COPPER PIPEWORK AND FITTINGS
-
Drawing No
-
WORK AREA/ROOM
-
SYSTEM
-
Pipework and fittings comply with specification
-
Valves and ancillaries correct types
-
Flexible connections comply with specification
-
Pipework installed to correct levels and falls
-
Pipework secure and adequately supported
-
All anchors, guides and expansion joints fitted
-
Valves and strainers fitted correctly
-
Venting and draining adequate
-
Flexible connections fitted correctly
-
Anti-vibration supports installed
-
Test plugs, pressure gauges and thermometers fitted
-
All servicing valves fitted
-
All joints cleaned and secured
-
Adequate provision for maintenance
-
All control items installed correctly
-
Open ends sealed during installation
-
Pipework tested and witnessed
-
Valves labelled
Completion Sign Off
-
Checked by MBS Signature
-
Name:
Client Sign Off
-
Checked by Client Signature
-
Name: