Location

  • Conducted on

  • Prepared by

  • Location

Main checklist

  • Client Name and Site

  • Time and Date of Inspection

  • Area Being Inspected

  • Names Of persons Present:

Liquid Membrane

  • Is decking visible

  • Condition of decking

  • Bonding Layer

  • Vapour Layer

  • Insulation layer

  • Preparation membrane layer

  • polimar EC layer

  • Reinforcement Layer

  • Waterproofing top layer

  • All reinforcement correctly installed

Metal Profiles and Details

  • Type of detail

  • Condition of Installed metals

  • Metals installed correctly

  • Name and Signature of person carrying out the inspection

  • Is the area being handed over

  • Name of area

  • Photo of area

  • Signature of client

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.