Information
-
Document No.
-
Audit Title
-
PiraƱa Work Order Number
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Risks
Potential Risks
-
Electricity
-
Moving Parts
-
Compressed Air
-
Water/Fluids
-
Manual Handling
-
Restricted Access
-
Stored Energy
-
Fumes/Gas
-
Slips and Trips
-
Molten Metal
-
Weather Conditions
-
Working at Height
-
Dust
-
Chemicals
-
High/Low Temperature
-
Workplace Transport
-
Falling Objects
-
Lighting Levels
Evaluation
-
Likelihood
-
Severity
-
Evaluation = Likelihood x Severity
-
DATE TIME
-
Pirana Works Order Number
-
Name
-
Add signature
PPE Requirements
-
PPE being worn
- Standard Issue (T-Shirt and Trousers)
- Safety shoes
- Safety Glasses
- Nitrile Gloves
- Other Gloves
- Overalls
- Bump Cap (For Use Inside Machines and Paint Plant)
- Hearing Protection
- Full Face Mask
- Harness
- Goggles
- Dust Mask
- Disposable Overalls
- Long Arm Gloves
- Welding Gloves / Welding Mask
- Air Fed Mask
- Hard Hat
-
Ear protection
-
Faces mask / goggles required
-
Harness required to be worn
-
Air feed mask, solvent mask or air feed mask required
Working area
-
Is a barrier in place to stop un authorised access to working area
-
Is the area clear and free of obstruction
-
Is there safe access and egress
-
Additional information
-
Photo of working area / risk
Electrical systems
-
Has the system been made dead prior to start of work
-
Lock off and prove system dead prior to starting work
-
If lock off applicable, show correct lock off device being used
Hydraulic systems
-
Working on high pressure systems, are systems made dead prior to start of work
-
Floors clean with no slip hazards
-
Are any manual handling tasks involved
Working at height
-
Use of mobile boom or scissor lift, does operator have current Ipath licence?
-
Harness required?
-
Is there a work area barrier in place?
-
Does the ladder being used have a current scaf-tag?
Lifting / movement of equipment and materials
-
Fork lift use, does the driver hold a current KPM licence for the equipment being used?
-
Is all lifting equipment identified with correct inspection tag, and is the SWL correct for task being carried out
Hot work taking place
-
Type of hot work, are fire extinguishers available, 30 min fire watch on completion of work
Tools being used
-
Are all electrical tools covered by a PAT test
-
Are all tools fit for purpose and not damaged?
Working with chemicals
-
Are COSHH data sheets available?
-
Are additional PPE requirements needed?
Movement of plant and equipment
-
Use of trolley jacks?
-
Are skates fit for purpose?
-
Is there a layout for new location?
-
Is the route clear of obstruction, floor clean and smooth?
-
Are other members of staff being kept off the route of transport
-
Are there any height restrictions?
-
Show how load is secured
-
Show plan
Additional information as job progresses.
-
Additional information (e.g. Additional PPE)
-
Additional photographs
-
Sign for amendments