Title Page
-
Site conducted
-
Conducted on
-
Conducted by
-
Customer company name
Site details
-
Site address including postcode
-
Will the postcode take you to the correct part of site?
-
Please specify directions/location
-
Are there any site map/logistics plans
-
Add map/logistic plan
-
Add site location
-
Add site location
Specific timings
-
Can delivery or collection be made at any time between Monday to Friday 8am-5pm?
-
Please state requirements for timed deliveries/collections. For example, pre 7am delivery or between school times 9:30am-2:30pm, Weekend works only?
Site requirements.
-
Who is the principal contractor on site?
-
Do they have specific documentation requirements? For example, permits, site specific RAMS, maximum ground bearing pressures, FORS certificates or temporary work requirements etc.
-
Please specify all requierments
Site rules
-
Are they any site PPE or rules notice boards
-
Add photo of site PPE or rules
Requirements continued
-
Are there any specific client/contractor requirements regarding safety controls? For example, site specific working at height rules, site induction instructions, or ‘bottom lifting’ requirements.
-
Please specify all requierments
Height and width requirements
-
Height and width requirements
-
Is access and egress to and from site restricted for a loaded lorry, Height and width?
-
Please specify restrictions
-
Add photo
Length requirements
-
Length requirements
-
Is access and egress to and from site restricted with or without a trailer or artics?
-
Please specify restrictions
-
Add photo
Weight restrictions
-
Is access and egress to and from site restricted by any weight restrictions?
-
Please specify restrictions
-
Add photo
Changes to site
-
Will access and egress to and from site change for the collection?
-
Will this impose any restrictions?
-
Please specify all restrictions
External restrictions
-
Are there any external restrictions on the approach to site which may obstruct the delivery/collection? For example, parked cars, narrow roads, dips in the road and raised humps, low bridges, sharp turns, overhanging branches, schools, roadworks etc.
-
Please state, and how will this be managed? for example, customer to arrange parking suspensions or customer to arrange traffic managements.
-
Is the customer aware of this?
-
The customer needs to be made aware of their responsibilities.
-
Add photos of the restrictions
-
Add photos of the restrictions
Interface
-
Is the site open to the general public? For example, a hospital, shopping centre, school, leisure centre, public highway, public car park etc.
-
How will segregation of the public be managed? For example, segregation barriers, traffic management, pedestrian management.
-
If a banks man is required it is the customers responsibility to supply this
On site personnel
-
Will there be a Client representative on site whilst the operation is in progress?
-
State the name and contact information of the customer on site representative
-
Please provide details of customer emergency contact
Set up requirements
-
Set up requirements
-
Is there sufficient space available for the lorry loader vehicles to maneuver and set up for lifting, including vehicle stabilizers?
-
Please specify the restrictions
-
Add photo
-
Will site require Jack pads to level the ground
-
Jack pad will need to be contacted and a site survey arranged
-
The ground conditions will need to be level and fit for purpose capable of withstanding the loadings of the units ground bearing pressures. This is the responsibility of the customer. Has the customer been made aware of this?
-
The customer must be informed of their responsibilities.
-
Are the units being stacked?
-
Is there sufficient space for access equipment to seal the external connections of the units? (MEWP, Scissor lift, Scaffold tower).
-
Access to the sealing point where the units connect are a minimum requirement.
Loading/offloading restrictions
-
Are there any restrictions on site preventing us from offloading the unit immediately to the side of the delivery lorry?
-
Please specify the restrictions
-
Add photo
-
Will the site require our specialist lorry mounted loader crane for lifting over the front of the vehicle cab?
-
Please give as much detail as posible
-
Add photos
Work area
-
Is the work area clear with adequate hard standing (including site access)? Note: vehicles will not drive over or set up on grass or muddy areas.
-
Please specify
-
Add photo
Excavations
-
Ground conditions
-
Are there any excavations close to the working area? Please note lorry mounted loader crane stabilisers need to be set up away from excavations.
-
Please specify, including distances
-
Add Photo
Voids, manholes and services
-
Is the ground around the working area free from underground voids and services, manhole covers, and backfilled areas?
-
Please specify
-
Add photo
Ground conditions
-
Are the ground conditions where the unit(s) will be positioned be of suitable strength to accommodate the lorry loader crane stabilisers, and the weight of the unit(s)?
-
Please specify
-
Add photo
Ground type
-
Please state ground type for the crane and units. For example, tarmac, concrete, hardstanding
-
Add photo
Ground bearing pressures
-
Are the Ground Bearing Pressure known (GBP) in kN/m2 or T/m2
-
Please specify
-
If any, please attach temporary works drawings/documents
Overhead hazards - Power lines
-
Are there any nearby overhead electricity cables within 40 meters of site?
-
Front elevation requierments
-
Are the power lines further away than the requirement drawings?
-
Please specify in as much detail as possible
-
Add photo
-
Are the power lines further away than the requirement drawings?
-
Please specify in as much detail as possible
-
Add photo
-
Are the power lines further away than the requirement drawing?
-
Please specify in as much detail as possible
-
Add photos
-
Are the power lines further away than the requirement drawing?
-
Please specify in as much detail as possible
-
Add photos
Other overhead hazards
-
Are there any other overhead restrictions in the working area? For example, telephone cables, pipework, canopies, trees, bridges etc.
-
Please specify
-
Add photos
Other Hazards
-
Are there any obstructions such as hedges, walls, or fences we need to lift the unit over?
-
Please specify
-
If this is a blind lift where the operator cannot see the vehicle, crane, load and the loads intended path at all times this will require a second man on site
-
Add photos of the obstructions
Special Requirements
-
Are any units to be loaded/unloaded onto any Gantry's, platforms, scaffolding, multilevel carparks or bridges
-
Please give as much information as possible including and temporary works designs
-
Please add photos and supporting documentation
Network rail
-
Is the site on network rail property?
-
Please give as much detail for the site regarding requirements, distances from lines, AOL etc. and add photo(s)
-
Add photo
Network rail continued
-
Is the site within 30m of a network rail boundary fence or network rail line?
-
Please state including distances
-
Add photo
Additional hazards
-
Are there any other hazards we need to be made aware of that is not specified so far?
-
Please give as much information as possible
-
Add photo and/or supporting documentation
Proposed set up
-
Has a drawing been submitted with the proposed site set up?
-
This is a minimum requirement
-
Add drawing of the proposed site set up
Site layout
-
Have you walked/drove the vehicle transit route?
-
Why?
-
Add the site layout sketch