Title Page

  • Client

  • Contrcator

  • Conducted on

  • Prepared by

  • Location
  • Contractors Onsite (Name and Count)

  • Personnel Count

General Work Activities

  • If observed check box (If not checked then it is N/A)

  • Supervisor present during activities

  • Workers trained for task

  • JHA in place and reviewed with crew <br>

  • Worker(s) with proper PPE for activities

  • Plan to protect workers from recognized hazards

  • Worker trained for proper equipment use

  • Fall protection plan <br>

  • Workers using fall protection as needed

  • Qualified Equipment Operators a

  • Equipment in use inspected, maintained, and used as required

  • No unauthorized modifications of equipment

  • No visible damage to equipment

  • Permit issued and posted in immediate work area as needed

  • Work area cleared and unobstructed

  • Trip/slip hazards controlled

  • Proper use of equipment as intended

  • Clearance from surrounding hazards maintained

  • Environmental hazards identified and controlled

  • Fire prevention and suppression provided

  • Tool guards and safety features provided and maintained on all tools

  • Adequate lighting provided for task

  • Construction waste properly controlled and disposed of

  • Work area properly secured from unauthorized access

  • Measures provided to protect others in work area

  • Proper containers for storage and handling of materials

  • Issues not currently identified in this section

Confined Space

  • Supervisor present during activities

  • Workers trained for task

  • JHA in place and reviewed with crew <br>

  • Qualified equipment operators

  • Worker(s) with proper PPE for activities

  • Fall protection plan <br>

  • Workers using fall protection as required

  • Equipment in use inspected, maintained, and used as required

  • Type of confined space determined <br>

  • Permit space plan developed and communicated

  • Permit issued as needed

  • All present hazards isolated or controlled

  • Air quality tested and continuously monitored

  • Alarms and warning devices functioning properly

  • Ventilation provided

  • Illumination or work area provided

  • Work area controlled for access

  • Warning/information and signage posted

  • Stand by worker trained and equipped for task

  • Entry worker(s) trained and equipped for task

  • Respiratory protection provided as needed

  • Portable equipment grounded and insulated as required

  • Access/egress provided

  • Clearance from surrounding hazards manitained

  • Emergency plan provided

  • Emergency equipment provided

  • Means of communication provided

  • Issues not currently identified in this section

Cranes and Hoisting Equipment

  • Supervisor present during activities

  • Workers trained for task

  • JHA in place and reviewed with crew <br>

  • Qualified Equipment Operators

  • Worker(s) with proper PPE for activities

  • Fall protection plan <br>

  • Workers using fall protection as required

  • Equipment in use, inspected, maintained, and used as required.

  • No visible damage to equipment

  • Annual inspection completed and documented

  • Daily inspections completed and documented

  • Labels and load chart in place and legible

  • Safety features of equipment operational and in use

  • Alarms and Warning Devices functioning

  • Operator Manual provided

  • No unapproved modifications of equipment

  • Ground level, stable, unobstructed and able to support load

  • Additional ground support pads provided as required

  • Pathway of travel level, stable, unobstructed, and able to support intended load

  • Anti Two block device provided and operational

  • Swing Radius Barricaded

  • Tag lines used on all lifts

  • Area below lift secured or overhead protection provided

  • Clearance of surronding hazards maintained

  • Means of overhead lift warning provided

  • Qualified Riggers identified and documented

  • Rigging Equipment inspected, tagged, maintained, and used properly

  • Base of tower crane secured from unauthorized access

  • Emergency shut down provided

  • Material layout and lift sequence controlled

  • Multiple (christmas tree) lifts are not being performed

  • Critical lift plan developed and communicated as needed

Electrical

  • Supervisor present during activities

  • Workers trained for task

  • JHA in place and reviewed with crew <br>

  • Worker(s) with proper PPE for activities

  • Fall protection plan <br>

  • Workers using fall protection as needed

  • Workers trained for proper equipment use

  • Qualified equipment operators provided as needed

  • Equipment in use, inspected, maintained, and used as required.

  • Labels in place and legible

  • No unauthorized modifications of equipment

  • No visible damage to equipment

  • Permits issued and posted in the immediate work area as needed

  • Work area clear and unobstructed

  • Trip/slip hazards controlled

  • Proper use of equipment as intended

  • Clearance from surrounding hazards maintained

  • Electrical cord condition. Proper size for load?

  • Temporary panels installed and maintained.

  • Energized panels labeled, secured and controlled.

  • Fire prevention and suppression provided

  • No storage in or around panels

  • GFCI in use as required

  • Proper grounding of equipment

  • Lightening protection provided as required

  • High Voltage proximity plan

  • Lockout / Tagout procedures provided

  • Temporary lights installed and maintained

  • Engergized switches, receptacles, and outlets covered

  • Enclosures secured from unauthorized access

  • Portable tools grounded and insulated

  • Issues not currently identified in this section

Excavation

  • Supervisor present during activities

  • Competent person identified and documented

  • Competent person present during activies

  • Competent person conducts duties as required

  • Workers trained for task

  • JHA in place and reviewed with crew <br>

  • Qualified equipment operators provided as needed

  • Worker(s) with proper PPE for activities

  • Fall protection plan <br>

  • Workers using fall protection as needed

  • Equipment in use, inspected, maintained, and used as required.

  • Soil classification determined

  • Trench plan developed and communicated

  • Permits issued as needed

  • Surface encumbrances removed or supported

  • All present hazards isolated or controlled

  • Excavation support system (shoring/benching) provided

  • Spoils, materials, equipment located appropriate distance from excavation

  • Barriers provided and maintained around open sides

  • Soft barricades offset minimum 6 feet

  • Walkway, bridging, or plates provided as needed

  • Overhead protection provided for workers in excavation

  • Utilities/underground installations located prior to excavating

  • Plan in place when location of underground installations not known

  • Underground installations protected, supported, or removed

  • Proper access/egress provided

  • Clearance from surrounding hazards maintained

  • Accumulation of water controlled

  • Emergency plan provided

  • Emergency equipment provided

  • Air quality tested/monitored as needed

  • Backfill of excavation conducted promptly

  • Issues not currently identified in this section

Fall Protection

  • Supervisor present during activities

  • Competent person identified and documented

  • Competent person present during activies

  • Competent person conducts duties as required

  • Workers trained for task

  • JHA in place and reviewed with crew <br>

  • Qualified equipment operators provided as needed

  • Worker(s) with proper PPE for activities

  • Fall protection plan <br>

  • Workers using fall protection as needed

  • Equipment in use, inspected, maintained, and used as required.

  • Appropriate anchorage for system

  • Anchorage points positioned above workers

  • Workers protection provided at all times

  • Appropriate lifelines provided as needed

  • Lifelines protected from damage

  • Fall protection system designed and approved by qualified person

  • Illustration of designed system provided

  • Systems installed as designed

  • Number of workers utilizing systems as desined

  • No visible damage of fall protection system

  • No excessive slack in system

  • All system components compatible

  • Labels in place and legible

  • Fall protection equipment properly worn

  • Fall protection system in use does not allow for pendulum swing

  • Clearance from surrounding hazards maintained

  • Guardrails systems properly installed and maintained

  • Guardrails free of snag, puncture, or laceration hazards

  • Soft barricade/warning line offset minimum 6 feet

  • Cable guardrails installed properly and identified as required

  • Overhead protection provided as needed

  • Emergency plan provided

  • Emergency equipment provided

  • Impalement protection provided as required

  • Issues not currently identified in this section

Fire Prevention & Suppression

  • Supervisor present during activities

  • Workers trained for task

  • JHA in place and reviewed with crew <br>

  • Worker(s) with proper PPE for activities

  • Equipment in use, inspected, maintained, and used as required.

  • No unapproved modifications of equipment

  • No visible damage to equipment

  • Permits issued and posted in the immediate work area as needed

  • Clearance from surrounding hazards maintained

  • Fire prevention/suppression plan provided

  • Fire extinguishers provided and maintained as required

  • Site maintained to allow emergency response as needed

  • Combustible/flammable materials in quantities for immediate use

  • Gas cylinders stored and secured properly

  • Standpipe charged as construction progresses

  • Water supply provided, maintained and accessible for emergency use

  • Smoking areas designated

  • Waste containers provided and maintained

  • Issues not currently identified in this section

Ground supported Scaffold installation / use

  • Competent person identified and documented

  • Competent person present during activies

  • Supervisor present during activities

  • Workers trained for task

  • JHA in place and reviewed with crew <br>

  • Qualified equipment operators provided as needed

  • Worker(s) with proper PPE for activities

  • Fall protection plan <br>

  • Workers using fall protection as needed

  • Equipment in use, inspected, maintained, and used as required.

  • Tag on scaffold indicating current status in place at access points

  • Proper base (base plate, rollers, sill plates) provided

  • No visible damage to scaffold components

  • Ground support appears level stable, unobstructed, and able to support intended load

  • Structural Components in place and secure

  • Scaffold secured from movement

  • All work levels completely decked

  • Guardrails and toe boards installed

  • Scaffold capacity documented

  • Scaffold does not appear to be overloaded

  • Access ladders provided at each level

  • No apparent fall exposures from gaps or openings

  • Work platform does not appear to be in excess of 8" from work face

  • Materials not stacked above height of toe boards

  • Overhead protection provided as required

  • Rolling scaffold locked from movement during use

  • Rolling scaffold not occupied during movement

  • Pathway of rolling scaffold level, clear, unobstructed, and able to support intended load

  • Scaffold inspected and Green Tag provided once completed

  • Issue not currently identified in this section

Housekeeping

  • Supervisor present during activities

  • JHA in place and reviewed with crew <br>

  • Worker(s) with proper PPE for activities

  • Plan to protect workers from recognized hazards

  • Worker trained for proper equipment use

  • Equipment in use, inspected, maintained, and used as required.

  • No unauthorized modification of equipment

  • Qualified operators provided as needed

  • No visible damage to equipment

  • Workers trained for task

  • Work area cleared and unobstructed

  • Trip/slip hazards controlled

  • Clearance from surrounding hazards maintained

  • Signs posted to warn of hazards

  • Floor penetrations covered, secured, and identified

  • Adequate lighting provided in all areas

  • Construction waste properly controlled and disposed of

  • Anti-slip flooring provided as needed

  • Aisle unobstructed and clearly marked

  • Exit signs posted and maintained as needed

  • Spills, leaks, and water accumulation cleaned properly

  • Waste containers provided and maintained

  • Proper containers for storage and handling of materials

  • Storage areas maintained and accessible

  • Materials stacked and stored properly

  • Powder shots managed properly

  • Round stock managed properly

  • All access/egress points maintained and unobstructed

  • Dust control measures provided

  • Pathway to emergency equipment maintained and unobstructed

  • Barricades and/or signage poseted as required

  • Steps/ramps provided at walkways w/ 19" elevation changes

  • Areas outside of building(s) free of weeds, debris, and trash

  • Issues not currently identified in this section

Ladder Usage

  • Supervisor present during activities

  • Competent person identified and documented

  • Workers trained for task

  • Workers trained for proper ladder usage

  • JHA in place and reviewed with crew <br>

  • Worker(s) with proper PPE for activities

  • Fall protection plan <br>

  • Workers using fall protection as needed

  • Equipment in use, inspected, maintained, and used as required.

  • Labels provided and legible

  • No unauthorized modification of equipment

  • No visible damage to equipment

  • Permits issued and posted in the immediate work area as needed

  • Work area cleared and unobstructed

  • Ladder properly positioned and secured from movement

  • No metal ladder in use

  • Proper use of equipment as intended

  • Clearance from surrounding hazards manitained

  • Proper ladder in use for task

  • Workers maintaining proper positioning on ladder

  • Ladder support appears level, stable, unobstructed, and able to support intended load

  • Proper extension of access ladder to work platform

  • Approach path to access ladder guarded

  • Minimum of two (2) independent means of access/egress provided from each work level

  • Hoist rope provided at all access ladder

  • Issues not currently identified in this section

Motorized Equipment

  • Supervisor present during activities

  • Qualified operators identified and documented

  • Workers trained for task

  • JHA in place and reviewed with crew <br>

  • Worker(s) with proper PPE for activities

  • Equipment in use, inspected, maintained, and used as required.

  • Labels in place and legible

  • No unapproved modifications of equipment

  • No visible damage to equipment

  • Alarms/warning devices functioning properly

  • Operators manual provided

  • Proper use of safety features by operator

  • Proper use of equipment as intended

  • Operator remains in control of equipment at all times

  • Trained flagman/Spotter provided as needed

  • Travel path or base appears level, level, stable, unobstructed, and able to support intended load

  • Clearance from surrounding hazards maintained

  • Permit issued and maintained as needed

  • Whip checks provided at all connections on compressed air hoses

  • All safety features on equipment functioning

  • Issues not currently identified in this section

Project oversight

  • Supervisor present during activities

  • Project Safety coordinator and/or Project Safety assistant(s) present during work activities

  • Persons responsible for safety document maintenance

  • Project safety management plan for current conditions

  • Plan(s)to protect workers from recognized hazards

  • Emergency action plan maintained for current conditions

  • Means to ensure supervision present for all tiered contractors during work

  • Means to ensure that equipment in use inspected, maintained, and used as required

  • Means to ensure all workers are orientated and badges issued prior to work start

  • Means to communicate/re-enforce disciplinary policy

  • Means to ensure daily development and submission of JHAs

  • Current chemical inventory and appropriate SDS

  • Return to work Policies for all tiered contractors

  • Site specific safety plan for each tiered contractor

  • Competent person(s) documentation for all tiered contractors

  • Subcontractor safety representative (SSR) identified for each contractor

  • Project safety meeting(s) attendance

  • All tiered contractors enrolled/exempted in ROCIP

  • Maintenance of contractor's insurance policies

  • Emergency contact information as needed

  • Contact information for safety representatives and supervision for all tiered contractors

  • Maintenance of minutes for all safety related meetings

  • Equipment operator qualifications

  • Trench safety plans

  • Incident/injury reports

  • Arrangements for medical treatment on site and off

  • First-aid equipment and supplies provided and maintained

  • Safety related signs and posters posted as required

  • Drinking water management

  • Sanitation management

  • Perimeter fencing, gates, and public protection provided and maintained

  • Vehicle paring and traffic management

  • Street, curb, and sidewalk protection

  • Adequate access/egress provided and maintained from all work areas

  • Exterior lighting management

  • Project visitor entry management

  • Issues not currently identified in this section

Scissor And Aerial Lift Operation

  • Supervisor present during activities

  • Workers trained for task

  • JHA in place and reviewed with crew <br>

  • Qualified operators provided as needed

  • Worker(s) with proper PPE for activities

  • Fall protection plan <br>

  • Workers using fall protection as needed

  • Equipment in use, inspected, maintained, and used as required.

  • No visible damage to lift

  • Labels in place and legible

  • Safety features of lift operational and in use

  • Alarms and warning devices functioning properly

  • Basket and ground controls functioning properly

  • Operator manual provided

  • No unapproved modifications of equipment

  • Workers positioned in lift as required by manufacturer

  • Ground support appears level, stable, and able to support intended load

  • Pathway of travel clear and unobstructed

  • Materials in lift secured from falling

  • Area below lift secured or overhead protection provided

  • Clearance from surrounding hazards maintained

  • Platform clear of slip/trip hazards

  • Materials not stacked above height of toe baords

  • Issues not currently identified in this section

Suspended scaffold

  • Competent person identified and documented

  • Competent person present during activies

  • Supervisor present during activities

  • Workers trained for task

  • JHA in place and reviewed with crew <br>

  • Qualified operators provided as needed

  • Worker(s) with proper PPE for activities

  • Fall protection plan <br>

  • Workers using fall protection as needed

  • Equipment in use, inspected, maintained, and used as required.

  • Labels on scaffold and outriggers provided and legible

  • Counterweights installed per manufacture's requirements

  • No visible damage to scaffold components

  • Tie back cables installed and properly anchored

  • Structural components in place and secure

  • Independent lifelines provided for each worker on scaffold

  • Lifelines protected from damage

  • Guardrails and toe boards installed

  • Scaffold capacity documented

  • Scaffold does not appear to be overloaded

  • Proper access provided to scaffold

  • No apparent fall exposures from gaps or openings

  • Work platform clear and unobstructed for worker movement

  • Material not stacked above height of toe board

  • Overhead protection provided as required

  • No additional work being performed below suspended scaffold

  • Scaffold insepcted and green tag provided at outrigger and scaffold platform once complete

  • Means to secure scaffold from movement after work hours

  • Issues not currently identified in this section

Welding & Cutting Operations

  • Supervisor present during activities

  • Qualified operators identified and documented as needed

  • Workers trained for task

  • JHA in place and reviewed with crew <br>

  • Fall protection plan <br>

  • Workers using fall protection as needed

  • Worker(s) with proper PPE for activities

  • Equipment in use, inspected, maintained, and used as required.

  • Labels provided and legible

  • No unauthorized modification of equipment

  • No visible damage to equipment

  • Permit issued and posted in immediate work area

  • Workers trained for fire prevention and suppression provided

  • Portable fire protection provided

  • Gas cylinders properly handled, maintained and stored

  • Flash back arrestors installed at gauges

  • Clearance from surrounding hazards maintained

  • Means to prevent sparks/heat from leaving immediate work area

  • Proper means to ignite cutting torch provided

  • All safety features on equipment installed and functioning

  • Proper eye protection for welding/cutting provided

  • Flash screens provided as needed

  • Welding machines properly grounded and insulated

  • Issues not currently identified in this section

  • Reviewed with signature

  • Auditor signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.