Title Page

  • Site conducted

  • Floor

  • Block

  • Date

Communal Sign Off

  • Has our containment been completed in its entirety

  • Has all 1st fix power & lighting cabling been completed

  • Has all ELV cabling been completed to apartments

  • Has Non-combustible fixings been used

  • Are the lighting points installed to the correct positions

  • if applicable- are the detectors been installed to the correct locations

  • If applicable- has the apartments mains cables been installed

  • Has all our works been completed allowing close up of ceiling

Signiture

  • Signiture

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.