Information
-
Audit Title
-
Name of Allocated User
-
User Employee No.
-
Inspector
-
Inspector Employee No.
-
Conducted on
Shackles
-
Shackles Inspection
Shackle
-
Batch Trace
-
Type
-
Working Load Limit (t)
-
Nominal Size (mm)
-
Is the shackle passed inspection
-
Test Certificate No. & Comments eg. split pin, grade M shackle
Visual Inspection
-
Shackle Body & Pin:
• Check for any illegible shackle markings
• Check if the body and the pin are of different material type or grade
• Inspect the threads of the pin and the body for any distortion
• Check the body and the pin for undue wear
• Inspect the body and the pin for any cracks, gouges or corrosion -
Have all shackles been visually checked?
-
Notes / Comments
Chain Sling
-
Chain Sling Inspection
-
Sling Manufacturer
-
Manufactured / In Service
-
Compliance Tag:
Tag attached and following detail legible
• Manufacturer
• Serial No
• Compliance to AS3775
• Sling Type (No of Legs & Working Load Limit) -
Working Load Limit (t)
-
Length (m)
-
Serial No
-
Plant No / Test Cert. No
Visual Inspection
-
Master Link, Chain Links, Hooks, Hammerlocks, Shorteners:
• Check for signs of overloading, eg distortion of hooks
• Examine entire surface of each link for any twisting, stretching or cracks
• Measure any worn components to determine amount of wear
remove sling from service If and when thickness
of any worn section has been reduced by 10% (in any plane)
• Check operation of safety catches and hook latches
• Evaluate the load bearing points on the end fittings for any sign of wear
• Check load pin(s) for excessive play within the body halves of the connecting links &
• Check for impaired rotation of the body halves of the connecting links around the pin -
Check Points inspected & Sling is FIT FOR USE?
-
Discard sling if any of the check points are sighted, or any other dangerous condition is confirmed. Please comment on general condition of sling.
Round Sling
-
Round Sling
Sling
-
Tag attached?
-
Manufacturer
-
Date of Manufacture
-
Length (m)
-
Serial No
-
Working Load Limit (t)
-
Inspection passed?
-
Certificate No & Comments
Visual Inspection
-
End Fittings & Couplings:
• Examine for significant wear or corrosion -
Have all slings been visually checked?
-
Notes / Comments
-
Cover & Protective Coating:
• Examine for burn damage eg fused or glazed fibres
• Check for damage to the cover such that any part of the core can be seen
• Examine also for chemical damage eg any weakening or softness of an area, or flaking of fibres -
Stitching:
• Check for damage of any kind
Steel Wire Rope Sling
-
Steel Wire Rope Sling
-
Sling Manufacturer
-
Manufactured / In Service
-
Working Load Limit (t)
-
Length (m)
-
Wire Rope Diameter (mm)
-
Serial No
-
Plant No / Test Cert no
Visual Inspection
-
Wire Strands:
• Check for any damage of the outer wires and (as much is practicable) the inner wires
• Examine for consolidation of the core and rope strands
• Check for wire breaks over lengths of 6 & 30 x rope dia. -
Load Bearing Points:
• Note whether sling has been:
Subjected to heavy impact load or severely overloaded -
End Fittings & Attachments:
• Examine for deterioration due to abrasive wear, any wire breaks or corrosion.
• Note any other damage -
All check points inspected and sling is FIT FOR USE?
-
Notes / Comments
-
No of Wire Breaks sighted over the lengths of 6 x rope dia.
-
No of Wire Breaks sighted over the lengths of 30 x rope dia.
Level of Deterioration
-
Due to Outer wires - abrasion
-
Due to Inner wires - wear
-
Due to Corrosion
-
Due to Kinking Inc. flattening of eyes<br>
Other lifting device
-
Other Lifting Device
Device
-
Item eg. eyebolts, hooks, pallet bins
-
Manufacturer
-
Date of Manufacture
-
Working Load Limit (t)
-
Nominal Size (mm)
-
Length (m)
-
Grade (Quality)
-
Serial No / Batch No
-
Plant No
Visual Inspection
-
General Item Check Points:
• Markings are all clearly legible
• Threads are functional, and in good condition
• Distortion or undue wear is not visible
• Corrosion, cracks and gouges are not evident -
Check points inspected & item is FIT FOR USE?
-
Notes / Comments
Completion
-
This is the end of the inspection. The result will be saved in "Audits" section, you can preview, edit and send via email.