Building Daily Checklist

  • Conducted on

  • Conducted by

G FLOOR COMPARTMENT/MACHINE/EQUIPMENT

  • DB BOX-SECURITY ROOM

  • MSB ROOM

  • GENSET

  • SEWAGE OUTDOOR/INDOOR/ODOUR PUMP

  • AIR BLOWER MACHINE

  • LIGHTING CARPARK/OUTDOOR

  • BUILDING

G FLOOR LOBBY COMPARTMENT/MACHINE

  • ENTRANCE DOOR

  • LIGHTING

  • AIRCOND LOBBY/LIFT

  • BUILDING

LEVEL 1 COMPARTMENT/MACHINE

  • SERVER ROOM

  • LIGHTING

  • KITCHEN EQUIPMENT

  • MEETING ROOM (PA SYSTEM/EQUIPMENT/LIGHTING)

  • DB & SWITCH BOARD

  • ALL AIRCOND

  • BUILDING/CORRIDOR

LEVEL 2 - 6 : COMPARTMENT/MACHINE

  • BUILDING/CORRIDOR

  • LIGHTING

  • DB SWITCH BOARD (PANTRY ROOM)

LEVEL 7 COMPARTMENT/MACHINE

  • WATER TANK SYSTEM/PIPING

  • HEAT PUMP SYSTEM & PIPING

  • LIFT MOTOR

  • GYM

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.