Photo of Site
Existing Site Conditions
-
Has temporary site identification sign been installed
-
Current Site Status
- Demolition of existing building required
- Block Vacant
- Tenants in existing dwelling will be onsite during proposed Construction
- Remnants of previous construction on site
- Existing Retaining walls to remain on site
- other
-
Is there damage to any existing assets? Footpath, Crossover, Gutter, Road etc
-
Is there a tree in the nature strip?
-
Re-establishment survey required?
-
Will gradient of site require additional silt/water/material runoff retention system from entering neighbouring properties?
Permits
-
Is traffic Management Required ?
-
Footpath closure required? (some times the same as road closure permit depends on council)
-
Work zone permit (vehicle parking zone) required?
-
Comments
Site Access
-
Is the vehicle crossing on the correct side?
-
What is the vehicle crossing width?
-
Identify Site Access Restrictions
- NIL
- Court
- Lane (restricted)
- Blind Corner/road
- Bus Stop
- Crossing
- School
- No Standing/Parking
- Main Road
- Gravel Road
- Poor Identification of site
- Emergency Services opposite site
- T intersection
- On a round about
- Occupied Site During Construction
- Play Ground
- Other
-
Does the bus stop require temporary relocation - Admin to arrange via local bus company (duration required and permits may also be required)
-
Will delivery time restriction be required if yes, please state delivery time window to be communicated to suppliers
-
Application of "Work Zone" parking permit/sign required, please state duration in days.
-
Will delivery time restriction be required if yes, please state delivery time window to be communicated to suppliers
-
Communication and delineation plan required to be developed and agreed to by tenants prior to site start
-
communication and construction material delivery plan requires to be communicated to officer in charge at the emergency service depot.
-
Is the adequate room for crane truck access? (Both width and Height, allow for outriggers)
-
Is there an alternate access to site?
-
Will council approval be required for alternative access
-
Comment
Existing Services
Electrical & Services
-
Existing Services
- None Present
- (7) Overhead/LV/HV
- low voltage Service Wire to nieghbour
- Telstra/Optus
- Gas
- Water Mains
- NBN
- Sewer
- Fire Services
- Temp Power pole
- other
-
Are overhead power lines across access points?
-
Where power lines run in line with the access point of the site a line pump MUST be used along with a Non Slewing (Franna) mobile crane for all heavy lifts.
-
Are there overhead power lines within 6.6 metres from the nearest point of proposed dwelling?
-
Request Power Supplier inspection report
-
Tiger tails required on service line ? (yes if within 3m of dwelling)
-
Has Underground power pit been installed
-
Will multiple power boards be required ( Max Single 30 meter Extension Leads only)
-
Comment
Cage, Toilets, Crossings & Fences
-
Is there an area level for toilets and cage?
-
Is there an area for a skip bin
-
Comment
-
Is water available on site?
-
Is temp fencing required to isolate existing occupied dwelling
-