Title Page

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Divisional Director

  • Project Manager

  • Site Supervisor

  • Completed on

Propping

  • Named TWD

  • Named TWC

  • Named TWS

  • TW MS signed

  • TW Drawings - latest revisions

  • TW RA signed

  • Props - Number & size as per drawings

  • Props to solid floor correct - based/ head/ pins

  • Props to hollowcore - correct - rebar/ plates/ wingnuts

  • Props - tagged

  • Prop tags to underside of hollowcore dywdag fixing

TW Grouting Procedure

  • TW GP Drawings - Latest Revisions

  • TW GP Drawings - Marked up grouting dates

  • Have grout tubes got inspection holes drilled

  • Check filled grout inspection holes for concrete

Permits

  • Permit register - filled in

  • Permits - numbered and dated

  • Signed off by the named Creagh designer

Creagh Engineer

  • Last recorded site inspection visit

Sign Off

  • Auditee

  • Auditor

Audit Summary

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.