Title Page

  • Site conducted

  • Prepared by

  • Room number / area

Untitled Page

  • Has existing floor slab been prepared?

  • Has Latex screed been installed to specified depth? (3mm)

  • Specified adhesive used prior to vinyl install?

  • Has correct cap and cover detail been installed & to correct height?

  • Has the correct vinyl been installed as per finishing schedule?

  • Has a roller been used on the laid flooring?

  • Have all welds been complete and cut off flush?

  • Is flooring complete and free from defects?

  • Has floor protection been put down?

  • Has all excess material and waste been removed from the area?

Site Manager Sign off

  • Sign off

  • Print name

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.