Title Page

  • Site conducted

  • Unit number

  • Conducted on

  • Prepared by

  • Location

Pre-line Inspection

Plumbing

  • Have you received a QA document from the Plumbing contractor?

  • Has council inspected and passed the plumbing rough in?

  • Have all mixers been installed into wall cavity?

  • Has the bath, bath cradle and nogs been installed as per best practice?

  • Have all fixtures and fittings been allowed for in the rough in stage?

  • Is the plumbing rough in complete and under test?

  • Has the stack been dropped?

  • Are all waste pipes adequately supported within the mid floor?

  • Are all plumbing service penetrations through structural timber compliant?

  • Has the roof vent been installed and flashed correctly?

Carpentry

  • Have you received a QA document from the Carpentry contractor?

  • Is the cladding complete and watertight?

  • Are all external balcony's waterproofed and watertight?

  • Is the wet area flooring installed as per plans and specifications?

  • Is the timber framing moisture content within acceptable tolerances before lining?

  • Has the wall framing been straightened and checked for plumb and square?

  • Has the wall framing been checked for straight and square at the kitchen benchtop location?

  • Has the roof access hatch been installed in the correct location and correct size as per plan?

  • Are the nogs for the towel rails installed?

  • Are the nogs for the towel rings installed?

  • Are the nogs for the toilet roll holders installed?

  • Are the nogs for the vanity's installed?

  • Are the nogs for the shower tray installed - if applicable?

  • Are the nogs for the disability support rails installed - if applicable?

  • Are the nogs for the stair handrail installed - if applicable?

  • Are the nogs for the garage door installed?

  • Are the nogs for the rangehood installed?

  • Have all cavity sliders been installed and are the correct size?

  • Have ceiling battens been installed at correct spacings, and openings for lights/vents been trimmed out?

  • Has nogging been installed to provide fixing for external structures (e.g. pergolas, ex stairs) - if applicable?

Electrical

  • Have you received a QA document from the electrical contractor?

  • Has electrical rough in been completed and mains cable run to the switch box?

  • Has all mechanical ventilation been installed to the correct locations?

  • Has all data/security system cable been run and control panels are roughed in to the correct location?

  • Are all electrical service penetrations through structural timber compliant?

  • Are nogs installed for fixed or hanging light fittings - if applicable?

Passive Fire Protection

  • Have you received a QA document from the Passive Fire contractor?

  • Has the Certifier/Fire Engineer signed off all of the fire walls?

  • Have any plumbing penetrations within a fire wall been installed and sealed with an approved sealant?

  • Have flush box intumescent pads been installed to flush boxes on fire walls - if applicable?

  • Have fire walls been smoke sealed with an approved sealant - if applicable?

  • Have all soffit spaces been closed off with an approved system in line with fire wall locations?

  • Has all Rockwall/mineral wool been installed correctly without air gaps?

Insulation

  • Have you received a QA document from the insulation contractor?

  • Is the 'R' value and type/brand of the wall insulation as per spec?

  • Is the 'R' value and type/brand of ceiling insulation as per spec?

  • Is the 'R' value and type/brand of mid floor insulation as per spec?

  • Is the insulation installed correctly without any air gaps?

Air Conditioning

  • Have you received a QA document from the Air Conditioning contractor?

  • Are all control panels roughed in to the correct location as per working drawings and client consultation?

  • Are all ducted outlets installed in the ceilings/walls at the correct locations as per working drawings?

  • Have all ducted units got access available for servicing?

  • Are the split system A/C units in the correct locations as per spec and working drawings?

  • Are all A/C service penetrations through structural timber compliant?

Window Joinery and Openings

  • Has window joinery been packed and fixed off as per code and best practice?

  • Have external doors/windows been installed plumb and level?

  • Have you sighted the glazing safety markings?

Sign off

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.