Title Page

  • Project No.

  • Project Manager

  • Av Control Programming by

  • DSP Programming by

  • AV Consultant

  • Installation Technicain

  • Installation begun

  • Project completion date (go live date)

  • Equipment Configuration Date

  • Configuration Technicians

  • General Comments

Pre Installation

Pre Installation- Configuration and Inspection

  • All Equipment Serial Numbers have been collected, recorded and assigned to specific locations for this project

  • Please provide information what is missing

  • Hardware free from physical damage -- If no please provide photo example.

  • Please take a photo of Damaged items

  • Have all devices been updated to the required firmware version for this project

  • Have all devices requiring pre configuration been completed?

  • Review Specific Client Installation Standards and ensure all provided equipment and cabling conforms to this standard. If not client standard exists confirm all supplied equipment conforms to MNGD standards and all equipment and cabling is present and accounted for

Installation Safety and Access

  • Are there any safety concerns you have with the installation area you will be working in

  • Please provide any photos that show the safety concern

  • Please provide detail of the safety concern and any actions you can take if it is Manageable to mitigate the risk

Installation

  • Please ensure all information is true and accurate, any section that is checked as not complete must remain this way until it can be completed.

Cabling

  • Cable Bend radius is as per cable spec and is free from undue stress - - If no please provide photo example.

  • Note photo example should be provided where the bend radius violation is either by others or unavoidable due to the required installation location. If any other reason the cable should be re-run or replaced with correct bend radius adhered to.

  • Please provide photo example of bend radius violations and or undue stress

  • Cable Management - Cable lengths are not excessive and are laced neatly and securely with adequate separation between signal types using Velcro ties only. - If no please provide photo example and notes of specific violations.

  • Note that Photo example should be provided only in cases that the violation is unavoidable, if otherwise then the cabling should be managed in such a way as to adhere to this standard.

  • Please provide photo example

  • All Cables labels including color clips where required are installed for all cables at both ends and are as per schematic

  • Are all labels clear and free from damage or distortion

  • Cable Condition - Cables are free from visible damage or other defect, inlcuding poor termination, exposed copper or poor solder joins

  • Please provide photo of damaged cables

  • Cable connections as per final schematic

  • Please provide detail

  • Has all equipment been installed as per schematic

  • Please inform Project Manager of missing items this section will remain not complete until this is finished

  • Installation has been left neat and tidy where mess has been impacted by MNGD

  • All installed equipment powers up and is operational (Use temporary power if needed, operational excludes issues where Config or Network has yet to be completed)

Configuration

  • Confirm all equipment firmware has been updated to the required version for this project (review Pre-Installation check list item and only re-confirm if new or replacement equipment has been used)

  • Pass Through Wall Plates

  • Are plates free from damage or missing components?

  • Please provide photos

  • Has correct pass through plate been used as per final schematic?

  • Please provide photo

  • Data Wall Plate

  • Is plate free from visible damage or missing components

  • Please provide photo

  • Is the wall port Siemon branded?

  • Please provide photo

  • Please provide details

  • Are the ports color coded blue as per UTS Networks specification

  • Please provide photos

  • Please provide details

  • Are port correctly labelled using UTS IT approved naming system

  • Please provide photos

  • Please provide details

  • Confirm correct Program version has been loaded to all required devices

  • Confirm correct DSP version has been loaded to all required devices

  • Is all installed equipment tested and functioning as per design and if free from defects

  • Has a walk through been conducted with the client to demonstrate all installed systems are working to their satisfaction

Handover Docs

MNGD Handover

  • Ensure all commissioning reports have been saved, completed and handed over

  • Has all MNGD documentation been updated and correctly stored

  • Has Service Pages been set up for this project in MNGD Confluence site

  • Have all manuals, remotes and peripherals been handed over?

  • Have testing reports been provided for all DM lines to certify the lines?

  • Have As Built schematics been provided?

  • Has a copy of the final compiled code been provided?

  • Have all Certificates of Compliance been provided

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.