Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Policies, Insurances & Documentation

  • Is a current health and safety policy in place?

  • Mastacab must have an up to date Health & Safety policy, this policy is to be reviewed by Eyton & Mastacab annually. The current version should be displayed in a prominent position (e.g. notice board) so that all employees have access as well as within ''Policies & Procedures'' folder on SharePoint.

  • Does the organisation hold all relevant insurances which are displayed appropriately?

  • All relevant insurances must be held, evidence of Employers & Public liability insurance should be displayed on the notice board and stored within the ''Insurances & Memberships'' folder on SharePoint. These insurances need to be renewed annually.

  • Has a fire risk assessment of the premises been undertaken?

  • A fire risk assessment is a legal requirements, once undertaken the fire risk assessment should be reviewed annually. A new fire risk assessment may need to be undertaken depending on the review findings.

Emergency & Reporting Procedures

  • Is there an accident book on site and are the operatives aware of the location?

  • Legal requirement to record & investigate all accidents, an accident book should be available for all persons to use and investigation reports should be kept on SharePoint under the ''Accidents, Incidents, Near-miss'' tab''.

Inductions

  • Is there a company / site induction in place and have all persons been inducted with signatures recorded as evidence of receipt and understanding?

  • Does the organisation re-induct personnel after a period of time?

  • Does the organisation re-induct personnel after a period of time?

  • Mastacab must induct all persons prior to the commencement of works, during this process signatures must be recorded to evidence receipt & understanding then re-induct every 3-5 years. Records of inductions should be kept within the individuals profile on SharePoint ''Personnel''.

RAMS, Training & Equipment

  • Have risk assessments been undertaken, documented and communicated with signatures recorded as evidence of receipt and understanding?

  • Have the risk assessments been reviewed inline with their review date?

  • Have the risk assessments been reviewed inline with their review date?

  • Each work activity must legally be risk assessed, risk assessments must be documented if a company employs 5 or more. Each risk assessment must be communicated to the relevant persons with signatures recorded as evidence of receipt and understanding. Records of communication should be stored under their ''Personnel'' file on SharePoint.

  • Have safe working procedures been established and communicated with signatures recorded as evidence of receipt and understanding?

  • Have the safe working procedures been reviewed inline with their review date?

  • Have the safe working procedures been reviewed inline with their review date?

  • Spot check working practices - is the work being undertaken in line with company risk assessments at method statements?

  • Is the operative trained and competent in the task that they are undertaking?

  • Has formal training been delivered for the tasks undertaken (e.g. Abrasive wheel training for operative using a grinder, manual handling training for operative lifting a load). Evidence should be stored on SharePoint in the ''Training Matrix''.

  • Is the correct equipment available for the task and is it being used correctly?

Training

  • Has a training matrix been developed and maintained identifying all training requirements?

  • A matrix has been developed on SharePoint, the training must be kept up to date to ensure each operative is competent.

  • Have shortfalls in training been identified?

  • Review the training matrix, has any training expired which is still required or is it closing to expiry? If so a course should be organised to rectify the shortfall.

Traffic Management

  • Has a traffic management plan been established and communicated to all relevant persons upon arrival?

  • A documented traffic management plan should be in place, due to the size and layout of site this would only be small (yet to be developed) - Traffic management controls have been implemented (Speed limit identified etc.)

  • Are banksmen required?

  • Are competent banksmen being used where necessary?

  • Banksman training can be delivered to help mitigate the risk of collision whilst performing vehicle manoeuvres on site.

Welfare Facilities & First Aid

  • Have suitable and sufficient welfare facilities been made available for all persons on site?

  • Have the welfare facilities which have been provided been kept in good clean condition ready for use?

  • Have the welfare facilities which have been provided been kept in good clean condition ready for use?

  • Welfare facilities should include the right number of toilets and washbasins, drinking water and having somewhere to rest and eat meals. A healthy working environment – a clean workplace with a reasonable working temperature, good ventilation, suitable lighting and the right amount of space and seating.

  • Has a smoking area been established and is there suitable signage in place?

  • Is there suitable and sufficient first-aid provisions available on site?

  • Fully stocked first-aid boxes should be available on site, the contents of these boxes must be in date. There must also be at least one first-aid trained person on site at all times (additional training is required).

  • Is there a method in place for identifying first-aiders on site?

  • For means of identifying first-aiders photos are usually displayed on the notice board.

Mobile Plant & Test Certification

  • At the time of inspection is any mobile plant being used by the client?

  • Is there a pre-start checklist available and has it been completed?

  • A recorded pre-start check of each vehicle / mobile plant must be undertaken with records retained. If defects have been identified these should be reported immediately and the item not used until the defect has been rectified.

  • Does the mobile plant hold a current record of thorough examination and is evidence available?

  • Does the equipment hold current record of thorough examination e.g. LOLER (Lifting Operations & Lifting Equipment Regulations). Lifting equipment which lifts / secures persons must undergo thorough examination every 6 months, lifting equipment that only lifts inanimate objects must undergo thorough examination every 12 months.

  • Have all keys been removed from mobile plant if the operator is not present?

  • Are seatbelts fitted, if so was it seen to be in use?

Static Plant

  • Is suitable and sufficient guarding in place to prevent unauthorised access to potentially dangerous areas and/or components?

  • Under PUWER Regulations (Provision & Use of Work Equipment) Suitable and sufficient guarding must be installed to preventing contact with components with the potential to cause harm.

  • Is the plant installed with functioning E-stops which are appropriately located?

  • Under PUWER Regulations (Provision & Use of Work Equipment) each piece of powered equipment must be fitted with a suitably located functionign emergency stop.

  • Is there a pre-start checklist available and has it been completed?

  • Pre-start checklist should be in place for each piece of fixed powered equipment (e.g. pillar drill). Records of these checks should be retained and defects should be rectified prior to use.

  • Has an electrical isolation procedure been created for cleaning & maintenance tasks?

  • Has isolation been undertaken in line with this procedure and has isolation been successful?

  • There should be an electrical isolation procedure in place, then means of isolated (e.g. padlock on isolator) provided. Maintenance tasks should not take place on any equipment prior to the power source being isolated.

Hand held & Power tools

  • Are hand held tools being used?

  • Do all hand tools appear to be in good condition with no apparent defects?

  • Are power tool being used?

  • Do all power tools appear to be in good condition with no apparent defects?

  • Are all attachments without significant wear and effective? (e.g. drill bits, blades, discs).

  • Is extraction required to mitigate the risk of dust exposure (e.g. Circular saw)

  • Had suitable and sufficient extraction been installed as required?

  • All LEV (local exhaust ventilation / Extraction) must be inspected / serviced by a competent person at least once every 14 months.

PPE / RPE

  • Have PPE requirements been identified and have they been enforced?

  • Was PPE worn seen to be in good condition?

  • Is RPE required as part of the works being undertaken?

  • Is correct RPE being worn correctly and is it well maintained?

  • Is face fit testing required for the RPE in use?

  • Has face fit testing been carried out to ensure that the RPE in use is suitable for the user?

  • A half face mask with an FFP3 filter should be worn for all activities which are likely to cause airborne dust. Face fit testing must be undertaken to ensure that the mask worn is suitable for the user. Face fit testing must be undertaken once every two years or if there are any changes to the structure of the users face.

Signage

  • Has suitable and sufficient signage been displayed across site?

  • Signage should be displayed across site in prominent positions.
    There are 4 different types of signage:
    Red = Prohibition (e.g. Dangerous Behaviour, Stop)
    Yellow = Warning (e.g. Live Electrics, Wet Floor, Danger)
    Blue = Mandatory (e.g. PPE)
    Green = Safety (e.g. First-aid, Fire Escape)

Working at Height

  • Are working at height activities being undertaken?

  • Is the correct access equipment being used and is there evidence of current inspection?

  • Is fall arrest / restraint equipment required for the works being undertaken?

  • Was the operative(s) seen to be wearing required fall arrest / restraint equipment and was they able to evidence a current record of thorough examination?

  • Fall arrest / restraint equipment should undergo thorough examination every 6 months with records retained on SharePoint & the user should conduct a pre-use checks before each use. If defects are identified the item must be destroyed.

  • Was the work at height being undertaken from a fixed work platform?

  • Had the work platform been fitted with suitable and sufficient edge protection to protect against falls?

  • Is there good means of access / egress to the work area / platform?

Lifting Plan & Equipment

  • Are lifting operations carried out as part of the works being undertaken?

  • Is there a lifting plan in place which covers this activity?

  • There is a lifting plan in place for container movements.

  • Is the lifting equipment suitable for the works being undertaken and is there a record of thorough examination available?

  • Is the equipment used that which is detailed within the RAMS (Risk Assessment Method Statement) & the lifting plan?

CoSHH

  • Has all COSHH been bunded / stored as required when not in use?

  • If CoSHH (Control of Substances Hazardous to Health) Substances have been stored on a bund the bund must be able to contain at least 110% of the largest container stored. Chemicals must be stored within their original containers with all labels legible.

  • Have CoSHH Assessments been completed and communicated to the relevant persons?

  • CoSHH assessments should be undertaken for each substance on site, these assessments should be communicated to all relevant persons with signatures recorded as evidence of receipt and understanding then stored within the ''Personnel'' file on SharePoint.

Environmental

  • Is the site free from odour emitting from site?

  • Is the site free from any noise emitting from site?

  • Is any litter controlled on and off site?

  • Are the internal and external roads clear from mud & debris caused as a result of the companies acts and / or emissions?

  • Are spill kits available and in a suitable location?

  • Is there sufficient pest control on site?

Site Infrastructure

  • Is there evidence that the boiler has been serviced by a competent person within the past 12 months?

  • Are roadways in good condition, fit for purpose with no apparent defects?

  • Have walkways been established and in good condition with suitable segregation in place mitigate the risk of pedestrian to vehicle interactions?

  • Is suitable perimeter fencing in place to prevent unauthorised access to site?

  • Have all walkways, roadways & work areas been adequately lit?

  • Are drains clear and running freely where applicable?

  • Does the overall structure of buildings and units on site appear to be in good condition and unlikely to cause harm?

Electrical Safety

  • Are all extension leads & powered hand tools in good conditon with no apparent defects?

  • Has PAT testing been undertaken with a current record dispalyed (where applicable)?

  • PAT (Portable appliance testing) is not a legal requirement, it is however the easiest way to comply the the requirement to evidence that electrical equipment has been inspected and maintained. This should be undertaken annually.

  • Is the client able to demonstrate a fixed wire certificate provided within the last 5 years?

  • A fixed wire examination must be undertaken every 5 years by a competent electrician. Defects identified should be rectified accordingly.

Housekeeping, Racking & Waste Management

  • Has housekeeping on site been kept to an acceptable standard without any avoidable slip or trip hazards?

  • Is it likely that the operatives are required to clear general dust and / or wood dust?

  • Is a suitable vacuum available for the clearing of dust?

  • Does the client use racking for storage of materials / equipment?

  • Does the racking appear to be in good condition and does the weight stored fall under the safe load limit?

  • Where racking is used it should display a ''safe load limit'' , racking at Mastacab does not display this.

  • How was waste managed on site?

  • A competent third party is used for removal of waste from site.

Site Security

  • Has suitable and sufficient means of site security been established?

  • What security measures are in place (e.g. CCTV, perimeter fencing etc.)

Fire Safety

  • Had means of raising the alarm in the event of a fire been established?

  • How do you raise the alarm in the event of an emergency (e.g airhorn, call point).

  • Had suitable and sufficient means of fire extinguishing media been provided and had it been serviced accordingly?

  • Fire extinguishers should be serviced by a competent third party every 12 months, a report will be provided by the third party which should be stored on SharePoint under ''Fire'' and each extinguisher will have record displayed.

  • Has a muster point been identified and are the operatives aware of the location?

  • Has a muster point been identified for use in the event of an emergency?

Supervision

  • Has adequate competent supervision been made available?

  • Has there been suitable and sufficient training provided to the persons present on site so it can be evidenced that adequate competent supervision is available? (e.g. IOSH Managing safely course completed).

Completion Page

  • Please sign to confirm that all statements made above were accurate at the time of completion.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.