Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Slab Checklist
Compliance Documents:
-
Have you received the QA document from the concrete labour contractor?
-
Have you received the QA document from the plumbing contractor?
-
Has council inspected and signed off all underground plumbing?
-
Has the Certifier/Structural Engineer signed off on the slab?
Plumbing Checklist
-
Are the plumbing undergrounds in the correct location as per the working drawings?
-
Are all plumbing penetrations accounted for?
Pre-pour Checklist
-
Is the reinforcing installed as per working drawings and best practice?
-
Has the electrician run his conduit or cable for the power and nbn?
-
Is the formwork strong enough to hold up without movement during the concrete pour?
-
Are the distances to the property boundary consistent with the working drawings and site survey?
-
Are the overall dimensions consistent with the working drawings?
-
Has the formwork been installed square?
-
Has the formwork been installed straight?
-
Is the formwork at the correct height (checked via the registered surveyors mark)?
-
Are the shower rebates in the correct location and the correct size as per working drawings?
-
Are window joinery rebates in the correct location and the correct size as per working drawings?
-
Have all penetrations/construction joints had termite protection installed?
WHS Checklist
-
Is there a designated location for the concrete pump/trucks to wash out after the pour?
-
Is there a water source onsite for clean up after the pour?
-
Do star pickets have safety caps installed?
Sign off
-
Add signature