Location
-
Conducted on
-
Prepared by
-
Location
Main checklist
-
Client Name and Site
-
Time and Date of Inspection
-
Area Being Inspected
-
Names Of persons Present:
- Rich Taylor
- Ashley Parrott
- Rob Lewis
- Chris Otley
- James Day
- Craig Smith
- Paul Scammell
- Jason Blake
- AAron Otley
- Melvyn Day
- Harley Raby
- Asa Alvis
- Ben Stephens
- Ben Pike
- Ben Jones
- Jack Fry
- George Williams
- Rob Burgoyne
- Jon Burgoyne
- Robin Hambly
- Gary Reader
- Lee Millar
Hot Melt
-
Condition of decking
-
Peel Test carried out (stop Point)
-
Primer
-
Hotmelt
-
Depth Test Carried out
-
Protection Layer
Protection And Walkways
-
Type of protection layer
-
Condition of Protection layer
-
Has it been Correctly installed
Mansafe and Guardrails
-
Mansafe / guardrails fully installed and complete
-
Mansafe / guardrails signed off and certs obtained
Ancillaries
-
Type of Ancillary
-
Condition of Items
-
Items Installed Correctly
Rainwater Goods
-
Type of rainwater Goods
- Outlet downpipe
- Outlet Chute
- Down pipes
- Gutter
- Hopper
-
Rainwater goods installed correctly
-
Condition of Rainwater Goods
-
Name and Signature of person carrying out the inspection
-
Is the area being handed over
-
Name of area
-
Photo of area
-
Signature of client