Information

  • Document No.

  • Job Number

  • Address
  • Plan name & elevation

  • Market/Sold

  • Requested on

  • Conducted on

  • Prepared by

Lot Bench

Lot Bench #1

  • Add a photo of the lot.

  • Is this a front, rear or side entry home?

  • Choose the style

  • Choose the swing

  • Will this home require a dropped garage floor?

  • By how many feet?

  • This home will require special engineering.

  • How many steps will be needed to accommodate the garage drop?

  • How many feet does the garage need to be extended to accommodate the garage drop?

  • Are piers required?

  • Is a high slab template required?

  • Are deeper beams required?

  • Is there sufficient width for 24' turn around?

  • The first lot bench was performed on:

  • Builder:

Lot Bench #2

  • Is a drop brick ledge required?

  • Is the drop more than 4 feet?

  • How many linear feet?

  • How many square feet?

  • How many steps will be needed to accommodate the garage drop?

  • Is a foundation pump required?

  • Is a flatwork pump required?

  • Is a grinder pump required?

  • Is a double rough required?

  • Is a drive curb required?

  • Mark the location on the plot plan.

  • Is a new meter can required?

  • What kind of meter can?

  • Does the front lead walk require steps?

  • How many are needed?

  • Is a railing required

  • How many linear feet of railing are needed?

  • Does rear patio/deck require steps?

  • How many are needed?

  • Is a railing required

  • How many linear feet of railing are needed?

  • Is a fence required?

  • Mark all locations on the plot plan.

  • What style of fence is needed? Choose all responses that pertain.

  • How many feet on the left side?

  • How many feet on the right side?

  • How many feet on the rear?

  • Will sleeves be required in a retaining wall?

  • Mark the location on the plot plan.

  • How many?

  • Is a retaining wall required?

  • What is the average length?

  • What is the average height?

  • Are there drainage concerns?

  • Describe:

  • Is a culvert needed?

  • Is additional erosion control required?

  • How many linear feet of silt fence?

  • How many linear feet of curlex?

  • How many linear feet of safety/debris fence?

  • Are compaction tests required?

  • Is there additional surveying required?

  • Describe:

  • Are additional underground services required?

  • Mark location on the plot plan.

  • Describe:

  • Is tree clearing required?

  • Mark location on the plot plan.

  • What is the cost?

  • Is additional site work required?

  • Mark location on the plot plan.

  • What is the cost?

  • Is there additional cost for the final grade?

  • Describe:

  • What is the cost?

  • Is a gravel drive required?

  • Mark location on the plot plan.

  • What is the cost?

  • Is additional loam/fill required?

  • What is the cost or quantity?

  • Are additional sprinklers or sod required?

  • Mark location on the plot plan.

  • Describe:

  • What is the cost?

  • Is undergrowth clean up required?

  • Describe:

  • What is the cost?

  • Is there an existing mailbox?

  • Are there any miscellaneous cost involved? Describe in detail with associated costs.

  • Item
  • Add any supporting photos.

  • This second lot bench was performed on:

  • Builder:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.