Title Page

  • Unit Number

  • Prepared by

  • Conducted on

  • Supervisor

  • Items on this QA report which are not completed within 7 Days from the Date of this report will be assigned to another trade for rectification and the trade originally responsible will be back charged accordingly.

  • Reinspection Date

General

  • Have defects from Frame QA inspection been rectified & completed

  • IS FRAME APPROVED

  • Is site clean have materials & offcuts been stacked at cage or skip

  • Electrical power pit installed

  • Gas service line installled

  • Water connected and UNDER PRESSURE

  • Plumbing Rough In complete

  • Electrical rough in completed

  • Ducted Vac/alarm/intercom rough in completed

  • Heating/cooling rough in completed

  • Manhole trimmed out in correct location

  • Noggins installed for wall mounted TVs

  • Wall Batts installed correctly

  • Ceiling Batts strung and installed in tight areas

  • House is clean and swept out ready for plaster

  • Correct stair void protection & ladder installed & being maintained

  • Comments

  • Photos

Brickwork

  • Bedjoints nominal thickness 10mm Deviation in bedjoints +/-3mm

  • Perpend nominal thickness 10mm Perpend thickness minimum 5mm Deviation in perpend thickness +/-8mm

  • Brick sills have the correct & consistent angle of fall

  • Weep holes at 1200mm maximum centres

  • Weepholes located min 1 course above rebate

  • Brick repairs complete at waste pipes

  • Brickwork overhang @ rebate - max 15mm

  • Control Joints continuous/located correctly as per plans

  • Comments

  • Photos

Entry

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Study

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Guest Bedroom

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Guest Ensuite

  • Door studs straightened Walls straightened

  • Villaboard margin around window 6mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • Spa/bath installed correctly

  • Shower base installed ( if applicable)

  • Plumbing Wastes & Water Points in correct locations as per plans

  • Noggins installed for towel rails & toilet paper holder

  • Shower Niche correct size & location

  • Comments

  • Photos

Guest WIR

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Bedroom 1

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Bedroom 1 Ensuite

  • Door studs straightened Walls straightened

  • Villaboard margin around window 6mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • Plumbing Wastes & Water Points in correct locations as per plans

  • Shower base installed ( if applicable)

  • Spa / Bath installed correctly

  • Noggins installed for towel rails & toilet paper holder

  • Shower Niche correct size & location

  • Comments

  • Photos

Bedroom 1 WIR

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Bedroom 2

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Bedroom 2 Ensuite

  • Door studs straightened Walls straightened

  • Villaboard margin around window 6mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • Plumbing Wastes & Water Points in correct locations as per plans

  • Spa/bath installed correctly

  • Shower base installed ( if applicable)

  • Noggins installed for towel rails & toilet paper holder

  • Shower Niche correct size & location

  • Comments

  • Photos

Bedroom 2 WIR

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Bedroom 3

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Bedroom 3 Ensuite

  • Door studs straightened Walls straightened

  • Villaboard margin around window 6mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • Plumbing Wastes & Water Points in correct locations as per plans

  • Spa/bath installed correctly

  • Shower base installed ( if applicable)

  • Noggins installed for towel rails & toilet paper holder

  • Shower Niche correct size & location

  • Comments

  • Photos

Bedroom 3 WIR

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Bedroom 4

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Bedroom 4 Ensuite

  • Door studs straightened Walls straightened

  • Villaboard margin around window 6mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • Plumbing Wastes & Water Points in correct locations as per plans

  • Spa/bath installed correctly

  • Shower base installed ( if applicable)

  • Noggins installed for towel rails & toilet paper holder

  • Shower Niche correct size & location

  • Comments

  • Photos

Bedroom 4 WIR

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Bedroom 5

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Bedroom 5 Ensuite

  • Door studs straightened Walls straightened

  • Villaboard margin around window 6mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • Plumbing Wastes & Water Points in correct locations as per plans

  • Spa/bath installed correctly

  • Shower base installed ( if applicable)

  • Noggins installed for towel rails & toilet paper holder

  • Shower Niche correct size & location

  • Comments

  • Photos

Bedroom 5 WIR

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Powder Room

  • Door studs straightened Walls straightened

  • Villaboard margin around window 6mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • Plumbing Wastes & Water Points in correct locations as per plans

  • Noggins installed for towel rails & toilet paper holder

  • Comments

  • Photos

Living Area

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Dining Area

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Family Area

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Theatre

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Kitchen

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • Plumbing Wastes & Water Points in correct locations as per plans

  • Gas point in correct location

  • Comments

  • Photos

WIR Pantry

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • Comments

  • Photos

Butlers Pantry

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • Plumbing Wastes & Water Points in correct locations as per plans

  • Gas point in correct location

  • Comments

  • Photos

Laundry

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • Door studs straightened<br>Walls straightened<br>Plaster margin around window 10mm<br>Bulkheads/reveals straight/level Columns straight/square<br>Ceiling trimming correct<br>Ceiling lines at walls straight (visual)<br>No damage from rough ins<br>Comments<br>Photos

  • Comments

  • Photos

WIR Linen

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • No damage from rough ins

  • Comments

  • Photos

Bathroom

  • Door studs straightened Walls straightened

  • Villaboard margin around window 6mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • Plumbing Wastes & Water Points in correct locations as per plans

  • Shower base installed ( if applicable)

  • Spa / Bath installed correctly

  • Noggins installed for towel rails & toilet paper holder

  • Shower Niche correct size & location

  • Comments

  • Photos

WC

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • Plumbing Wastes & Water Points in correct locations as per plans

  • Noggins installed for towel rails & toilet paper holder

  • Comments

  • Photos

Stairwell

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • Noggins installed for stair balustrade

  • No damage from rough ins

  • Comments

  • Photos

Alfresco

  • Plumbing Wastes & Water Points in correct locations as per plans

  • Gas point in correct location

  • Comments

  • Photos

Garage

  • Door studs straightened

  • Walls straightened

  • Plaster margin around window 10mm

  • Bulkheads/reveals straight/level Columns straight/square

  • Ceiling trimming correct

  • Ceiling lines at walls straight (visual)

  • When a steel beam is installed on brickwork over roller door entry, ensure the centre is blocked out to fix roller door lifting mechanism

  • Ceiling & wall noggins installed for panel lift door motor & brackets

  • Does the concrete floor have brick mortar stains

  • Comments

  • Photos

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.