Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Untitled Page

  • Project Name:

Mascott QCC-Metal Decking

  • Sub-Contractor:

  • Relevant Drawing’s:-

  • Temporary works required (Please Indicate)

  • YesIf Yes Please attach Temp works sheet

  • Area/Location:

  • Sub-Contractor

  • Thickness of decking

  • Are top of contact services (beams) clean of paint and rust?

  • Fixings. Are sheets attached correctly?

  • Sheet overlap width

  • Are side laps correctly secured?

  • Are spans and ends of sheets correct?

Concreting

  • propping required

  • end/service openings closed?

  • check edge trim line and support?

  • studs welded as per drawing no -

  • mesh laid as per drawing

  • U bars tied to mesh

  • Expansion joint Fitted

  • Concrete Poured and finished to specification

The above works have been inspected and : -

  • Are to an acceptable standard of quality

  • Are to an acceptable standard of quality

  • Are to an acceptable standard of quality subject to the comments below

  • Are not to an acceptable standard of quality

  • Signed on Behalf of MCE

  • Date:

  • Signed on Behalf of Client :

  • Signed on Behalf of SubContractor :

  • Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.