Information

  • Document No.

  • Photos of tower

  • Contractor

  • Site number

  • Site number photo

  • Conducted on

  • Aaron Steeneck

  • Location Address
  • Add media

  • Project Number

Project and Site Details

  • Site name

  • Property Owner

  • Number of personnel on site:

  • Crew Foreman/Leader

  • Scope of Work

  • Are there any subcontractors on site?

  • Subcontractor Name

  • Number of Personnel on Site
  • Project Manager

  • Will elevated work occur on this project site?

  • Monopole

  • Self-Supporting Tower

  • Guyed Tower

  • Water Tank

  • Rooftop

  • Crane Supported Work Platform

  • Man Basket

  • Aerial Lift of Scissor Lift

  • Bucket/Boom truck

  • Other

  • Describe:

  • Insert photo of structure where elevated work is occurring or will occur.

Jobsite Documentation

  • Is a Daily Safe Plan of Action or a Job Hazard Analysis completed and on site? <br>

  • Rate the quality and completeness of the SPA, with a 0 being poor quality and 10 being high quality.

  • Is a Safety Binder on site with all required documentation?

  • Are originals or copies of the Competent Climber certifications of all personnel who will work at elevation available on site?

  • Is there a completed Emergency Action Plan for the site?

  • Is there a Competent Persons list on site?

  • Are there at least 2 persons on site currently certified in First Aid/CPR?

  • Is a first aid kit on site?

  • Are overhead utilities and other electrical hazards addressed in the SPA/JHA?

  • Are overhead or underground utilities present?

  • Are MSDS's available on site for all chemicals, compounds, and hazardous substances?

  • Overall compliance with field site documentation requirements:

  • Describe deficiencies:

  • Deficiency
  • Deficiency

  • Add media

  • Document remedial actions taken:

Jobsite Contitions

  • Is the worksite clean of trash and debris?

  • Are materials stored properly and orderly?

  • Are measures taken to prevent access to the site by unauthorized personnel?

  • Are work areas barricaded or fenced?

  • Is there signage posted at the entrance to the site establishing PPE and access instructions for visitors?

  • Is drinking water available?

  • Are chemical, flammable and combustilble liquids stored properly? (No plastic storage cans)

  • Is there adequate number of fire extinguishers available, fully charged and with current inspection?

  • Proper sized water wagon on site?

  • Are weather (heat, cold, precipitation, lightening, ice/snow) addressed and documented on the SPA?

  • Overall compliance with jobsite conditions management

  • Describe Deficiencies:

  • Deficiency
  • Deficiency:

  • Insert Photo of Deficiency, if applicable.

  • Describe remedial actions taken:

PPE

  • Are employees wearing hard hats 100% of the time?

  • Document remedial actions taken:

  • Hard hat(s) less than 5 years old, show no signs of cracks, or holes?

  • Are employees weating ANSI Z87 safety glasses 100% of the time?

  • Document remedial actions taken:

  • Are employees wearing appropriate gloves for the tasks performed 100% of the time?

  • Document remedial actions taken:

  • Are employees wearing hi-viz clothing while heavy equipment is being used?

  • Document remedial actions taken:

  • Are employees wearing appropriate hard-toe footwear?

  • Document remedial actions taken:

  • Are employees dressed in appropriate work clothing?

  • Document remedial actions taken:

  • Is hearing protection needed for potential noise exposures over 85dB?

  • Are ear plugs or ear muffs available for employees on site?

  • Are employees with exposures to noise over 85dB wearing appropriate hearing protection?

  • Document remedial actions:

  • Other PPE in use on this site:

  • Other PPE needed on this site:

  • Overall compliance with PPE requirements:

Fall Protection

  • Do employees who are exposed to falls have proper training?

  • Document remedial actions taken:

  • If fall protection equipment being inspected daily and documented on the Elevated Work Permit?

  • Document remedial actions taken:

  • Are all inspection tags on fall protection equipment present and legible?

  • Document remedial actions taken:

  • Are all carabiners used a minimum of 25kn (5620lbs)?

  • Are all carabiners self closing and self locking?

  • Are inspection tags on climbing harness legible?

  • Are climbing harness in working order and do not exceed 5years of use?

  • If the work performed requires fall protection, is it being used 100% of the time?

  • Persons in violation of 100% fall protection shall be removed from site. Further disciplinary procedures may apply.

  • Document remedial actions taken.

  • Is work being performed on a rooftop or other elevated flat surface?

  • Are the following conditions met?

  • Overall compliance with Fall Protection requirements:

  • See specific remedial actions above and recommendations in Section 15.

RF

  • Have RF hazards been considered and the safe plan documented on the Safe Plan of Acton?

  • Is there a procedure in place to reduce RF exposure, if applicable?

  • Does client of site owner require specific RF protection plans?

  • Are our operations on site in compliance with client and owner requirements?

  • Document remedial actions:

Hoists

  • Is hoist operator qualified (Certified through training or Qualified through experience)?

  • Document remedial actions taken:

  • Are daily inspections being completed with documentation on site?

  • Is there an operators manual for the unit(s) on site?

  • Are the load charts readily available for hoist operators?

  • Are all hoists secured and properly anchored for the load intended?

  • Is the end connection properly secured?

  • Are hoist controls clearly identified?

  • Are hoist controls easily accessbile to the operator?

  • Are all exposed parts properly guarded?

  • Is the hour meter operational and functioning properly?

  • Detail Hoist Unit Condition and Hours

  • Hoist
  • Hoist Unit

  • Condition:

  • Hours:

  • Overall compliance with hoist safety requirements:

  • Comments or remedial actions required:

Cranes

  • Is there crane work associated with this project?

  • Document remedial actions taken:

  • Overall compliance with crane requirements?

  • Have crane picks been planned and the plans documented?

  • Has the crane subcontractor submitted proof of annual inspection of the crane?

  • Has the crane subcontractor submitted evidence of the crane operator's NCCCO certification?

  • Does the crane signal person have current certification?

Elevated Work Platforms & Aerial Devices

  • Are Elevated Work Platforms or other Aerial Work Devices being used or to be used on this site?

  • Is the crane approved for lifting personnel?

  • Does the personnel platform have an identification plate with weight of the platform, maximum intended load and personnel capacity?

  • Was the Crane Suspended Work Platform planning checklist completed and made available on site?

  • Has a pre-lift meeting been held, documented and made available on site?

  • Was a trial lift completed and documented?

  • Does the daily Safe Plan of Action adequately address the type of elevated work platform and hazards associated with the device?

  • Were additional checklists or planning documents used to plan this work?

  • Are all personnel performing elevated work using 100% fall protection?

  • Are the equipment operators Qualified to operate the device?

  • Overall compliance with elevated work platform and aerial device requirements:

  • Describe remedial actions taken:

Rigging and Blocks

  • Will there be rigging of equipment, materials or tools to be hoisted on this site?

  • Are proper rigging practices being utilized?

  • Are Riggers properly Qualified for the rigging work performed?

  • Qualification is based upon:

  • Is rigging equipment in good condition?

  • Is rigging equipment being inspected daily and the inspection documented on the daily Safe Plan of Action or Elevated Work Permit?

  • Has the equipment been thoroughly inspected on a quarterly basis and the inspection documented?

  • Are ropes in good condition?

  • Are tag lines in good condition?

  • Overall compliance with rigging and blocking requirements:

  • Describe remedial actions taken:

Gin Poles

  • Are gin poles in use or to be used on this site?

  • Has the gin pole been inspected prior to use, and is the inspection available on site?

  • Does the sheave in the rooster head match the wire rope?

  • Has the daily safe plan of action addressed the use and hazards associated with gin poles?

  • Have other checklists been used to plan the work?

  • Is gin pole being used in accordance with all requirements in Construction and Demolition of Telecommunications Towers?

  • Document remedial actions taken:

  • Is the gin pole rigging in good condition?

  • Does the gin pole have an identification tag?

  • Does the gin pole have a rated hoisting capacity?

  • Are all intended loads less than 85% of the capacity of the gin pole?

  • Document remedial actions taken:

Ladders

  • Are all ladders on site rated at lease A1?

  • Are all ladders on site in good condition?

  • Has a daily pre-work inspection been completed of all ladders in use, and is the inspection noted in the daily Safe Plan of Action or available on site?

  • Are A-frame ladders set up correctly with legs fully opened and locked in place?

  • Are extension ladders set up at the proper slope of 4:1?

  • Do extension ladders extend at least 36" above the landing level?

  • Are ladders only set up on stable and level ground?

  • Overall compliance with Ladder safety requirements:

  • Deficiencies Noted:

  • Deficiency
  • Describe deficiency:

  • Insert photo of non-compliant item

  • Describe remedial actions taken:

Electrical

  • Are extension cord sets appropriate gauge for load?

  • Are construction rated GFCIs used on all circuits greater than or equal to 120-volt, 15-20 amperes which are not connected to a building system?

  • Is all cord set insulation in good condition? No nicks or cuts or frays?

  • Do all cord sets have molded male and female end plugs with no gaps?

  • Are all cover plates in place on outlets?

  • Is any work occurring on live circuits greater than 50 volts AC or 100 volts DC?

  • What type of work is occurring?

  • Has an Arc Flash Hazard Analysis been conducted on the potential exposures and/or have the specific hazards been identified and a control plan put in place?

  • Are work areas clearly marked and barricaded from unauthorized entry?

  • Are all hand tools voltage-rated insulated tools?

  • Overall Compliance with electrical safety requirements:

  • Deficiencies Noted:

  • Deficency
  • Describe deficiency

  • Insert photo of deficiency, if applicable.

  • Document remedial actions taken:

Excavations

  • Does the scope of work on site include excavation?

  • Is the operator Qualified to operate excavation equipment?

  • Are designated safe walk paths or No Pedestrian zones established?

  • Are back-up alarms functioning on all mobile equipment?

  • Has the Pre-Excavation checklist been completed and made available on site?

  • Are overhead and underground utilities identified and clearly marked?

  • Is there potential that personnel may enter the excavation while it is open?

  • How deep will the excavation be at its deepest point?

  • Is a safe means of ingress and egress provided at least every 25-feet?

  • Will the excavation exceed 5-feet deep at any point?

  • Indicate means to prevent trench collapse:

  • Describe other means of preventing trench collapse:

  • Overall compliance with trenching and excavation requirements:

  • Deficiencies Noted:

  • Deficiency
  • Describe Deficiency:

  • Insert photo of deficiency, if applicable.

Conclusions

  • Amount of time spent on site during visit:

  • Were all deficiencies corrected immediately?

  • Describe deficiencies yet to be corrected and time frame for abatement:

  • Deficiency
  • Deficiency yet to be corrected:

  • Time frame for abatement:

  • Is there a need to follow up with written documentation?

  • Describe documentation needed, responsible person and time frame expected for completion.

  • Documentation Needed
  • Documentation:

  • Person Responsible:

  • Date for required completion:

  • Overall Impression of visit:

  • Comments:

  • Report Reviewed With:

  • Signature of Person Completing Audit:

  • Signature of Site Foreman

  • Signature of crew member

  • Signature of crew member

  • Signature of crew member

  • Signature of crew member

  • Additional photos

  • Additional comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.