Pre-line Inspection
Plumbing
-
Have you received a QA document from the Plumbing contractor?
-
Has council inspected and passed the plumbing rough in?
-
Have all mixers been installed into wall cavity?
-
Has the bath, bath cradle and nogs been installed as per best practice?
-
Have all fixtures and fittings been allowed for in the rough in stage?
-
Is the plumbing rough in complete and under test?
-
Has the stack been dropped?
-
Are all waste pipes adequately supported within the mid floor?
-
Are all plumbing service penetrations through structural timber compliant?
-
Has the roof vent been installed and flashed correctly?
Carpentry
-
Have you received a QA document from the Carpentry contractor?
-
Is the cladding complete and watertight?
-
Are all external balcony's waterproofed and watertight?
-
Is the wet area flooring installed as per plans and specifications?
-
Is the timber framing moisture content within acceptable tolerances before lining?
-
Has the wall framing been straightened and checked for plumb and square?
-
Has the wall framing been checked for straight and square at the kitchen benchtop location?
-
Has the roof access hatch been installed in the correct location and correct size as per plan?
-
Are the nogs for the towel rails installed?
-
Are the nogs for the towel rings installed?
-
Are the nogs for the toilet roll holders installed?
-
Are the nogs for the vanity's installed?
-
Are the nogs for the shower tray installed - if applicable?
-
Are the nogs for the disability support rails installed - if applicable?
-
Are the nogs for the stair handrail installed - if applicable?
-
Are the nogs for the garage door installed?
-
Are the nogs for the rangehood installed?
-
Have all cavity sliders been installed and are the correct size?
-
Have ceiling battens been installed at correct spacings, and openings for lights/vents been trimmed out?
-
Has nogging been installed to provide fixing for external structures (e.g. pergolas, ex stairs) - if applicable?
Electrical
-
Have you received a QA document from the electrical contractor?
-
Has electrical rough in been completed and mains cable run to the switch box?
-
Has all mechanical ventilation been installed to the correct locations?
-
Has all data/security system cable been run and control panels are roughed in to the correct location?
-
Are all electrical service penetrations through structural timber compliant?
-
Are nogs installed for fixed or hanging light fittings - if applicable?
Passive Fire Protection
-
Have you received a QA document from the Passive Fire contractor?
-
Has the Certifier/Fire Engineer signed off all of the fire walls?
-
Have any plumbing penetrations within a fire wall been installed and sealed with an approved sealant?
-
Have flush box intumescent pads been installed to flush boxes on fire walls - if applicable?
-
Have fire walls been smoke sealed with an approved sealant - if applicable?
-
Have all soffit spaces been closed off with an approved system in line with fire wall locations?
-
Has all Rockwall/mineral wool been installed correctly without air gaps?
Insulation
-
Have you received a QA document from the insulation contractor?
-
Is the 'R' value and type/brand of the wall insulation as per spec?
-
Is the 'R' value and type/brand of ceiling insulation as per spec?
-
Is the 'R' value and type/brand of mid floor insulation as per spec?
-
Is the insulation installed correctly without any air gaps?
Air Conditioning
-
Have you received a QA document from the Air Conditioning contractor?
-
Are all control panels roughed in to the correct location as per working drawings and client consultation?
-
Are all ducted outlets installed in the ceilings/walls at the correct locations as per working drawings?
-
Have all ducted units got access available for servicing?
-
Are the split system A/C units in the correct locations as per spec and working drawings?
-
Are all A/C service penetrations through structural timber compliant?
Window Joinery and Openings
-
Has window joinery been packed and fixed off as per code and best practice?
-
Have external doors/windows been installed plumb and level?
-
Have you sighted the glazing safety markings?
Sign off
-