Information
-
Certificate No.
-
Select the date and time of the inspection
-
Address
-
Asbestos Assessor
- Terry O'Keeffe - AA18010016 - Expiry Date: 30/01/2023
- Aaron O'Keeffe - AA20040016 - Expiry Date: 09/04/2025
- Archie Britz - IP404 BOHS Qualification
-
Asbestos Removal Supervisor
-
Description and location of the product that has been removed
-
PCBU
-
Who was the licensed Asbestos Removal Company?
- A&J Demolition Ltd
- ACMR
- AMR Team Ltd
- AR Plus
- Arrowsmith Builders Ltd
- Asbestos Contracting Ltd
- Asbestos Eliminators Ltd
- Bay Rebuild
- Central Demolition
- Cooper Young Construction
- Demoworx
- GGL Site development Earthmoving
- Gypsy Hill Holdings Ltd
- H&L Asbestos Contractors Ltd
- Lakes District Health Board
- Morecroft Contractors Ltd
- Morgan Project Services
- NZRS
- Owner
- Penny Homes
- Property Services Unlimited
- Rotovegas Roofing
- Suretrade Building Services
- Suretrade Coastal
- Vision Complete Earthworks
-
Was there an Asbestos Survey supplied to Asbestos Consultants NZ?
-
Did the PCBU provide a survey to the removal contractor?
-
Was the ARCP Viewed?
-
Was the Worksafe Notification Viewed?
-
Was the Supervisor onsite during the clearance inspection?
-
Has the Asbestos Removal Supervisor advised the job is ready for the clearance inspection?
-
Are the personnel removing the asbestos appropriately trained and certified?
-
Was a decontamination area set up and satisfactory?
-
Was there adequate signage and exclusion zones set up?
-
Does the contractor hold a current Asbestos Removal Licence for the Asbestos being removed?
-
Weather type?
- Sunny
- Raining
- Windy
- Cloudy
-
What direction is the wind traveling?
Inspection
-
Was the product being removed correct as per the ARCP and worksafe notification?
-
Has all asbestos the waste removed from site?
-
Is all residual remnants of any asbestos product clear from the excavation/work area?
-
Was the vacuum used?
-
Was the Vacuum used the same as the vacuum in the ARCP and within a current certification?
-
What type of PPE was used?
- Half Face Mask
- Full Face Mask
- Coveralls
- Gloves
-
Was Air Monitoring required during this removal process?
-
Did the air monitoring return an AFR level of less than 0.01 fibres/ml.
-
Were swab tests required as part of the clearance?
-
Did the surface swab tests return negative readings for asbestos?
-
Was soil sampling required as part of this clearance?
-
What type of Soil testing was conducted?
- P.A Soil (Presence/Absence)
- Semi-Quant - Asbestos percentage per quantity of soil
-
Did the soil testing return negative readings for asbestos?
-
Did the soil testing return negative readings for asbestos?
-
Any notes?
Inspection sign off
-
An inspection has been undertaken by the undersigned of Asbestos Consultants NZ has found that there is no visible asbestos residue remaining as a result of the asbestos removal work in the area where the asbestos removal work was performed or in the area immediately surrounding the area where the asbestos removal work was performed.
Therefore as far as can be determined, this removal area does not pose a risk to health and safety from exposure to asbestos. -
Inspection outcome
-
Assessor Signature
Photographs
-
Photographs once the removal process is complete.