Information
-
Job Number:
-
Address:
-
Installers Name
-
QA Completed By
-
Conducted on
-
THIS QA CHECKLIST IS TO BE COMPLETED IN CONJUNCTION WITH THE INSTALLAUS INSTALLATION GUIDELINES
Qa Rooms
-
Enter room name
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
Benchtops
-
Are all bench tops free of damage
-
Are all benchtops no more gaped to walls?
-
Cutouts are free of chips and cutout square
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Oven space or void as per job specifications, with oven rails set correctly
-
Cutouts for Sinks, Basin and Cook tops are as per job specifications
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Attention Installation Scheduler
-
Is there any Notes for installer to be aware of?
-
All notes entered here will appear on the installers report
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
Benchtops
-
Are all bench tops free of damage
-
Are all benchtops no more gaped to walls?
-
Cutouts are free of chips and cutout square
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Oven space or void as per job specifications, with oven rails set correctly
-
Cutouts for Sinks, Basin and Cook tops are as per job specifications
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Attention Installation Scheduler
-
Is there any Notes for installer to be aware of?
-
All notes entered here will appear on the installers report
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
Benchtops
-
Are all bench tops free of damage
-
Are all benchtops no more gaped to walls?
-
Cutouts are free of chips and cutout square
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Oven space or void as per job specifications, with oven rails set correctly
-
Cutouts for Sinks, Basin and Cook tops are as per job specifications
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Attention Installation Scheduler
-
Is there any Notes for installer to be aware of?
-
All notes entered here will appear on the installers report
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
Benchtops
-
Are all bench tops free of damage
-
Are all benchtops no more gaped to walls?
-
Cutouts are free of chips and cutout square
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Oven space or void as per job specifications, with oven rails set correctly
-
Cutouts for Sinks, Basin and Cook tops are as per job specifications
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Attention Installation Scheduler
-
Is there any Notes for installer to be aware of?
-
All notes entered here will appear on the installers report
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
Benchtops
-
Are all bench tops free of damage
-
Are all benchtops no more gaped to walls?
-
Cutouts are free of chips and cutout square
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Oven space or void as per job specifications, with oven rails set correctly
-
Cutouts for Sinks, Basin and Cook tops are as per job specifications
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Attention Installation Scheduler
-
Is there any Notes for installer to be aware of?
-
All notes entered here will appear on the installers report
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
Benchtops
-
Are all bench tops free of damage
-
Are all benchtops no more gaped to walls?
-
Cutouts are free of chips and cutout square
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Oven space or void as per job specifications, with oven rails set correctly
-
Cutouts for Sinks, Basin and Cook tops are as per job specifications
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any Notes for installer to be aware of?
-
All notes entered here will appear on the installers report
-
Attention Installation Scheduler
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
Benchtops
-
Are all bench tops free of damage
-
Are all benchtops no more gaped to walls?
-
Cutouts are free of chips and cutout square
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Oven space or void as per job specifications, with oven rails set correctly
-
Cutouts for Sinks, Basin and Cook tops are as per job specifications
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any Notes for installer to be aware of?
-
All notes entered here will appear on the installers report
-
Attention Installation Scheduler
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
Benchtops
-
Are all bench tops free of damage
-
Are all benchtops no more gaped to walls?
-
Cutouts are free of chips and cutout square
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Oven space or void as per job specifications, with oven rails set correctly
-
Cutouts for Sinks, Basin and Cook tops are as per job specifications
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any Notes for installer to be aware of?
-
All notes entered here will appear on the installers report
-
Attention Installation Scheduler
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Completed
-
It is important that the information you have provided is complete and correct. Please confirm that all information required has been entered.
-
Is the job Pass or Fail
-
Total travel time for any maintenance's if applicable
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Please provide any other information that would be useful.
-
Please sign before submitting this form
-
Thankyou