Title Page
-
Site conducted
-
Conducted on
-
Prepared by
LOTO
-
Is there a LOTO register on site?
-
Is the LOTO register being used and evidenced?
-
Is there a fully stocked LOTO board on site?
-
Are personnel trained in use of LOTO?
-
Are there evidenced training records in place for LOTO use?
-
Is there suitable supervision for LOTO working?
-
Are all isolation points marked and identifies the equipment it isolates? (PUWER 1998)
-
Name and Signature of Person Carrying out Audit