Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1 Previous Inspection
-
1.1 - The last safety inspection report has been reviewed by site management?
-
1.2 - Are there any outstanding actions?
2.0 - Administration
-
2.1 - Is the Site Safety plan available and up to date?
-
2.2 - Is the Scaffold register, PUWER 98 register up to date?
-
2.3 -Are all the relevant conformance certification available and in date? Scaffold design.<br>Manufacturers guide on site for PASMA.?
-
Has all electrical equipment been PAT Tested?
-
2.4 - Is there evidence of Hot works permit issue and controlled?
3.0 - Training & Competency
-
3.1 - Has the roofing crew read and signed the risk assessment, and received the relevant information relating to the current scope of works?
-
3.1 - is the risk and method statement relevant to the current WAH task?
4.0 - Information, Instruction
-
4.1 - When was the last toolbox talk given?
-
Add media
-
4.2 - What was the last toolbox talk subject?
-
4.3 - Was a safety briefing given, risk assessment or method statement .?
5.0 - Roofing works
-
5.1 - Ensure that edge protection is provided to prevent persons, or materials falling?
-
5.2 - Ensure that precautions have been taken to stop falls through fragile materials when working on roofs?
-
5.3 - Has adequate precautions been implemented to segregate people below the roof work?
-
5.4 - Has the company implemented procedures for adverse weather?
Observation Report
-
A5.1 - Location of roofing works
-
A5.2 - Description of activity being carried out
-
Area of inspection
-
B5.1 - Location of roofing works
-
B5.2 - Description of activity being carried out
-
Area of Inspection
-
5.4 - Are there any matters that could give rise to the Risk to the Health and Safety?
-
5.5 - Details of any actions taken in respect of at Risk matter identified above?
-
5.6 - Can the work be carried out safely? (If not - enter why and name of the person informed)
-
Observation Comments
6.0 - Fire Risk and Emergency Management
-
6.1 - Is there a fire risk assessment in place?
-
6.2 - Ensure there are emergency procedures for evacuation from the workplace in case of a fire, or explosion?<br>Do they integrate with the client premises?
-
6.3 - Do operative know what these procedures are?
-
6.4 - Check that there is an adequate means of raising the alarm, and that it is regularly tested?
-
6.5 - Ensure that there are adequate escape routes and that these are kept clear of obstructions?
-
6.6 - Ensure that the quantity of flammable gasses are kept to a minimum, and are adequately stored?
-
6.7 - Check that suitable fire extinguishers are provided, and that they are maintained, at key access points?
-
6.8 - check that all fire extinguishers have had an annual inspection?
-
6.9 - Is the fire plan relevant for the workplace, and direct you to a safe place, or muster area?
-
Fire Risk Management None Conformance
-
Additional Comments
-
Are there sufficient first aiders and equipment on site?<br>Are they aware of rescue planning and suspension trauma?
-
If Harness and line used are they correct for the work, worn properly, operatives trained, in date and inspected?
-
Is there a rescue plan for WAH..<br>Is it suitable and sufficient to rescue someone?
7.0 - Scaffolding/Working platforms
-
Could work have been carried out without operatives working at height ?
-
Access to the work area is safe.
-
7.1 - Are the ladders secured at both stiles, correct angle and in good order?
-
7.2 - Are all the platforms fully boarded with guardrails correctly fixed?
-
7.3 - Are trapdoors/gates or barriers at key ladder access points?
-
7.4 - Are the Ladders correctly secured and no tubes obstructing rungs?
-
7.5 - Are the Ladders in a serviceable condition?
-
7.6 - Is the Scaff tag signed and displaying the relevant date?<br>Is the register completed for 1 in 7 day.<br>Competent person checking work platform at start of shift?
-
Scaffolding None Conformance Compliant
-
Additional Comments
-
Has someone visually inspected the work platform before use?
8.0 - Vehicle Movement Controls
-
State unloading area
-
8.1 - Traffic routes sufficient for safe and easy movement ?
-
8.2 - Vehicles and pedestrians segregated ?
-
8.3 - Designated loading areas clearly define, and segregated?
-
8.4 - Pedestrian routes clearly define?
9.0 - Waste Management
-
9.1 - Is A waste management plan in place and suitable?
-
9.2 - Is the plan being maintained?
-
9.3 - Is the waste controls being applied by the operatives, and disposing waste correctly?
-
9.4 - Are skips, bins clearly labelled?
-
9.5 - Are waste transfer notes available and correctly completed?
10.0 - Compressed Gasses
-
10.1 - Are they kept away from flammable liquids?
-
10.2 - Are they properly stored in a purpose made cage, with suitable signage?
-
10.3 - Are gasses segregated by type?
-
10.4 - Is the cylinder valves fully closed when not in use?
-
10.5 - Do all line connections only have approved fittings and clips, with no Jubilee clips?
11.0 - Site Operatives
-
11.1 - Are all the operatives wearing the correct PPE?
-
11.2 - Is the PPE adequate, and in good condition?
-
11. 3 - Are the operatives working safely?
-
11.4 - Are the operatives adequately supervisied?
-
Observations
-
None Conformance
12.0 - site general issues
-
12.1 - electrical tools and equipment including extension leads.
-
12.2 -
-
12.3 -
-
12.4 -
-
12.5 -
-
Observations
-
None Compliance
13.0 - Welfare
-
13.1 - Welfare facilities are clean and tidy?
-
13.2 - Toilet facilities are clean and tidy?
-
13.3 - Toilet facilities with soap, hand towels, hot and cold water?
-
13.4 - Facilities to dry wet clothing?
-
13.5 - Secure facilities for own clothing and work wear?
Corrective Action plan
-
Corrective Actions assigned to
-
Listed non conformance
-
KPI Conformance
- 0 - Immediate Danger Present
- 1 - 2 Major Non - Conformance Identified
- 3 - 4 Minor Non Conformance Identified
- 5-6 Minimum Non Conformance Identified
- 7 Company Targets Acheived
- 8 - 9 Exceeds Company Standards
- 10 - No Further Improvements
Sign Off
-
Auditor's signature
-
Name of the site person receiving this report
-
The date and time of receipt
Closure
-
I confirm all actions highlight in this report have been actioned on
-
Name of person closing this report