Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
-
LEVEL:
-
AREA/ROOM:
-
Confirmation that the above ceilings can be closed off. All works have been completed (all snags corrected) and tested as per our Quality Control Procedures
-
Rainwater
-
Drainage
-
Heating
-
Chilled Water
-
Water Services
-
Ductwork
-
Lagging
-
Electrical Containment
-
Electrical Wiring
-
Electrical Accessories
-
Sprinklers
-
Controls/BMS
-
Fire Alarm
-
Security
Malcolm Building Services
-
Supervisor
-
Signed:
Employer
Names:
-
Name:
-
Signed: