Title Page
-
Conducted on
-
Sequence 10 : Audit conducted by (login)
-
Location
APM Checklist
-
Sequence 20: Write the code of the asset that AA(s) audited are working on in the NOTE field
-
Sequence 30: Associate(s) being audited with valid Training&Demonstration within 12 months?
-
Sequence 40: Write in THE NOTE FIELD the date of last demostration performed
-
Create a FWO
-
Sequence 50: Is a LOTO placard available AND is it accurate? (If Good add picture and location in notes.)
-
Create a FWO
-
Sequence 70: Ask the AA to list the energy sources of the Asset. All identified?
-
Sequence 80: List Energy sources missed by AA
-
Create a FWO
undefined
-
Sequence 90: Has the AA considered any stored energy (gravity, Pneumatic, Hydraulic, etc)?
-
Create a FWO
-
Sequence 100: Write the LOTO Step the AA is performing. If LOTO already completed write "Done"
-
Take a picture of LOTO applied or if "Done" the completed LOTO form.
-
Sequence 110: Ask AA to describe steps taken (or will take) to apply LOTO. Is answer correct?
-
Sequence 120: If not, write in the NOTE FIELD which steps the AA has missed (see instructions)
-
Create a FWO
-
Sequence 130: If more than 1 AA performing task, has Group LOTO being applied?
-
Create a FWO
-
Sequence 140: Have all Poor Answers in past week LOTO audits have generated a FWO
-
Go back and create FWO for all Poor answers.