Information

  • Job Number:

  • Location
  • Conducted on

  • QA Completed By

QA Audit

PRE START CHECKLIST

Site Requirements & Safe Work Method Statement (SWMS)

  • Have you completed the contractor induction, read and understand the SWMS?

  • If you have any workers, have they completed the contractor induction, read and understand the SWMS?

  • Do you agree you are not permitted to perform high risk work on site?

  • It is a mandatory requirement the any onsite cutting that is performed, must be in accordance with the Marbut Stone wet cutting policy.<br>There is a zero tolerance of dry cutting methods onsite!

  • Do you have a copy of the relevant SWMS?

  • Are there any other hazards not covered in the SWMS? (Contact your Manager to report the site specific hazards)

Site Conditions

  • Have you read the projects site specific coordination plan, taking note of specific hazards?

  • Is there safe access to your work area?

  • Have you inspected the site for hazards that could injure you or your workers?

  • Amenities available and in reasonable condition, first aid kit in vehicle and emergency information current?

  • Stairwells including temporary stairs are in place and secure, stairs have clear access and no step greater than 190mm?

Tools & Equipment

  • Is your electrical equipment in good condition and tested and tagged in accordance to state legislation?

  • Are you fully equipped to perform wet cutting onsite as per the Marbut Stone wet cutting policy?<br>

  • Are all guards fitted and in good condition?

  • Is your P2 mask in good working condition, filter changed regularly and is worn every-time you perform a wet cut onsite!

  • Do you and your workers have the right PPE and safety equipment?

Hazardous Substances

  • Do you have your MSDS register with you?

  • Installer Name:

INSTALLER QA AUDIT

Benchtops

  • Under mount cutout rebated + tap hole drilled?

STONE QA

  • W/fall ends matched, smooth & even mitre? Ends 3mm max off floor

  • Take photo of Joins - tight & flush

  • Cabinetry level, square & secure?

  • Join colour matched to top?

  • Overhangs parallel & even?

  • Check door/drawer clearances?

  • Check oven gap = 2.5mm/slide?

  • Hotplate / sink / basins check fit?

  • Remove all dust from hinges?

  • Check arris size 2-2.5mm

  • Keep-off sticker on each top?

GLASS QA

  • Wall surface smooth & clean?

  • Clean any excess silicon?

  • Clear 3mm spacers used?

  • Non-acidic silicon has been used?

GENERAL QA

  • Remove residue, clean surfaces?

  • Check for any defect / chips?

  • Remove all rubbish & offcuts?

  • Silicon seal all edges along adjoining cabinetry & stone?

  • Use NO MORE GAPS to seal to plaster walls?

OVERALL QA PHOTOS

  • Take photos of all Stone works to complete the quality audit

  • Notes / Comments / Details of REWORK carried out on site or issues to be resolved

CUSTOMER SIGN OFF (Private jobs only)

  • Designated 2 hour time slot:

  • Installer completion details

  • I / we acknowledge the satisfaction completion of the installation and that final balance is now due and payable.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.