Title Page
-
Site name:
-
Lot numbers
-
Conducted on
-
Prepared by
-
Location
-
Construction foreman
-
Select date
Excavation
-
Is site adequately protected from public access?
-
Does fill comply with engineers specification?<br>
-
Is site benched to correct level?<br>
-
Has land surveyor pegged the site?
-
Has the concreter used the surveyors set out pegs?<br>
-
Has the base been passed by the building surveyor?
Preslab
-
Are all porches and columns included in set out?
-
Are slab elevations all as per drawings?
-
Are all edge beams at correct depth?
-
Are all edge beams as per engineers design?
-
Are deepened rebates as per engineers design?
-
Are step downs per engineers design?
-
Are garage step downs as per plans and engineers design?
-
Are trenches clear of debris?
-
Are internal beams located as per engineers design?
-
Check surveyors pegs correlate with set out hurdles?
-
Are all plumbing waste pipes as per working drawings?
-
Are plumbing items checked and signed off by drainer and construction foreman?
-
Are upper level stack pipes as per working drawings?
-
Are all waste pipes sewer grade pipes? (Eg 100mm)
-
Are all sewer pipes encased in quarter minus?
-
Are all sewer pipes and breather pipes located as per working drawings?
-
Does all pipe work have adequate concrete coverage?
-
Does all pipe work have adequate lagging?
-
Is service conduit installed for kitchen sewer?
-
Is all plastic membrane laid and adequately tapped and joined? (200mm lap)
-
Is plastic membrane adequately tapped and joined around sewer pipes?
-
Is trench mesh as per engineers drawings?
-
Is trench mesh adequately overlapped and tied at joins?
-
Is all reinforcement fabric adequately overlapped and tied?
-
Is all reinforcement fabric adequately tied to corner bars as designed by engineers?
-
Is all reinforcement fabric installed on correct bar chairs?<br>
-
Is all additional reinforcement for load points installed as per engineers design?
Building surveyor inspections
-
Has steel inspection been approved?
-
Have the piers been approved?<br>
-
Has building surveyor approved slab for pouring?
-
Has sewer/stormwater services been checked by camera pre pour?
Post pour
-
Have all boxing / stakes etc been removed?
Construction foreman sign off
-
Add signature
-
Select date