Title Page

  • Site Conducting Inspection

  • Date

  • Health & Safety Advisor

  • Contracts Manager / Director

  • M&J Site Supervisor / Manager

M&J Evans Construction Ltd Site Inspection

  • INSTRUCTIONS
    ----------------------
    1. Please answer all the questions below.
    2. Add photos and notes by clicking on the paperclip icon
    3. To add a Corrective Action click on the paperclip icon then "Add Action," provide a description, assign to a member, set priority, and due date
    4. Complete Inspection by providing digital signature
    5. Share your report by exporting as PDF, Word, Excel or Web Link

Site Folder Compliance

  • Health and safety law poster in on display with correct names.

  • Health and safety policy is in date and on display.

  • Insurance policy is in date and on display.

  • F10 is on display.

  • Weekly supervisor site checks have been completed.

  • DABs have been briefed.

  • Site attendance register is completed.

  • Inductions completed and up to date.

  • Contracts managers requirements have been completed.

  • Risk assessments are within review date in the non-working folder.

  • Method statements are within review date in the non-working folder.

Training And Toolbox Talks

  • Newest tool box talks have been delivered and signed.

  • Safety alerts are on display.

  • Copy of training certificates are on site.

  • Training matrix has been checked and is up to date.

Emergency Provisions / First Aid / Fire Safety

  • First aider signage on display with correct names.

  • Emergency contacts is up to date and displayed and a copy in the site folder.

  • Fire safety plan is in date and on display.

  • Nearest hospital route is display.

  • Accident report book is Available.

  • First aid kit is in date and available.

  • Burns kit available.

  • Eye wash is in date and available.

  • Eye wash station

  • Eye wash pods

  • Fire extinguishers is in date and available and put together correctly.

Occupational Health

  • Manual handling assessments have been completed for each activity.

  • H.A.V.S are recorded and up to date.

  • Permit to Cut as been completed and in date.

Temporary Works Needs Completing

Personal Protective Equipment

  • Hi Viz clothing.

  • No Knots

  • No Rips

  • No Reflective Missing

  • Safety boots.

  • No rips

  • No broken laces

  • Hard hats.

  • Damage free

  • No Writing (Marker Pen)

  • Eye protection.

  • B ratio for Work

  • F ratio for walk around

  • Ear protection.

  • Disposable ear plugs

  • Corded or banded ear plugs

  • Earmuffs (Ear Defenders)

  • Dust masks.

  • FFP3 Mask

  • Half Mask

  • Air shield pro

  • Flame retardant.

  • Overalls

  • Top and trousers

  • Gloves

Welfare Facilities

  • Canteen.

  • Seats and tables

  • Kettle

  • Microwave

  • Hot water

  • Drinking water

  • Clean and tidy

  • Toilets.

  • DABS hand station

  • Hand towels

  • Hot water

  • Toilet roll

  • Clean and tidy

  • Drying room.

  • Seating

  • Heaters

  • Clean and tidy

  • Site office is clean and tidy.

Traffic Management

  • Magnetic traffic management plan is on display.

  • Segregated parking area with signage.

  • Signage

  • Segregated pedestrian routes.

  • Pods

  • Crossing Points

  • Heras panels

  • Pedestrians Barriers

  • Chain Link

  • Double clipped

  • Signage

  • Delivery holding point At the main gate..

  • Bankman / Traffic marshal available.

  • Signage

  • Exclusions zones in place.

  • Heras Panels

  • Doubled clipped

  • Signage

Lifting Equipment

  • Lifting inspection tags visible and completed.

  • Lifting plans available in the non-working folder.

  • Folk attachments have been tested and tagged.

  • Snatch chains have been tested and tagged.

  • Lifting equipment hangers are in the storage container and used.

  • Equipment logs are completed and up to date.

Environmental Controls

  • COSHH cabinet is in place and being used in the store container.

  • COSHH Bunded Pallet is in place and being used in the store container.

  • Plant nappies are available and used.

  • Spill kits are available and used.

  • Silt mitigation is in place. ( Silt Barrier )

  • Gully bags are available and used.

  • Water courses identified and Segregated.

  • Heras panels

  • Doubled clipped

  • Signage

  • Tree Preservation order areas Segregated.

  • Heras panels

  • Doubled clipped

  • Signage

  • Drawings available

  • Waste areas Segregated.

  • Heras panels

  • Doubled clipped

  • Signage

  • Clean and tidy

  • Noise control measures are in place. ( Baffled boards )

  • Dust control measures are in place.

  • Water bowser

  • Road sweeper

  • Mist canon

  • Dust suppression bottle

  • Gravity fed water suppression bottle

  • Battery powered water bottle

  • Ecology habitats are protected.

  • Heras panels

  • Doubled clipped

  • Signage

Public Protection

  • Site perimeter fence secure.

  • Heras panels

  • Hording

  • Doubled clipped

  • Signage

  • Manhole lids.

  • Protected

  • Screwed down

  • Visible

  • Materials and tools segregated.

  • Pedestrian barriers

  • Signage

  • Warning Signage in place for upcoming works.

  • Haunching of service boxes and iron works.

  • Letter drops to local residents informed of our works.

  • Security Daleks used.

Mobile Plant

  • Daily Plant checks are being completed for all plant.

  • PUWER inspection have been carried out.

  • Thumbs up stickers are visible on all Plant.

  • Quick Hitch Log has been completed and up to date.

  • Roll over protection system in good condition.

  • Seatbelts are in good working order and used.

  • Beacons in working order. ( Work ( Orange ) / Seat belt ( Green ) )

  • Plant damage / defects have been Recorded on daily plant checks and Reported via QR code / Email / Phone.

  • Plant topography chart available.

Confined Space Needs Completing

Excavations

  • Permit to dig has been completed and in date with drawing.

  • Edge protection.

  • Heras panels

  • Pedestrians Barriers

  • Doubled clipped

  • Signage

  • Safe access and egress.

  • Ladder

  • Slope

  • Safe digging is being carried out with banksman.

  • Safe excavations.

  • Stepped

  • Sloped

  • Supports

  • Trench box

  • Excavation inspection Reports

  • Breaking ground procedures is on site.

Buried Services / Water / Gas / Electric / BT / Fibre / Cable

  • Cat & Gen is available on site, within calibration and frequently used.

  • Genny has the correct attachments.

  • Service drawings are available and in date.

  • Permit to dig has been completed and within date.

  • Reinstatement of sand has been used and at the correct levels.

  • Marker tape has been used.

  • Goal posts are used and in place.

  • Trail hole records are complete and up to date.

  • Insulated hand tools are being used.

M&J Evans Visual Standards

  • Refuelling area.

  • Bunded

  • Heras Panels

  • Doubled clipped

  • Signage

  • Spill kit

  • Fire extinguisher

  • Clean and tidy

  • Secure

  • Mixing area.

  • Heras panels

  • Pedestrians Barriers

  • Doubled clipped

  • Stop blocks

  • Waste area

  • Signage

  • Clean and tidy

  • Bucket changing area.

  • Heras panels

  • Pedestrians Barriers

  • Doubled clipped

  • Signage

  • Clean and tidy

  • Satellite bucket changing area.

  • Pedestrians Barriers

  • Doubled clipped

  • Signage

  • Clean and tidy

  • Segregated aggregate materials.

  • Heras panels

  • Doubled clipped

  • Signage

  • Clean and tidy

  • Site office is clean and tidy.

  • Store container is clean and tidy.

  • Good signs of housekeeping in the M&J exclusions zones.

Street Works

  • Highways England permit.

  • Duration of permit

  • Notification signage

  • Public Protection.

  • Notification of works

  • Letter drops

  • Walk ways

  • Crossing points

  • Signage

  • Traffic Management.

  • Traffic management plan

  • Road diversion

  • Works access

  • Traffic signals

  • Signage

  • Pedestrian barriers

  • Road plates

  • Plant.

  • Road legal dumpers

  • Road sweepers

  • Service Survey / Drawings.

  • Water

  • Gas

  • Electric

  • Fibre

  • BT

  • Cable

  • Materials storage Area.

  • Secure

  • Heras panels

  • Doubled clipped

  • Signage

  • Reinstatement.

  • Sand

  • Marker tape

  • Tarmac

Additional Information

Additional Details

  • Comment

  • Copy of Safety Inspection upload onto Server and emailed to Site Manager / Contracts Manager / Directors / Health & Safety Team

Completion

  • Site Inspection Signed Off By : (Name)

  • All sites will start with 100% and be marked down accordingly where failure to adhere to current UK Legislation or Guidance has been found. The scoring will also reflect if failure to adhere to M&J internal policies, procedures and requirements under the visual standards have not been carried out

  • By selecting 'N/A' in the sections of this report, it does not mean that the specified sections are not in place it simply states that the specified area was not checked or observed throughout this visit for this report.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.