Title Page
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Divisional Director
-
Factory Manager
-
Site Supervisor
-
Completed on
-
1. Are all findings from previous inspection closed out?
2. Risk Assessment & SSOW
-
Specific, Communicate to All, In date 12 months, All risks covered & Environmental risks controlled (Marks out of 10)
-
Add media
3. LOLER & PUWER Documentation
-
Cranes, Monthly Wire Rope Checks, Closed out comments from thorough examinations, Forklifts, Air Receivers, MEWPs, shutters, Trestles, Mixer House, Guarding (Marks out of 20)
-
Add media
4. PPE
-
Task specific, Hearing Protection & Safety Goggles, Correct Dust Masks (FFP3 etc) (Marks out of 20)
-
Add media
5. Housekeeping & Safe Access
-
Clean Walkways, Laneways cleaned, rubble cleared, bottom of factory cleaned, safe access to platform (Marks out of 30)
-
Add media
6. Working at Heights
-
Safe Work on Trailers, safe access to cleaning platform (Marks out of 30)
-
Add media
7. Pre Op Inspections
-
Cranes, Saws, Forklift Trucks, Handtools, & MEWP, batching plant, Castel key system (Marks out of 10)
-
Add media
8. Fire & Emergency
-
Fire Drills, Emergency Procedures, Fire Warning Systems & Fire Marshals (Marks out of 10)
-
Add media
9. Training & Competency
-
Toolbox talks, Overhead Crane, Forklift Trucks, Prestressing, Ab Wheel (Marks out of 20)
-
Add media
10. Lifting Operations
-
Lift Plan, Lift Zone Clear, Equipment Certified, Trained Operators & Safe Lifting (Marks out of 20)
-
Add media
11. Prestressing
-
Safe zones maintained, warning sounder so, warning lights, Pre Ops, Wire retainers 10m, trained operators, Barrels and wedges cleaning (Marks out of 30)
-
Add media
12. Environmental & COSHH & Stored Correctly
-
IBC Storage, Drip Trays, COSHH, Assessments & Substances labeled Correctly (Marks out of 10)
-
Add media
13. Mgt of Visitors and Subcontractors
-
Sign in, RAMS for subcontractors, PWT system in use, Contractors PPE (Marks out of 10)
-
Add media
14. Fix wire testing and PAT
-
Fixed wire testing and PAT (Marks out of 10)
-
Add media
15. Permit to Work (Marks out of 10)
-
Permit to Work records
Sign Off
-
Auditee
-
Auditor
Audit Summary
-
Number of people working, key activities, key issues, close out actions.