Location

  • Conducted on

  • Prepared by

  • Location

Main checklist

  • Client Name and Site

  • Time and Date of Inspection

  • Area Being Inspected

  • Names Of persons Present:

Decking

  • Is decking Visible

  • Decking Type

  • Condition Of decking

  • Decking installed correctly

Vapour Check

  • Is it currently visible

  • Type of VCL

  • Condition of VCL

  • VCL installed Correctly

Insulation

  • is it currently visible

  • Type of Insulation

  • Condition of Insulation

  • Has it been Installed Correctly

Membrane

  • Is Membrane visible

  • Condition of Membrane

  • Has it been correctly installed

Protection And Walkways

  • Type of protection layer

  • Condition of Protection layer

  • Has it been Correctly installed

Metal Profiles and Details

  • Type of detail

  • Condition of Installed metals

  • Metals installed correctly

Mansafe and Guardrails

  • Mansafe / guardrails fully installed and complete

  • Mansafe / guardrails signed off and certs obtained

Ancillaries

  • Type of Ancillary

  • Condition of Items

  • Items Installed Correctly

Rainwater Goods

  • Type of rainwater Goods

  • Rainwater goods installed correctly

  • Condition of Rainwater Goods

  • Name and Signature of person carrying out the inspection

  • Is the area being handed over

  • Name of area

  • Photo of area

  • Signature of client

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.