Information

  • Inspection No.

  • Job location and Job number

  • Client / Site

  • Conducted on

  • Location

Construction phase plan and risk assessment communication

  • Prepared by Team Leader

  • Does the construction phase plan/risk assessment cover the build remit.

  • Stop marquee erection and contact head office to advise that the CPP and RA are not correct for the site and to obtain permission to proceed

  • Site Marquee team leader to communicate and record toolbox talk on CCP and RA for the marquee erection to the erection team
    Add a signature element for each erector present. If erection takes place over several days and different process add the individuals as required.
  • Click to enter Names of those present.

  • Signature

  • Other personnel on site
  • Name / Company

  • Add signature

Pre-construction checks

  • Check ground conditions - note if ground is soft or hard, soft ground conditions would be if a standard stake driven into the ground with 6" exposed can be moved physically without the aid of tools. If so more stakes than normal or longer stakes than normal and spreader plates under main uprights may be required. Any additional such measures should be noted.

  • Check ground conditions - note if ground is soft or hard, soft ground conditions would be if a standard stake driven into the ground with 6" exposed can be moved physically without the aid of tools. If so more stakes than normal or longer stakes than normal and spreader plates under main uprights may be required. Any additional such measures should be noted.

  • Tap to enter information

  • Any further infomation

  • Enter corrective action taken

  • Has the area been marked out for service lines and checked for underground hazards e.g. electricity cables, water services, gas services

  • Mark out services as instructed using CAT for the erection area and identify electricity, water and gas

  • Are all aspects of the final structure at a safe distance from overhead hazards? electricity supply lines, tall trees and overhangs. if no contact head office for direction to proceed.

  • Detail the corrective actions taken to reach a satisfactory outcome to permit erection.

  • Team leader sign off that actions have been taken.

Onsite Communications

  • Check that communication procedures are in place and available e.g. mobile phone, land line.

  • Record here and communicate any special procedures needed e.g emergency procedures. while working on site.

PPE Check

  • Are all staff wearing safety footwear. If no, Limit the staff member to work not where the PPE is not required and advise head office.

  • Are all staff wearing safety high visibility vest / jacket. If no, Limit the staff member to work not where the PPE is not required and advise head office.

  • Are all staff wearing safety hard hat. If no, Limit the staff member to work not where the PPE is not required and advise head office.

  • Are all staff wearing safety Company workware. If no, Limit the staff member to work not where the PPE is not required and advise head office.

  • All staff have wearing safety wet weather clothing. If no, Limit the staff member to work not where the PPE is not required and advise head office.

  • All staff have access to sun block. If no, Limit the staff member to work not where the PPE is not required and advise head office.

  • Body harness and fall arrest equipment available. If no, Limit the staff member to work not where the PPE is not required and advise head office.

Ladder inspection

  • Identify the ladders, step ladders, hop ups being used.

  • Are there any damaged, loose or missing parts?

  • Rubber feet

  • Identify defective equipment

  • Rungs bent

  • Identify defective equipment

  • Missing rivets or rung securing mechanism

  • Identify defective equipment

  • Damaged hop up/ step ladder mechanisum

  • Identify defective equipment

  • Add any other hazard info found on the equipment
  • Identify defective equipment

  • Defect

Set up and Organising the site

  • Have all signs and perimeter marking been erected around the work area and hazards and public access to the construction area prevented? if no Ensure all access areas to the work areas is restricted to authorised persons only.

  • Are all the items on the load been delivered and are suitable for the construction of the marquee?

  • List missing items or unusable or unserviceable
  • Item Description

Marquee frame and stability

  • Select team leader carrying out inspection

  • team leaders name
  • team leaders name

  • Are all bracing wire / beams on roof and walls in place and adequately tensioned. <br>If no retention and confirm bracing and beam tensions.

  • Action taken to recitfy

  • Are all anchorages suitable for the purpose and soil condition and are holding fast. If no review the anchorage type and method, replace or rectify anchorage point.<br>Add info as required.

  • Action taken to recitfy

  • Are all ropes including wire ropes sound? if no replace defective ropes and wire ropes where required. Report defective equipment.<br>Add info as required.<br>

  • Action taken to recitfy

  • Confirm that fabric is tensioned and not prone to ponding. If no retention fabric to remove slack and potential ponding. Add info as required.

  • Action taken to recitfy

  • Are all locking pins, bolts and R clips in place and secure. If No secure any defective pins, bolts and R clips as required. Add info as required.

  • Action taken to recitfy

  • Action taken to recitfy

  • Are all walls securely pegged and / or secured? If no secure any walls by pegging as required. Add info as needed.

  • Action taken to recitfy

  • There is no excessive weights suspended from the roof beams, ridges etc. I no Remove and distribute any items suspended or remove completely from the beams, ridges etc. Add any info as needed.

  • Add signature

  • Select date

Finished Marquee Inspection

  • Select team leader carrying out inspection

  • team leaders name
  • team leaders name

  • Are all escape routes clear of obstructions and doors are operating correctly? If no remove any obstructions. Replace/repair door if not operating correctly. Report on defects log

  • Action taken to recitfy

  • Are all access and egress points where ropes and anchorages are located sufficiently highlighted? If no highlight access and egress hazards.

  • Action taken to recitfy

  • Are there any unprepared tears in the fabric? If no replace the section of fabric with a suitable replacement. Report the defective item on the defects log.

  • Action taken to recitfy

  • If relevant is the flooring evenly laid with no tripping points? If no rectify the flooring so that it’s evenly laid.

  • Action taken to recitfy

  • If relevant is the floor covering ie carpeting and other floor coverings securely fixed so as to minimise the risk of tripping? if no Rectify the carpeting/floor coverings to prevent a tripping hazard.

  • Action taken to recitfy

  • If relevant are roof linings at a sufficient height so as not to drop below eaves? If no rectify the roof linings to prevent them dropping below eave height.

  • Action taken to recitfy

  • Visual check to confirm that the tent is erected securely? if no rectify the error before signing off.

  • Action taken to recitfy

  • Site Manager sign off as conformation the above have been checked.

  • Tap to enter date

Site sundry instalations

  • Select team leader carrying out inspection

  • team leaders name
  • team leaders name

  • Confirm the following items have been installed according to Pre Construction information

  • Other items supplied by marquee company

  • Add signature

  • Confirm all subcontract materials have been installed according to Pre Construction information

  • Other items supplied by subcontract company

  • Site Manager to sign off as complete

Defect log

    Enter details of defective items
  • Defect - email to head office, add photo as required

Sign off installation complete

  • Client has been informed of how to use the generator, heater, dimmer etc? (Not required if not installed)

  • Site clean and tidy before handover

  • Marquee clean and tidy

  • Are all items as requested?

  • Customer sign off

  • Notes

  • Marquee team leader sign off

  • Notes

  • Enter date and time

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.