Information
-
Site conducted
-
Job Number:
-
Location
-
Conducted on
-
QA Completed By
QA Audit
PRE START CHECKLIST
Site Requirements & Safe Work Method Statement (SWMS)
-
Have you, and any workers of yours if applicable, completed the contractor induction, read and understand the SWMS? Do you have a copy of the relevant SWMS? <br>If there any other hazards not covered in the SWMS, Contact your Manager to report the site specific hazards
Site Conditions
-
Is there safe access to your work area?<br>Have you inspected the site for hazards that could injure you or your workers?
Tools & Equipment
-
Is your electrical equipment in good condition and tested and tagged in accordance to state legislation?<br>Are all guards fitted and in good condition?
Hazardous Substances
INSTALLER QA AUDIT
Benchtops
STONE QA
-
W/fall ends matched, smooth & even mitre?
-
Send photo Join Flat and colour matched to top
-
Overhangs parallel & even?
-
Check oven gap = 2.5mm/slide?
-
Hotplate / sink / basins check fit?
GLASS QA
-
Wall surface smooth & clean?<br>Removed excess silicone?<br>Clear spacers used?
GENERAL QA
-
Remove residue, clean surfaces?<br>Remove all rubbish & offcuts?<br>Silicon seal all edges along adjoining cabinetry & stone? Use NO MORE GAPS to seal to plaster walls?
OVERALL QA PHOTOS
-
Take photos of all Stone works to complete the quality audit
-
Notes / Comments / Details of REWORK carried out on site or issues to be resolved
SIGN OFF
-
Installer completion details
-
I / we acknowledge the satisfaction completion of the installation and that final balance is now due and payable.