Questions
-
Check for linen in the sluice or bathroom
-
Is there a designated area for the storage of clean linen which is separate to used linen?
-
Check walls, windows, ceilings, fans, light fittings are free from dust/debris/insects etc.
-
Is the environment visibly clean?
-
Check for flaking paint, damaged walls/ ceilings/window frames & surfaces. Check for evidence of action taken to repair.
-
Is the environment free from any visible damage?
-
Check the edges and corners are clean and free of dust and grit.
-
Is the floor visibly clean?
-
Check for rips and tears.
-
Is the flooring in a good state of repair?
-
Visual check.
-
Is all linen stored off the floor?
-
Check linen area store for inappropriate equipment.
-
Is the area/room used to store clean linen free from inappropriate items?
-
Visual check.
-
Is used linen stored off the floor?
-
Observe practice or ask a member of staff to describe procedure, also check for the availability of red bags.
-
Are water-soluble bags used for soiled and/or infected linen?
-
Check linen bags/containers can be secured.
-
Are used linen/bags/containers less than 75% full?
-
Ask staff attending to the laundry.
-
Are reusable linen bags laundered after use?
-
Check cleanliness.
-
Are rigid linen containers/trolleys visibly clean?
-
Observe practice or ask a member of staff to describe the procedure.
-
Do staff wear disposable gloves and aprons when handling soiled linen?
-
Check condition of linen items.
-
Is the linen in use in good condition, free from frays, tears etc.?
-
Observe practice or ask a member of staff to describe procedure?
-
Is all soiled linen initially laundered on a pre-wash (sluice) machine cycle?
-
Check for pipe.
-
Is the tumble dryer vented to the outside?
-
Is the vent area clean?
-
Are the daily/weekly checks carried out on the tumble drier – fluff removed, pipe wiped and end checked for blockages or build up?
-
Is the washing machine & tumble dryer on a pre-planned maintenance programme?
-
Is the washing machine & tumble dryer on a pre-planned maintenance programme?
Sign off
-
Signature of auditor