stones, or other similar materials
-
Entrance signs are free of Graffitti, stickers and other vandalism
-
Drains are clear, no evidence of water pooling
-
There are no sharp edges or projections anywhere on the skating surface
-
All guard rails should be in good condition with no damage and no bars missing
-
Concrete surface is free of splits, chipping and holes
-
Check the bins and water fountain- WATER FOUNTAIN TO BE INSTALLED BY END 1ST QUATER 2023
-
Concrete surface is free of grafitti, stickers and other vandalism
-
All access paths should be in good condition