Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
LOTO box
-
Are padlocks applied to the correct isolation points (refer to padlock stamp and isolation map)
-
Are all the padlocks removed and only their keys remain in the box
-
Does the number of isolation points on isolation map align with the number of isolation padlocks available in the LOTO box
-
Is the shift manager green padlock fitted to the LOTO box
-
Are all persons working on the tasks under LOTO locked onto the box
Isolation and lock off sheet
-
Are all padlocks correctly identified in the "Key ID number" on the isolation and lock off sheet
-
Are all verification boxes tick to confirm padlocks are applied
-
Is the reason for isolation detailed on the sheet
-
Have the shift manager and competent person signed to authorise the isolations
-
Has the reinstatement section been fully completed
Isolation maps
-
Does the isolation map detail stored energy sources
-
Do all LOTO boxes have an isolation map
LOTO board
-
Are all departmental locks available on their pegs. If not, are they signed out on the "Departmental lock sign out/in" form
-
Are all engineering padlocks present on their pegs if they are not in use
-
Are all hasps in place on their pegs if they are not in use
-
Is there a LOTO specific risk prediction tool available for use
LOTO RPT
-
Has a LOTO RPT been used by all people working on the equipment
-
Have the hazards been correctly identified
-
Has the individual printed and signed their name
-
Have all other sections been correctly completed