Title Page
-
To be completed by Project Supervisor or Nominated person weekly from the start of construction work on site, Completed forms are to be kept readily available (preferably on site) for the duration of construction works, after which time shall form part of the CDM Health and Safety file.
-
Sensible Monitoring Audit Completed By:
-
Site Manager:
-
Contract Number:
-
Project Title:
-
Conducted on
Manual Handling
-
Any H&S actions identified shall be entered onto Audit / Inspection Action Log and brought to the urgent attention of the appropriate personnel as soon as possible. Contractor / Project Manager to be notified of actions required / taken.
-
1) How are employees made aware of the hazards associated with manual handling?
-
Comments:
-
Attach any images relevant to question 1 here.
-
2) Has any training regarding manual handling and safe lifting techniques been carried out?
-
Comments:
-
Attach any images relevant to question 2 here.
-
3) Have tasks requiring manual handling been identified?
-
Comments:
-
Attach any images relevant to question 3 here.
-
4) Have risk assessments associated with manual handling activities been:<br>Carried out and where appropriate have employees been:<br>Trained and informed of the outcomes of assessments?
-
Comments:
-
Attach any images relevant to question 4 here.
-
5) Have all controls identified by the risk assessment been implemented?
-
Comments:
-
Attach any images relevant to question 5 here.
-
6) Are mechanical aids / equipment i.e. hoists, telehandlers, wheel barrows, sack barrows and other plant or equipment used so that manual lifting and handling of heavy or bulky objects is kept to a minimum?
-
Comments:
-
Attach any images relevant to question 6 here.
-
7) If any of the above are used , are they certificated and subject to a regime of inspection and checking?
-
Comments:
-
Attach any images relevant to question 7 here.
-
8) Are materials (e.g. cement bag) ordered in sizes which can be lifted safely when on site?
-
Comments:
-
Attach any images relevant to question 8 here.
-
9) How is the lifting and installation of kerbs carried out?<br>a) Are suitable mechanical methods used?
-
Comments:
-
Attach any images relevant to question 9 here.
-
10) How are gas cylinders loaded, unloaded and transported around site?
-
Comments:
-
Attach any images relevant to question 10 here.
-
11) During manual handling activities, are ground conditions appropriate and is good visibility maintained at all times?
-
Comments:
-
Attach any images relevant to question 11 here.
Vibration
-
1) Are risk assessments carried out and do they include the use of vibrating equipment and the precautions to be taken to reduce the risk?
-
Comments:
-
Attach any images relevant to question 1 here.
-
2) Have individuals who use vibrating equipment been identified if so:- have they been informed of the associated risk?
-
Comments:
-
Attach any images relevant to question 2 here.
-
3) Is new equipment assessed prior to purchase?<br>a) If so are these assessments used as a selection criterion?
-
Comments:
-
Attach any images relevant to question 3 here.
-
4) Is new equipment purchased in line with a company standard?
-
Comments:
-
Attach any images relevant to question 4 here.
-
5) Does the purchase policy take account of vibration along with other health & safety issued?<br>a) And does the equipment comply with British and European Standards?
-
Comments:
-
Attach any images relevant to question 5 here.
-
6) Is current equipment maintained according to manufacturers instructions and are records of maintenance retained and available?
-
Comments:
-
Attach any images relevant to question 6 here.
-
7) Is the equipment that is hires of a similar specification to that which is purchased and are checks carried out to ensure that the equipment meets the required specification?
-
Comments:
-
Attach any images relevant to question 7 here.
-
8) Is work with vibrating equipment limited as far as reasonably practicable?
-
Comments:
-
Attach any images relevant to question 8 here.
-
9) Where the potential exists for exposure limits could be exceeded, have measures been put in place to ensure adequate rest periods between operating vibrating equipment?
-
Comments:
-
Attach any images relevant to question 9 here.
-
10) Is there a Health Surveillance program from monitoring exposure to vibration?<br>a) If so has an annual HAV's vibration questionnaire been issued to the relevant employees?<br>b) Are completed questionnaires returned to Occupational Health Adviser (Nurse)?<br>c) And where appropriate is a medical examination undertaken using the Stockholm scale?
-
Comments:
-
Attach any images relevant to question 10 here.
-
11) In order to filter out individuals likely to be susceptible to HAV's, is Health Screening carried out prior to, recruitment, Internal transfer?
-
Comments:
-
Attach any images relevant to question 11 here.
-
12) Where HAV's is diagnosed are managers informed by the Medical Advisor of actions required?<br>a) And of any recommended restrictions for limited exposure implemented?<br>b) Are RIDDOR forms completed and forwarded to the Enforcing Authority?
-
Comments:
-
Attach any images relevant to question 12 here.
-
13) Are employees who use vibrating equipment trained (Vibration Training Package)?<br>a) If so doe the training extend to include their managers?<br>b) Are training records retained?<br>c) Are they kept up to date?<br>d) And is refresher training carried out at three yearly intervals?
-
Comments:
-
Attach any images relevant to question 13 here.
-
14) Are existing and new employees who may be exposed to work involving the use of vibrating equipment made aware of Vibration Management Procedure?<br>a) And the purpose and content of health surveillance programme?
-
Comments:
-
Attach any images relevant to question 14 here.
Noise
-
1) Have all activities / plant which may affect hearing been identified?
-
Comments:
-
Attach any images relevant to question 1 here.
-
2) Have noise assessments for these activities been carried out by a competent person using calibrated equipment and record maintained?
-
Comments:
-
Attach any images relevant to question 2 here.
-
3) Has the information relating to these and the hazard of noise been communicated to the workforce and local residents who may be affected?
-
Comments:
-
Attach any images relevant to question 3 here.
-
4) Could any of the sources of noise be eliminated or reduced?
-
Comments:
-
Attach any images relevant to question 4 here.
-
5) Has suitable hearing protection been provided, it is worn and is it compatible with other items of PPE?
-
Comments:
-
Attach any images relevant to question 5 here.
-
6) Are signs posted in a prominent place to warn of the danger of high noise areas?
-
Comments:
-
Attach any images relevant to question 6 here.
-
7) Are breakers and other plant or machinery fitted with silencers / mufflers?
-
Comments:
-
Attach any images relevant to question 7 here.
-
8) Are barriers erected to reduce the spread of noise?
-
Comments:
-
Attach any images relevant to question 8 here.
-
9) Is work sequenced to minimize the number of people exposed to noise?
-
Comments:
-
Attach any images relevant to question 9 here.
-
10) Are others not involved with the work kept away from noisy areas?
-
Comments:
-
Attach any images relevant to question 10 here.
-
11) Have alternative less noisy activities / plant been considered?
-
Comments:
-
Attach any images relevant to question 11 here.
Sign Off Audit
-
Print Name:
-
Signature:
-
Project Manager Name:
-
Signature:
-
Designation:
-
Select date