Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Inspection
-
Client Representative
-
7 Formation Representative
-
Venue Representative
Store Front
-
Shop front and door decoration
-
Glazing / Condition
-
Door Furniture Correct
-
External keypad for mag lock
-
Key safe
-
Ash tray
-
External alarm box
-
CCTV camera
-
Downpipes and gutters
-
External Signage, Flashing and Backboard
-
External Signage, projecting sign & illumination
-
Window vinyl and door vinyl
-
Tiles to doorway/original cleaned
-
Display monitors installed
-
Is there an External Roller Shutter?
-
External roller shutter working
-
External roller shutter painted
Entrance Lobby
-
Lobby construction
-
Lobby decoration
-
Entrance Lobby lighting
-
Mag log fitted and working
-
Last man out switch
-
Break glass green - mag lock
-
Break glass red - fire alarm
-
Intruder alarm panel
-
Fire alarm panel
-
Fire alarm/zone plan installed
-
Door mat and trims installed
-
Running man sign above door
-
Is there an internal Roller shutter?
-
Internal roller shutter working
-
Internal roller shutter painted
-
Fire extinguishers & signage
-
Other notable items
-
Window Bed Cleaned and Floor Sealed So Ready For TV Install
-
Bingo board / information board
-
Window Access door, flush fitting, 2x Star Keys, no light bleeding through.
-
VM TV Fitted Securely
-
Window illumination - Internal
-
Window & Sign illumination switch controlled and labelled. Usually positioned adj. Mains Board
-
Other Notable Items
Main Store Area
-
Wall construction generally
-
Wall decoration generally
-
Skirting decoration generally
-
Suspend ceiling construction
-
Plasterboard ceiling construction
-
Ceiling decoration
-
Carpet install, joints and edges
-
Doors & architraves, decoration
-
Door locks, handles & hinges
-
Door signage
-
All doors fitted with kick plates
-
Main venue lighting - working
-
Wall uplights - working
-
Electric sockets and dado trunking - working
-
Trunking end caps all on and fitted correctly
-
Multi Gang extension cables onsite, plugged in and working. Also required at Power Poles.
-
Data sockets and trunking - working
-
Air conditioning - working
-
Air conditioning - decoration
-
Ventilation - working
-
Staffguard - installed
-
Playright - installed
-
Fire extinguishers & signage
-
Running man escape signage to rear exit
-
Speaker system - installed & working
-
Wifi - working
-
Other notable Items
Counter Unit
-
Counter joinery & assembly
-
Electric sockets - working
-
Data sockets - working
-
Lighting - Installed & working
-
Fridge - Installed & working
-
Mag lock switch working
-
Panic button installed
-
Tap, sink, drain and macerator - working
-
Water heater installed & working - if applicable
-
Sealant to counter top, sink & vinyl
-
4 x glass shelves installed, Study with 3x brackets installed each & Level
-
Cable management holes x 3 (2x front , 1x in rear)
-
Kensington Lock Fitted
-
Bottom Draw Lock Installed (Concept 2 Only)
-
Fire Blanket Installed To Under Sink Door (Concept 2 Only)
-
Fly Killer Installed (Concept 2 Only)
-
Back Panels Installed Vertically
-
Sun Logo Installed
-
Soap Dispenser Installed
-
Merkur slots counter sticker installed
-
Vinyl flooring and trims installed
-
CCTV monitor installed
-
Light switches working
-
Coffee machine installed and plugged in
-
Oven Installed and plugged in (Not required if Venue has separate catering kitchen)
-
Dishwasher - Installed, working and detergents fitted inc waste pipe hole
-
Other notable Items
Unisex Toilets
-
Ceiling and wall construction
-
Ceiling and wall decoration
-
New tiles fitted and grout residue cleaned, sealant complete
-
Existing fixtures removed, holes filled with sealant
-
Existing tiles and grout cleaned
-
New vinyl floor fitted with PVC skirting
-
Existing floor covering cleaned
-
Door decoration
-
Radar lock fitted, "D" Handle and Push plate
-
Long mirror installed on back of door
-
Toilet door signage removed
-
Lighting - working
-
Ventilation - working
-
Hand Dryer - working
-
DDA alarm fitted and working, light alarm working
-
Toilet, installed & flushing, DDA seat include
-
Sink & taps, installed & working, sealant fitted
-
No leaks from water feeds
-
No leaks from drainpipes and traps
-
All new pipework decorated
-
DDA Doc M Rails installed
-
Mirror above sink installed (lower DDA sink only)
-
Toilet roll holder fitted
-
Pedal Bin Present
-
Other notable Items
Other Toilets
-
-
Ceiling and wall construction
-
Ceiling and wall decoration
-
Door decoration
-
Radar lock fitted - if applicable
-
Lighting - working
-
Ventilation - working
-
Toilet, installed & flushing, new seat if required
-
Sinks & taps, installed & working, sealant fitted
-
No leaks from water feeds
-
No leaks from drainpipes and traps
-
All new pipework decorated
-
Mirror above sink installed
-
Toilet roll holder fitted
-
Existing floor covering cleaned
-
New vinyl floor fitted with PVC skirting
-
Toilet door signage removed
-
Other notable Items
Office
-
Ceiling and wall construction
-
Ceiling and wall decoration, Inc. Skirtings
-
Flooring installed correctly
-
Door decoration
-
Door glazing frosted and Spy Viewer installed
-
Coded door locks, door handles working
-
Fire door "Keep Shut" signage installed
-
Wall mounted shelving supplied, installed & secure
-
Desk area installed & secure
-
Lighting working
-
Socket and data installed in dado trunking
-
Data cabinet supplied, on plinth & installed (Note: air flow to cabinet)
-
Electrical sign off sheet left in the Cabinet
-
Electrical & Reflective ceiling drawing left in Cabinet
-
Coms Cab Numbered Correctly
-
Data cables sleeve protected
-
CCTV monitor installed and working
-
Key cabinet supplied & installed
-
Notice board supplied & installed
-
Master key box supplied & installed
-
Undercounter filing cabinet supplied
-
Office chair supplied x2
-
Office bin supplied & installed
-
Safe installed
-
Coat Hooks
-
Other notable Items
Staffroom
-
Ceiling and wall construction
-
Ceiling and wall decoration, Inc. Skirtings
-
Flooring installed correctly
-
Water heater installed & working if applicable
-
Door decoration if applicable
-
2x foldable chairs
-
Lockers supplied
-
Other Notable Items
Other BOH Areas
-
Ceiling and wall construction
-
Ceiling and wall decoration, Inc. Skirtings
-
Flooring installed Correctly
-
Water heater installed & working if applicable
-
Door decoration if applicable
-
Other Notable Items
Outside Areas
-
Air Conditioning Condensers, Installed & working
-
Air Conditioning Condensers cages fitted if applicable
-
Ash tray / Smoking area if applicable
-
Flooring if applicable
-
Fire Exit / Rear working
-
Fire Escape Exit Doors, Push bar to open on Internal side
-
Fire Escape Exit Doors, "Fire Door Keep Clear" Sticker on External side
-
Rear PIR Floodlight
-
Rear yard secure
-
Other notable Items
Handover Check List
-
Location of Electric Meter Reading
-
Location of Fuse Board
-
Location of Store Front Lighting Switch
-
Location of Last Man Switch
-
Location of Water Meter Reading
-
Location of Stop Cock
-
Location of A/C Controller
-
Location of D/P Box (BT Line)
-
Handover of Keys and Fobs, Take picture and agreed quantity (5No.)
-
Door Codes / Gate Codes on masking tape on all doors
-
Intruder alarms working & training provided
-
Fire alarms working & training provided
-
Box of ceiling tiles (white & black) left on site
-
Tin of paint left on site