Title Page
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Site Supervisor
-
Divisional Director
-
Are all findings from previous inspection closed out?
General
-
Are copies of quality, responsible sourcing, environmental and safety policies displayed?
-
Are the CREAGH values displayed and communicated
-
Have divisional objectives been set and communicated <br>
-
Is the organisational chart up to date
-
Are responsibilities documented
-
Is the management plan up to date
Order Processing/ Site Requirements
-
Are drawings produced and are calculations verified
-
Are product specifications available and used
-
Have order amendments/ variations been communicated and recorded
-
Have orders been received and processed in accordance with procedure
-
Have order details been communicated to production
-
Are approved suppliers/ subcontractors used
-
Is the procedure for hiring new subcontractors used
-
Has appropriate PPE been issued and is it being used
-
Has subcontractors entitlement to work in the U.K. Been verified
-
If drawings are outsourced how is the competency of the company used verified and is there a procedure used and documented for checking
-
If temporary works are used is there a supervisor/ coordinator in place and can there competency be verified
-
Has an AP visited site and has RAMS been produced and communicated to relevant persons e.g. Lorry drivers
-
How is the CDM managed and is the design stage risk controlled, documented and communicated
-
Is PAT required on site (3 months) and if so has it been carried out
-
Has a H&S Inspection been carried out
-
Are handover sheets used and signed off by both client and company
Production Planning
-
Is there evidence of production plans (where appropriate)
Inspection & Test
-
Is inspection and testing carried out in accordance with the procedure e.g. Cube tests, sieve analysis?
-
Are records of inspection and testing available and have failures been dealt with effectively e.g. Improvement reporting
Calibration
-
Is inspection and testing equipment calibrated and identified as such?
-
Are records of calibration available
Storage, handling and Despatch
-
Are materials and products stored satisfactorily in the designed locations
-
Is despatch planned and controlled
Non Conformance, Complaints & Corrective Actions
-
Is non conforming product identified and segregated<br>
-
Are records of non conformances maintained
-
Are non conformance products and complaints from customers recorded and acted upon and the trends monitored
-
Is the IR reports process used to identify corrective and preventive actions
-
Are internal and external complaints recorded and action need through the improvement Reporting Process
Noise & Vibration Control
-
Have noise levels been assessed and communicated
-
Is there evidence of noise control in place
-
Is noise warning signage in place
-
Is hearing protection used where appropriate
-
Have vibration levels been assessed and measured
-
Have actions been taken to reduce exposure and are HAVS assessments carried out
Chemical handling / Storage & Control
-
Are chemicals stored in bunded areas and away from sources of danger and watercourses
-
Are IBC's stored on contaminated trays
-
Are COSHH assessments available and up to date for the last 12 months
-
Are spill kits available at appropriate locations and properly stocked and are personnel trained in use of spill kits
-
Is appropriate PPE used when handling chemicals
Training/Competence/Awareness
-
Has induction and task specific training been carried out for Creagh employees and sub contractors alike
-
Are tool box talks carried out and recorded every fortnight
-
Are personnel trained to use the equipment that they are using e.g. Lifting equipment MEWP's
Risk Assessments
-
Have risk assessment results been communicated to employees and clearly signed off by employees
Safe System of Work
-
Have safe systems of work been developed
-
Have details of safe system been communicated to employees and clearly signed off
-
Is their evidence of good housekeeping
-
Are all computer files document controlled
Emergency/Planning
-
Are fire exit routes clear and signed
-
Is warning and emergency signage adequate
-
Is fire fighting equipment available and in good order
-
Have personnel been trained how to use fire fighting equipment
-
Are first aid personnel and first aid equipment available and is adequate signage in place
-
Are there Safety and Environmental Plans in place and are they clearly communicated?
Traffic/Visitor Controls
-
Is traffic management adequate in the division? Is there a traffic management plan in place and has it been reviewed in the last 12 months
-
Is loading carried out in a safe manner and is it carried out by a competent person with the necessary training
-
Is access and egress adequate
-
Are visitors and contractor controlled
Maintenance
-
Are records of plant and machinery maintenance available
-
Are records of statutory inspections of equipment available i.e lifting, equipment, compressed air equipment, LEV, fire equipment, alarms, LOLER! Plant - shovel, excavators etc?
-
Are daily checklists completed for vehicles - lorries, forklifts, loading shovels, excavators etc
-
Are pre op inspections carried out on plant and lifting equipment
Sign off
-
Auditee
-
Auditor
-
Audit Summary