Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
UPS
-
Check battery
-
Check UPS
-
Ups load A
-
Ups load B
Airco
-
Office
-
Power room 1
-
Airco1
-
Power room 2
-
Airco 2
-
Node
-
Airco 3
-
Airco 4
-
Airco 5
-
Airco 6
-
Airco 8
-
Airco 11
-
Airco 10
-
Housing
-
Airco 9
48V Dc A
-
Visual check modules
-
Check battery
-
Check voltage/load
48V Dc B
-
Visual check modules
-
Check battery
-
Check voltage/load
Generator
-
Cat 1
-
Check level coolingwater
-
Check emergency stop not pressed
-
Check air intake
-
Per heating
-
Check battery
-
Check for lose parts
-
Fuel level above 75%
-
Indication lamps /sensing instruments
-
Cat 2
-
Check level coolingwater
-
Check emergency stop not pressed
-
Check air intake
-
Per heating
-
Check battery
-
Check for lose parts
-
Fuel level above 75%
-
Indication lamps /sensing instruments
Electrical equipment
-
Check distribution boards en static switches
-
Node
-
Office
-
Housing
-
Power room1
-
Power room2
-
LV room
-
HV room building 1 and 2
-
Visual check sockets
-
Visual check switches
Water leak detection
-
Power room1
-
Power room2
-
Housing
-
Node
FDS
-
Check gas bottles
-
Check if no error
-
check battery
Roof
-
Check lightning protection
-
Check ventilation DC
Lighting
-
lighting
-
Power room 1
-
Power room 2
-
Office
-
Node
-
Housing
-
Generator room
-
HV room
-
LV ROOM
-
Emergency lighting
-
Power room 1
-
Power room 2
-
Office
-
Node
-
Housing
-
Generator room
-
HV room
-
LV ROOM
General
-
Check locks monthly
-
Check warm water >65 graden
-
Sanitar
-
First aid box
-
Check if site is free of trash
Sign Off
-
On site representative