Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Enter Auditors Name

Observations

  • Main Task

  • Asbestos type

  • Asbestos Material

Site Documentation

  • Is there a copy of the contractors license available?

  • Is there a job specific plan of work / assessment on site?

  • Does the plan of work state the (Start / Finish) dates of the job, And the times the work will be carried out?

  • Does the plan of work detail the condition of the asbestos containing material? If so is it (Poor, Okay, Good)

  • Does the plan of work state who is authorised to make changes to the plan of work or any other documentation?

  • Does the plan of work state which respirators are to be used on the job? If yes please state which ones.

  • Does the plan of work detail the air monitoring arrangements for the duration of the works?

  • Does the plan of work detail the arrangement for smoke testing & witnessing?

  • Does the plan of work detail the construction method for enclosures & airlocks?

  • Does the plan of work detail the asbestos removal technique to be used?

  • Does the plan of work detail the decontamination entrance and exit procedures?

  • Is there a copy of the risk assessments available on site?

  • Is there a copy of the COSHH assessments on site?

  • Is the contractors site diary on site and up to date?

  • Is there a copy the contractors insurance available on site?

Site Operatives & Supervisors Documents

  • Supervisor Name

  • Add media

  • Is there a copy of their medical certificate available on site?

  • Is there a copy of their training available on site?

  • Is there a copy of their face fit certificate available on site?

  • Examination record for RPE in use?

  • Emergency procedure awareness?

  • Clean shaven?

  • Staff Name

  • Add media

  • Is there a copy of their medical certificate available on site?

  • Is there a copy of their training available on site?

  • Is there a copy of their face fit certificate available on site?

  • Examination record for RPE in use?

  • Emergency procedure awareness?

  • Clean shaven?

  • Are the certificates verified by head office?

  • Staff name

  • Add media

  • Is there a copy of their medical certificate available on site?

  • Is there a copy of their training certificate on site?

  • Examination records for RPE in use?

  • Emergency procedure awareness?

  • Clean shaven

  • Are certificates verified by head office?

Site Organisation

  • Does the site drawing match the actual site setup?

  • Are there CCTV or viewing panels available to see most of the area?

  • Is each viewing panel (at least 600 x 300mm)

  • Are there adequate warning signs which comply with the Safety Signs & Symbols Regulations? ( including black prohibition symbol )

  • Is there a First Aid Kit available on site?

  • Have all appliances been PAT tested

Plant on site / Certification

  • Are there at least 2 H type vacuums on site?

  • Are current DOP test certificates ( or copies ) available for each vacuum on site?

  • Does the number and capacity of the NPU's in use correspond with that stated in the plan of work?

  • Are current DOP test certificates available on site within the NPU

  • Is there a current DOP test certificate ( or copy) available on site for the NPU within the dirty end of the DCU?

Enclosure / Airlocks

  • Is the enclosure in sound condition and constructed so as to prevent the spread of asbestos? (i.e 1000 gauge polythene)

  • Are the enclosure inspection and smoke test records available for inspection and smoke test records available for inspection?

  • Is the airlock free from visible asbestos debris?

  • Is a bucket and sponge or similar available for decontamination of respirator?

  • Are the airlock openings either oval or rectangular in shape?

  • Do the flaps cover the airlock openings adequately?

  • Are all of the airlock flaps weighted?

  • Is each stage of the airlock at least 1m x 1m x 2m (height)?

  • Does the inner stage of the airlock have a viewing panel at least 600 x 300mm?

Air Extraction Equipment

  • Is the extract sited in relation to ideal air managment?

  • Is the extract capable of giving a minimum of 8 air changes per hour?

  • Is the extract vented to outside atmosphere where practical?

Observed Work Practices

  • Is the pre-filter the only part of the NPU exposed to the working area? (i.e NPU sheeted out if inside enclosure)

  • RPE and filter used as stated in plan of work? (i.e suitable)

  • RPE identifiable as a complete kit? ( i.e mask, blower, and battery all uniquely identified as one kit )

  • Are colours of coveralls as stated in plan of works or standard procedures?

  • Are all items of necessary PPE being properly worn? (e.g overall hood over headstraps, overalls not tucked into boots etc. )

  • Does the dust suppression method being used match that stated in the plan of work?

  • Is the dust suppression method suitable for the type of work or material? (if needle injection machine being used, please state manufacturer )

  • Does the asbestos removal technique being used match that state in the plan of work?

  • Has the waste been appropriately bagged? ( e.g immediately and single bagged if in enclosure)

Hygiene Facility

  • is the unit positioned in relation to the work area as stated in the plan of work?

  • If the unit is not directly connected to the enclosure, would have been reasonably practicable to do so?

  • is the transit route as short as possible and away from occupied areas?

  • Is the unit functional / in working order? ( water, ventilation, heating, lighting, water filter, drains, etc. )

  • Are the internal doors and external door to the dirty end all fully self closing?

  • Is there an adequate number of shower heads for operatives? ( i.e at least one for every 4 operatives )

  • Is there a nailbrush provided in the shower area?

  • Is the unit in good condition and clean so far as is reasonably practicable?

  • Is there a clearance test certificate, from the previous job for the dirty end and the shower compartment of the hygiene unit?

  • Are the clean end and dirty end doors marked ( including prohibited entry and mandatory PPE signage, where required ) ?

  • Are towels provided?

Waste

  • Are the waste disposal arrangements as described in the plan of work?

  • Are the baglock and waste transit routes free from residual or split waste?

  • Has a separate baglock been provided?

  • Is each stage of the baglock at least 1m x 1m x 2m (height)?

  • Does the inner stage of the baglock have a viewing panel at least 600 x 300mm?

Miscellaneous

  • Are disposable working coveralls and transit coveralls 'category 3, type 5/6'?

  • Are contractor's vans tidy and with no risk of spread of asbestos fibres?

Scaffolding

  • Has the asbestos removal contractor any scaffolding on site?

  • Was a sub-contractor used to erect the scaffolding?

  • Does the scaffold form part of the enclosure or was it liable to disturb asbestos when erected?

Further comments / Observations

  • undefined

Signatures

  • Reviewers Signature:

  • Supervisor's Signature:

  • Time of Departure?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.