Title Page
-
Project Name
-
Serial Number
-
Week Starting
-
Operator Name
-
Date
-
Prepared by
-
INSTRUCTIONS:
-------------------------------------
1. Answer the applicable questions below.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link. -
Hour Clock Reading
-
Day of the week
- Monday
- Tuesday
- Wednesday
- Thursday
- Friday
- Saturday
- Sunday
MACHINE – DAILY CHECKS
-
Tracks **Check For: Tension and condition
-
Underneath of machine **Check For: Leaks, Damage, Debris
FLUID LEVELS
-
Drill lubricant <br><br>**Check For: Fluid Level, leaks, damage
-
Engine coolant <br><br>**Check For: Fluid Level, leaks, damage
-
Engine oil <br><br>**Check For: Fluid Level, leaks, damage
-
Fuel <br><br>**Check For: Fluid Level, leaks, damage
-
Hydraulic <br><br>**Check For: Fluid Level, leaks, damage
ELECTRIC STRIKE SYSTEM - (Must be in place before each drill shot commences)
-
Assemble voltage detector <br><br>• Drive voltage stake into ground at least 6’ (2 m ) from drill and minimum 250mm deep <br>• Clip voltage limiter to voltage stake
-
Test strike system – see operation manual <br><br>If system fails any part of the test, Do Not Drill until test is completed successfully.
MACHINE – DAILY CHECKS
-
Tracks **Check For: Tension and condition
-
Underneath of machine **Check For: Leaks, Damage, Debris
FLUID LEVELS
-
Drill lubricant <br><br>**Check For: Fluid Level, leaks, damage
-
Engine coolant <br><br>**Check For: Fluid Level, leaks, damage
-
Engine oil <br><br>**Check For: Fluid Level, leaks, damage
-
Fuel <br><br>**Check For: Fluid Level, leaks, damage
-
Hydraulic <br><br>**Check For: Fluid Level, leaks, damage
ELECTRIC STRIKE SYSTEM - (Must be in place before each drill shot commences)
-
Assemble voltage detector <br><br>• Drive voltage stake into ground at least 6’ (2 m ) from drill and minimum 250mm deep <br>• Clip voltage limiter to voltage stake
-
Test strike system – see operation manual <br><br>If system fails any part of the test, Do Not Drill until test is completed successfully.
OPERATOR’S CONTROLS – WEEKLY CHECKS
-
Control panel <br><br>**Check For: Test switches
-
Fire Extinguisher <br><br>**Check For: Charge, damage, expiry date
-
Gauges, Indicators, Switches, Controls <br><br>**Check For: Damage, Function
-
Handholds & Steps <br><br>**Check For: Condition & Cleanliness
-
Isolation/Danger Tags <br><br>**Check For: Available for use
-
Operational Manual <br><br>**Check For: Available
-
Safety signs & Labels <br><br>**Check For: In place and Legible
-
Seat belt & Mounting <br><br>**Check For: Condition,
-
Seat in operational <br><br>**Check For: condition
COMPLETION
-
Comments
-
Completed by