Information
-
Job Number:
-
Location
-
Conducted on
-
QA Completed By
QA Audit
PRE START CHECKLIST
Site Requirements & Safe Work Method Statement (SWMS)
-
Have you completed the contractor induction, read and understand the SWMS?
-
If you have any workers, have they completed the contractor induction, read and understand the SWMS?
-
Do you agree you are not permitted to perform high risk work on site?
-
It is a mandatory requirement the any onsite cutting that is performed, must be in accordance with the Marbut Stone wet cutting policy.<br>There is a zero tolerance of dry cutting methods onsite!
-
Do you have a copy of the relevant SWMS?
-
Are there any other hazards not covered in the SWMS? (Contact your Manager to report the site specific hazards)
Site Conditions
-
Have you read the projects site specific coordination plan, taking note of specific hazards?
-
Is there safe access to your work area?
-
Have you inspected the site for hazards that could injure you or your workers?
-
Amenities available and in reasonable condition, first aid kit in vehicle and emergency information current?
-
Stairwells including temporary stairs are in place and secure, stairs have clear access and no step greater than 190mm?
Tools & Equipment
-
Is your electrical equipment in good condition and tested and tagged in accordance to state legislation?
-
Are you fully equipped to perform wet cutting onsite as per the Marbut Stone wet cutting policy?<br>
-
Are all guards fitted and in good condition?
-
Is your P2 mask in good working condition, filter changed regularly and is worn every-time you perform a wet cut onsite!
-
Do you and your workers have the right PPE and safety equipment?
Hazardous Substances
-
Do you have your MSDS register with you?
-
Installer Name:
INSTALLER QA AUDIT
Benchtops
-
Under mount cutout rebated + tap hole drilled?
STONE QA
-
W/fall ends matched, smooth & even mitre? Ends 3mm max off floor
-
Take photo of Joins - tight & flush
-
Cabinetry level, square & secure?
-
Join colour matched to top?
-
Overhangs parallel & even?
-
Check door/drawer clearances?
-
Check oven gap = 2.5mm/slide?
-
Hotplate / sink / basins check fit?
-
Remove all dust from hinges?
-
Check arris size 2-2.5mm
-
Keep-off sticker on each top?
GLASS QA
-
Wall surface smooth & clean?
-
Clean any excess silicon?
-
Clear 3mm spacers used?
-
Non-acidic silicon has been used?
GENERAL QA
-
Remove residue, clean surfaces?
-
Check for any defect / chips?
-
Remove all rubbish & offcuts?
-
Silicon seal all edges along adjoining cabinetry & stone?
-
Use NO MORE GAPS to seal to plaster walls?
OVERALL QA PHOTOS
-
Take photos of all Stone works to complete the quality audit
-
Notes / Comments / Details of REWORK carried out on site or issues to be resolved
CUSTOMER SIGN OFF (Private jobs only)
-
Designated 2 hour time slot:
-
Installer completion details
-
I / we acknowledge the satisfaction completion of the installation and that final balance is now due and payable.