Title Page
-
Unit Number
-
Conducted on
-
Prepared by
-
Supervisor
-
Items on this QA report which are not completed within 7 Days from the Date of this report will be assigned to another trade for rectification and the trade originally responsible will be back charged accordingly.
-
Reinspection Date
-
Have Prestart Site Report items been actioned and completed
-
Crossover protection installed ( If applicable)
-
Temp fencing onsite
-
Site & safety signs installed
-
Power pit installed
-
Builders power pole installed & power connected
-
Rubbish cage or skip onsite
-
Builders toilet onsite
-
Water meter & supply onsite
-
Is site clean has concreter stack all materials & offcuts at cage or skip
-
Has concreter removed all trip hazards (boxing/pegs)
-
Setbacks from boundary as per plans
-
Perimeter dimensions as per plans
-
Conduits installed for kitchen island cabinets ( if applicable)
-
Conduits installed for power supply to internal switch boards
-
Slab wastes in correct locations (Sinks,Vanties,Toilets,Showers,Sewer Stack,Water Supply Conduits etc)
-
Is slab height correct as per TBM on plans
-
Is slab level +/- 15 mm using Laser Level
-
Any exposed reinforcement mesh visible at slab rebate/edges
-
Has concrete been correctly vibrated ( no honey comb edges or rebates)
-
Has black plastic been pulled up to fully cover edges of slab on all areas/elevations
-
Retaining walls installed (if applicable)
-
Additional Site Comments
-
Photos