Location
-
Conducted on
-
Prepared by
-
Location
Main checklist
-
Client Name and Site
-
Time and Date of Inspection
-
Area Being Inspected
-
Names Of persons Present:
- Rich Taylor
- Ashley Parrott
- Rob Lewis
- Chris Otley
- James Day
- Craig Smith
- Paul Scammell
- Jason Blake
- AAron Otley
- Melvyn Day
- Harley Raby
- Asa Alvis
- Ben Stephens
- Ben Pike
- Ben Jones
- Jack Fry
- George Williams
- Rob Burgoyne
- Jon Burgoyne
- Robin Hambly
- Gary Reader
- Lee Millar
- Ben Daly
- Terry Purnell
- Other
Liquid Membrane
-
Is decking visible
-
Condition of decking
-
Bonding Layer
-
Vapour Layer
-
Insulation layer
-
Preparation membrane layer
-
polimar EC layer
-
Reinforcement Layer
-
Waterproofing top layer
-
All reinforcement correctly installed
Metal Profiles and Details
-
Type of detail
- Upstands
- Parapets
- Skirting
- Curbs / roof lights
- Drip Edges
- Sumps / gutters
- other
-
Condition of Installed metals
-
Metals installed correctly
-
Name and Signature of person carrying out the inspection
-
Is the area being handed over
-
Name of area
-
Photo of area
-
Signature of client
House Keeping
-
What Area/Areas have been cleared of waste and materials?
-
All materials have been put back in the correct storage areas?
-
All COSHH has been put back in the correct storage areas?
-
All waste has been disposed of in the correct skips
-
All corridors, doorways and communal areas are free from obstruction?
-
All loose and lightweight materials have been tied off and secured on roofs and outdoor areas?
-
Name of person carrying out the checks?
-
Signature