Location
-
Client
-
Site
-
Conducted on
-
Inspection No.
-
Prepared by
-
Location
Main Checklist
-
Name of Approved Installer
-
Weather at the time of Inspection
Ambient Temperature (Celsius)
-
Liquid Manufacturer
-
Is the specification available on site?
-
Materials Stored Correctly
-
Batch Number
Substrate
-
Substrate Type
- Ply Decking
- Concrete Slab
- Single-Ply Overlay
- Felt Overlay
- Asphalt
- Screed
- Other
-
Condition of Substrate
Vapour Check
-
Currently Visible
-
Type of VCL
-
Condition of VCL
-
VCL Installed Correctly
Insulation
-
Visibility
-
Type of Insulation
- PIR
- Rockwool
- XPS
- Other
-
Condition of Insulation
-
Installed as per Manufacturers Specification & Design
Carrier Membrane
-
Installed as per Manufacturers Specification
Liquid Membrane
-
Primer
-
When was the area primed. (Primer only lasts 7-10 days)
-
Basecoat with Matting
-
Depth Test Carried out?
-
Top Coat
-
Depth Test Carried Out?
-
Installed as per Manufacturers Specification
Protection and Walkways
-
Type of Protection Layer
-
Condition of Protection Layer
-
Installed as Per Manufacturers Specification & Design
Timber to Upstands
-
Type of Detail Fixed at 500mm Centre's
- Acceptable
- Acceptable With Actions
- Unacceptable
- Not Visible
- N/A
-
Hardedge Installed
-
Tyvek Tape Installed
Mansafe and Guardrails
-
Mansafe / Guardrails Fully Installed & Complete With Protection Below Feet
-
Mansafe / Guardrails Signed Off & Certs Obtained
Ancillaries
-
Type of Ancillary
-
Condition of Items
-
Items Installed Correctly as per Manufacturers Specification
Rainwater Goods
-
Type of rainwater Goods
- Outlet Downpipe
- Outlet Chute
- Down Pipes
- Gutter
- Hopper
-
Rainwater Goods Installed as per Manufacturers Specification
-
Condition of Rainwater Goods
-
Leaf Guards & Inspection Chambers
Sign Off
-
Photo of Area
-
Manufacturers Inspection
-
Electronic Integrity Test
-
Area Ready for Handover
-
Name and Signature of Person Carrying Out The Inspection