Information

  • Name of Project

  • Maximo No.

  • MEA Approved

  • Conducted on

  • Location
  • Prepared by

Site

  • Bill board photo

  • Approximate Gas requirement date

1.0 - Site Visit

  • Enter Stage of Works

  • Stage of Works
  • JSA Number

  • Stage of Development

  • Conducted on

  • Add media

Contacts

    Site Contact details
  • Name

  • Position

  • Phone / Email

  • Water Contractor

  • Contractors Name and details

  • Is contractor Gas qualified

Crossing Details

  • Railway Crossing

  • Railway Details

  • Add media

  • Date design requested

  • 1.4 - Drain Crossing

  • Add media

  • Drain Details

  • Date design requested

  • 1.4 - Misc Crossing

  • Type of Crossing

  • Add media

  • Crossing Details

  • Date design requested

  • 1.4 - Misc Crossing

  • Type of Crossing

  • Add media

  • Crossing Details

  • Date design requested

Misc Details

  • 1.4 - Property line definition required

  • Add media

  • Property Line Details

  • Date design requested

  • 1.4 - Easement Details

  • Add media

  • Easement Details

  • Date design requested

  • 1.4 - Flora Details eg trees, plants, grasses

  • Add media

  • Flora Details

  • Date design requested

  • 1.4 - Fauna Details eg Birds, animals, reptiles

  • Add media

  • Fauna Details

  • Date design requested

  • 1.4. Native Settlement

  • Add media

  • Native Settlement Details

  • Date design requested

  • 1.4. Contaminated Soils

  • Contacted soil details are required. Need to contact ....?... For additional details

  • Add media

  • Contaminated Soil Details

  • 1.4. Miscellaneous

  • Add media

  • Miscellaneous Details

  • Date design requested

Tie in details

    Add Tie in details
  • Tie in location

  • Add drawing

  • Add media

Check consultants plans

  • Does project involve a new estate

  • All lots covered

  • Offset table approved

  • Construction plan similar to approved plan of Subdivision

  • Is mains length greater than 10 % diff

  • Has mains extension officer approved difference

  • Service Road Crossing Conduits provided where required

Relevant details provided to Draftsperson

  • Offset table

  • Mains Construction method provided eg in conjunction with Road Construction

  • AutoCad road construction drawings

  • Mains size and Material<br>

  • Bill of materials

  • Single Trench, Common Trench, Conduit and Bore

  • Tie in details

  • Partial Gas Services

  • Marker Post Details

  • Special approvals eg Vic Roads, GasNet

  • Special warnings eg GasNet

  • Marker Post Details

Finish

Finish

  • Auditors signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.